Global Design Effort Working Group C Conventional Facilities Parallel Session IRENG07 V. Kuchler, A. Enomoto, J. Osborne September 19, 2007.

Slides:



Advertisements
Similar presentations
Nov. 07 DR-KOM-CFS 1 Damping Rings KOM Conventional Facility & Siting Overview Tom Lackowski Acknowledgment: Atsushi Enomoto, Jean-Luc Baldy, John Osborne,
Advertisements

9/17/07 ILC Detectors 1 Conventional Utilities Tom Lackowski.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Nov. 19, 2008 ILC08 Global Design Effort 1 Status Report Alternative Siting and Tunnel Design Tom Lackowski.
Global Design Effort Goals and Introduction Andrei Seryi, SLAC, September 17, 2007.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS ALCPG 09 AD&I Parallel Linear Collider Workshop of the Americas of the Americas Tunnel Life Safety and Egress Accelerator.
November 17, 2008 ILC08 HVAC and VE Update November 17, 2008 ILC CFS Workshop 2008 Chicago Lee Hammond, Fermilab Global Design Effort.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
1 HVAC OVERVIEW and VALUE ENGINEERING ITEMS August 13, 2008 CLIC Working Group CES Lee Hammond, Fermilab.
Value Engineering Session Air Treatment / HVAC November 27, 2007 Lee Hammond, FNAL CFS.
Global Design Effort Detector concept Plenary introductory talk IRENG07 Kurt Krempetz September 17, 2007.
Conventional Facilities and Siting Global Design Effort Safety Requirements for IR Conventional Facilities and Siting Group Safety Requirements for IR.
31, May 2007 ILC DESY 07 1 Surface Building Design Development Tom Lackowski GDE.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
1 Process Water and Air Treatment 01 June 2007 Emil Huedem, Maurice Ball, Lee Hammond Fermilab.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP Status and Overview.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
1 Alternative assembly option of ILD Y.Sugimoto 2010/10/18 ILD Integration
ARUP Studies Update ILC Interaction Region Design Requirements John Osborne CERN, Yung Loo & Matt Sykes (ARUP) CFS-ADI Joint Meeting - University of Tokyo.
Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
Global Design Effort - CFS SiD Collaboration Meeting - SLAC 1 VERTICAL ACCESS ILC IR LAYOUT for SiD and ILD CONVENTIONAL FACILITIES AND SITING.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update November.
BDS Magnet-Power System-Facility Optimization1 ILC BDS Kickoff Meeting Basis for Magnet, Power System and Cooling Facility Optimization Discussion Paul.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
SLAC_OCT07 BDS-KOM-CFS 1 Beam Delivery System & Interaction Region KOM Conventional Facility & Siting Overview Fred Asiri/SLAC Acknowledgment: Atsushi.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
Global Design Effort - CFS ILC10 Beijing, March, Single-Tunnel Accelerator Configuration Of Asian Region Atsushi Enomoto (KEK)
A. Hervé - 17 Oct CLIC-Workshop CLIC Workshop: 17 Oct. 07 Interaction Region Engineering at ILC Push-Pull Option A. Hervé/CERN.
Global Design Effort - CFS GDE Plenary Session 1 LCWS10 GDE Plenary Session SB 2009 ILC CONVENTIONAL FACILITIES AND SITING GROUP A. Enomoto, V.
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
A. Hervé - 17 Sept ILC-IRENG IRENG07 Workshop: 17 Sept. 07 Various Possibilities for disposition of Experimental Area A. Hervé/CERN.
3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski.
Global Design Effort - CFS AD & I Meeting - DESY AD & I Meeting - DESY 1 AD&I Meeting CONVENTIONAL FACILITIES AND SITING GROUP Main Linac Tunnel.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
Conventional Facilities and Siting GG Global Design Effort BILCW 07 - Beijing1 Conventional Facilities and Siting Global Group Summary Report.
March 22, –  Design Concept & Hall Layout  Access Tunnel  Top heading Tunnel  Displacement of detector hall by push-pull operation.
Global Design Effort Working Groups A & C Parallel Session Summary IRENG07 A. Herve, T. Markiewicz, T. Sanuki, Y. Sugimoto V. Kuchler, A. Enomoto, J. Osborne.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update December.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
AWLC14 - FERMILAB May 12-16, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, A Enomoto, J Osborne.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
1 CFS Utilities – What’s included in RDR for IR July CFS Utilities – IRENG WG C WATER COOLING: none. Unknown loads on IR. Only have water plants.
SuperB Experimental hall General considerations on the Babar experimental area Preliminary space requirements hall proposal. A floor plan. Specification.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
CFS EDR KICK OFF MEETING Air Treatment August 23, 2007 Lee Hammond, FNAL CFS.
E- source kick-off meeting e- Source RDR- Conventional Facility & Siting Overview Fred Asiri/SLAC.
1 Update of detector hall in mountain regions Y.Sugimoto in Granada.
Review of the International Linear Collider (ILC) Electrical and Mechanical System Design to be held at CERN on 21 March, 2012 The purpose of the Review.
Conventional Facilities and Siting Global Group (ARCFS)
Installation Global System
CLIC Civil Engineering Update
Conventional Facility & Siting (CF&S) Overview for the Positron Source
Updated Design of Detector Hall
Yasuhiro Sugimoto 2012/2/1 ILD integration meeting
LCWS11 AWG9 PARALLEL SESSION SUMMARY
Experimental hall design in Japanese site
Americas KlyCluster Cost Analysis Overview
ILC GLOBAL SYSTEMS MEETING
Conventional Facilities and Siting Global Group (CFS) SLAC Update December 10, 2007 Acknowledgment: Jerry Aarons, Clay Corvin, and Esther Kweon Fred Asiri.
Tom Lackowski Revised 10/12/2011
Presentation transcript:

