Installing a VOR Antenna on Zenith’s “Flying Rudder” by Bill Bartlett Cutout hole using the antenna gasket as a template. Dill two holes to accommodate.

Slides:



Advertisements
Similar presentations
Thule Smart RV™ Pod Kit Installation For Smooth-Sided Fiberglass RVs
Advertisements

Sectional Assembly and Installation
HOW TO MAKE A ROCKET BY SAM CANNINGTON. THE FUSELAGE 1.Cut out a thin peace of cardboard.
ULTIMATE PORTABLE WORKSTATION Produced by Gavin Weyrich.
BalloonSat Construction Ideas and Suggestions L. Paul Verhage 9 July 2013.
Electrical Wiring Circuit Board Project. STEP 1 - Identify all Parts of the Project Saw Drill Driver w/ bits Drill w/bits (not pictured) #2 Phillips Screwdriver.
How to Make a PAPER TIGER. STEP 1: MAKE BODY TUBE 1. Use a spent engine to roll your body tube out of copier paper the short way 2. Test the size by sticking.
Dedicated to Repairing Sikorsky Rotor Blades. ABS started in June 1994 doing S-55 & S-58 blades. History.
Trim Fwd Spar End Brackets July 6, H2-2, Horizontal Stab Rear Spar 7H1-2, Stab Full Rib Corner of Forward.
Solenoid Pressure Regulator Check Valve Hand-turn Valve Pipe Clamp L-Bracket Mounting Block Plastic Tubing AN Fitting AN T-Fitting Pressure Sensor Base.
Full Ribs to Rear Spar Parts Layout July 6, H2-2, Horizontal Stab Rear Spar with upper and lower doublers.
Fiber Distribution Point for Underground VSOF-CS403A-SD Connector type Fiber Distribution Point.
E8, , Wing Damage.
The C-141 StarLifter Some assembly required. This is some of the tooling used to manufacture the C-141. These were used to shape the sides of the fuselage.
Colorado Space Grant Consortium Foam Core Class #05 Foam Core Class #05.
Senior Design: Validation of Design December 15, 2008.
Polaris 6x6 UTV Instructions for Fuel Tank Vent Tube Modification 2005 – 2009 models For further information contact: Michelle Ryerson or Carl Dorsey,
Mantle Clock. Beginning Steps Cut 2 piece 20 x 5 to make the 2 sides and top/bottom Cut 1 10 ¾ and 1- 9 from each 20 piece. This will make a side and.
Lesson 2-2a Principles of Flight
1)Aileron 2)Elevator 3)Rudder Aileron Ailerons can be used to generate a rolling motion for an aircraft. LOCATION: Ailerons are small hinged sections.
1 FREE CLIMBER 4400 ASSEMBLY INSTRUCTIONS PART NUMBER
Planning Manufacture TaskEquipmentQC/QA Mark out the shape of the speaker front and back Tri square, pencil, ruler, tape measure.
Plans for the 2015 Invention Challenge Target Paul MacNeal August 9,
Warm-Up – 8/25 – 10 minutes Utilizing your notes and past knowledge answer the following questions: What are the four forces of flight? Describes what.
Control System and Electrical Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are.
Dane Batema John Tapee Audrey Serra Patricia Roman Kyle RyanCarlos Vergara Benoit BlierDrew Capps Team 1: Lessons Learned and Vehicle Summary Team “Canard”
Respiratory Surfaces Making a Model of the Lungs.
Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing Muon System PMT Cable Routing Kirk McDonald Princeton University (July 28, 2007)
Flex Cam – Training This shows one version of a complete FlexCam system including Power Unit HCP and Compact Cam CC for piercing operation.
By Bala Dhareneni.  The fuselage, or body of the airplane, is a long hollow tube which holds all the pieces of an airplane together. The fuselage is.
Connecting to industry. Hose Coupling Safety It is important to fully inspect the overall hose assembly both prior to installation, and also after the.
New design With fewer parts and easier manufacture degrees 20mm 245.
Flat plate sensor location Installation options For more information: Rod Hyatt, (508) ASKROD.com.
CPA Micarta Based Rahul Sharma / Bill Sands. The present design shown in this document is based on the use of Micarta as the base material this will likely.
Voltage Tester Used for testing voltage on electrical outlets, fuse clips, and circuit breakers will test voltage from 120 to 600 volts.
SCT Barrel 6 Support Bearing A full-scale model of the barrel 6 support bearing has been machined at UCL (drawing G.Barbier ) It was tried out on both.
Fly Baby Monoplane Center Wing Ribs & Fin and Stab Ribs Printing Notes: Squares are on 1” centers Check with ruler prior to use Print to “ARCHITECTURE.
System Online August 20, :54:07 CET 8 th Annual CEENet Network Technology Workshop.
Side view of generator. Close up of unused grounding pad - gives provisions for mounting the absorber.
December 1, 2003PDR1 Team 5 Structures and Weights PDR #2 Scott Bird Mike Downes Kelby Haase Grant Hile Cyrus Sigari Sarah Umberger Jen Watson.
Aluminum probe carrier body Aluminum drive tube -assembled in sections, this provides up/down and rotational motion control of probe Fiber optic/ electrical.
Aircraft Motion and Control
Ziplock Container and 2L Bottle System. Bill of Materials –3 screw top Ziplock Containers –3 empty 2L soda bottles –Aquarium tubing –Aquarium pump –4.
Installing A Bathroom Shower Panel American Bath Enterprises, Inc. The Bath Tub & Shower Enclosure Innovators!
Line Follower Robot Year 9 Electronics V1.1. Step 1: Knowing The Chassis Chassis has been laser cut from 4mm fluted correx board Main P.C.B. Sensor P.C.B.
Project Document Number GTMP-5076 L-1011oem Wing Upgrades W. M. Langford Advanced Models Systems & Sensors Branch 22 June 2004 (a.k.a. L-1011_mod1) Generic.
Sentek Training Presentation © 2003 All rights reserved Sentek Pty Ltd Sentek Sensor Technologies Installation of EasyAG 50 and EasyAG 80.
DECAM LN2 PUMP REMOVAL - CHECKLIST
AEROFIX STRUCTURAL SERVICES
Antenna/Tower Reliability Tim Jellison W3YQ/KL7WV
Place template on top as guide for cutting
INSTALLING BYRNE POWER BOX INTO FLEX SYSTEM
Basic Aircraft Structure
Electrical Wiring Circuit Board Project
Service channels between Tracker and PP1
Design Refining a design.
Introduction- The Airplane
2.2 Gallon TourTank Installation
Assembly instructions for M-K all bolt together hoppercone kit.
Flag Installation on Roll-up Signs
Flag Installation on Roll-up Signs
SHEET F20-06 t-deck T11-01 vert-tail W22-01L wingtip F20-03R
McMaster linear bearing #6709K180 with guide rail suppressed
Please plug the 4 rudder pedal attachment bushings prior to powder coat also plug all nut plate holes.
Valve stem “gag” mechanism
Where to Use Warning Lines
Omega Selection Center
Presentation transcript:

Installing a VOR Antenna on Zenith’s “Flying Rudder” by Bill Bartlett Cutout hole using the antenna gasket as a template. Dill two holes to accommodate appropriate nut-plates or rivnuts. Deburr and smooth edges. Check antenna connections clearance with cut out. Antenna connections must not come in contact with the rudder. Add a dielectric edge protection if required. Or, coat your connections with electrician’s liquid tape. I used a nut-plate for the forward hole; and, a rivnut for the aft hole. 6T4-4 Vertical Tail Spar wouldn’t allow room for a nut plate.

Installing a VOR Antenna on Zenith’s “Flying Rudder” by Bill Bartlett VOR antenna installed on top 6T4-2 Tip Rib. Close up view of “AN” bolts attaching the antenna to the Top Rib.

Installing a VOR Antenna on Zenith’s “Flying Rudder” by Bill Bartlett How it looks when the rudder is attached to the fuselage. Coaxial cable is routed inside the leading edge skin.

Installing a VOR Antenna on Zenith’s “Flying Rudder” by Bill Bartlett Coaxial cable is routed through the 6T4-1 Nose Rib. Add grommet to hole through the nose rib. I placed a small clear tube around cable to help protect the cable fit the clamp.