Global Design Effort Working Group C Conventional Facilities Parallel Session IRENG07 V. Kuchler, A. Enomoto, J. Osborne September 19, 2007

2 IRENG07 Working Group C - Conventional Facilities Overview Agenda Items for Parallel SessionsAgenda Items for Parallel Sessions –Hall and Building Sizes –Cranes –Shafts –Minimum Space Requirements –Services –Utilities

3 IRENG07 Working Group C - Conventional Facilities Some Preliminary Thoughts We Need to Identify the Gap, if any, Between What is Included in the CFS RDR Cost Estimate and What is Included in Each Detector Design Concept and Eventual Cost EstimateWe Need to Identify the Gap, if any, Between What is Included in the CFS RDR Cost Estimate and What is Included in Each Detector Design Concept and Eventual Cost Estimate The CFS Group Would Like to Establish the Point(s) of Contact with the Detector Design Teams for all Identified Areas of Required CriteriaThe CFS Group Would Like to Establish the Point(s) of Contact with the Detector Design Teams for all Identified Areas of Required Criteria The CFS Group Certainly Recognizes the Work Completed to Date by the Detector Groups to Establish the Required CriteriaThe CFS Group Certainly Recognizes the Work Completed to Date by the Detector Groups to Establish the Required Criteria

4 IRENG07 Working Group C - Conventional Facilities Continued We Will Need to Identify What Criteria Apply to Individual Detector Concepts and What Criteria are Common to All Detector ConceptsWe Will Need to Identify What Criteria Apply to Individual Detector Concepts and What Criteria are Common to All Detector Concepts –Weight is Certainly Detector Specific –Common Temperature and Humidity Requirements The CFS Group will use the Parallel Sessions to Further Discuss and Record the Criteria Developed and Identify Issues that Still Need ResolutionThe CFS Group will use the Parallel Sessions to Further Discuss and Record the Criteria Developed and Identify Issues that Still Need Resolution All CFS Criteria will be Added to the IRENG Interface Parameters DocumentAll CFS Criteria will be Added to the IRENG Interface Parameters Document Specific Tasks as Identified will be added as CFS EDR Work PackagesSpecific Tasks as Identified will be added as CFS EDR Work Packages

5 IRENG07 Working Group C - Conventional Facilities Value Engineering Where Options or Alternative Design Solutions are Being Considered, the Value Engineering Process can be Used to Facilitate the Decision ProcessWhere Options or Alternative Design Solutions are Being Considered, the Value Engineering Process can be Used to Facilitate the Decision Process When Employing the Value Engineering Process all Aspects of the Various Alternatives must be Considered in Order to Determine the Best “Value”When Employing the Value Engineering Process all Aspects of the Various Alternatives must be Considered in Order to Determine the Best “Value” “Value” does not Necessarily Equate to “Cost”“Value” does not Necessarily Equate to “Cost”

6 IRENG07 Working Group C - Conventional Facilities Possible Examples Crane Capacity in Detector CavernCrane Capacity in Detector Cavern –Directly Affects the Detector Assembly Process Location of Predominant Detector AssemblyLocation of Predominant Detector Assembly Complexity of the Detector ComponentsComplexity of the Detector Components Schedule ImplicationsSchedule Implications –Directly Affects the Cavern Dimensions Actual Space Required for the Crane OperationActual Space Required for the Crane Operation Size and Location of Crane Rail SupportsSize and Location of Crane Rail Supports Hook Height and Size of Component to be MovedHook Height and Size of Component to be Moved –Directly Affects the Diameter of the Access Shafts Largest Component to be LoweredLargest Component to be Lowered Implications of Lateral Movement Process in the CavernImplications of Lateral Movement Process in the Cavern – Not All of these Considerations have a Discrete Cost Implication

7 IRENG07 Working Group C - Conventional Facilities Topics for Discussion Push-pull Constraints and CriteriaPush-pull Constraints and Criteria Alignment RequirementsAlignment Requirements Detector Hall Size and DimensionsDetector Hall Size and Dimensions Detector Electrical SupplyDetector Electrical Supply HVAC and Humidity RequirementsHVAC and Humidity Requirements Process Water RequirementsProcess Water Requirements Life Safety Egress RequirementsLife Safety Egress Requirements Construction Configuration RequirementsConstruction Configuration Requirements Operational Configuration RequirementsOperational Configuration Requirements

8 IRENG07 Working Group C - Conventional Facilities Push-Pull Push-Pull Constraints and CriteriaPush-Pull Constraints and Criteria –Existing Experience can Provide a Good Basis for Discussion –What are the Prevailing Ideas for Detector Movement Systems Single Platform for Each DetectorSingle Platform for Each Detector Independent Platform(s) for Support EquipmentIndependent Platform(s) for Support Equipment Single Platform for Shield Wall MovementSingle Platform for Shield Wall Movement –What are the Current Ideas for the Platform Movement Air PadsAir Pads Hillman RollersHillman Rollers –Utility Connections Electrical ConnectionsElectrical Connections WaterWater CryogenicCryogenic –Who and How Should These Decisions be Made

9 IRENG07 Working Group C - Conventional Facilities Alignment Alignment RequirementsAlignment Requirements –Cavern Movement will be Highly Dependent on the Geology of the Chosen Site –Site Geology is Unlikely to be Modified –Once Fully Established, Final Adjustment for the Detector Should be Incorporated in the Detector Support Structure –ILC Survey and Alignment Group Must be a Partner in the Discussions Regarding Initial and Final Detector Alignment

10 IRENG07 Working Group C - Conventional Facilities Detector Hall Size General ConsiderationsGeneral Considerations –Local Geology will Determine the Actual Shape of the Cavern –A “Dimensional Envelope” Needs to be Established for Each Detector Design Assembly ConditionsAssembly Conditions Beamline Position MaintenanceBeamline Position Maintenance Garage Position MaintenanceGarage Position Maintenance –“Dimensional Envelope” Should Include all Supporting Utility Requirements –We Need to Establish the Boundary Point Between the Bottom of the Detector Support System and the Top of the Movement Platform –Exiting Requirements May Only Complicate the Issues of Detector Assembly, Maintenance and Operation

11 IRENG07 Working Group C - Conventional Facilities Electrical Requirements Detector Power RequirementsDetector Power Requirements –<750 KW for each Detector, Distribution to Hall and Building Cryo PowerCryo Power –Might be the Major Power Consumer, but less than Typical Accelerator Plant. Are there any “Special” Power or Grounding RequirementsAre there any “Special” Power or Grounding Requirements

12 IRENG07 Working Group C - Conventional Facilities HVAC Requirements Environmental ParametersEnvironmental Parameters –Hall Temp 21C with 3C Stratified Rise +/-2C Stability –Dewpoint 13C & RH 60% Maximum –Negative Hall & Positive Egress/Shaft Pressure Air Handling ParametersAir Handling Parameters –Ventilation for 100 people from Surface AHU’s –No Purge for Smoke, ODH & Activated Air ? –Fan Coil Cooling for Hall Load + 10% Process –40kW Maximum Process Air Load (10% of Total)

13 IRENG07 Working Group C - Conventional Facilities Process Water Requirements Fluid ParametersFluid Parameters –Insulated CHW Supply from Surface to HX’s –16C CHW & LCW Supply to Skids from HX’s –Elevation Head from Surface Interrupted at HX’s Equipment ParametersEquipment Parameters –90% Process Load Handled at Detector Skids –400kW Maximum Process Load –Thermal Dimensional Stability from Skid Controls –LCW Makeup from Accelerator LCW System

14 IRENG07 Working Group C - Conventional Facilities Building / Site Requirements Number of People –During Detector Construction –During Operations Offices / Meeting Rooms Machine Shops Floor Stability / Vibration Criteria Control Room Cryo Needs Environmental Requirements Uses After Detector Construction

15 IRENG07 Working Group C - Conventional Facilities Additional Issues Evolving Constraints and CriteriaEvolving Constraints and Criteria –Life Safety Egress Requirements –Construction Configuration Requirements –Operational Configuration Requirements Identification of Clear Boundaries Between CFS and the Detector GroupsIdentification of Clear Boundaries Between CFS and the Detector Groups Points of ContactPoints of Contact What’s the Next StepWhat’s the Next Step