PACS IIDR 01/02 Mar 2001 EGSE1 Otto H. Bauer MPE.

Slides:



Advertisements
Similar presentations
Istituto di Fisica dello Spazio Interplanetario - Roma (Italy) HIFI SVR#2 – SRON Groningen 05 December ICU / OBS performance.
Advertisements

PACS SVR22/23 June 2006 Erich Wiezorrek, MPE Test Facility Capabilities EGSE.
PACS IHDR MPE, 12/13 Nov 2003 PACS ICC1 ICC - EGSE, PCSS, HCSS, IEGSE - Otto H. Bauer MPE Garching.
Slide 1 MIPA Progress Presentation For SERENA Progress meeting, Santa Fee, May 2008 Prepared by Johan Svensson and Stas Barabash.
WP CO Status and Progress December 8th, 2010 Johannes Gutleber PR a-JGU, December 8th, 2010 J. Gutleber 1 R. Gutleber.
PACS IQR Kick-off ESTEC, 13 Jan 2005 PACS Management, …1 PACS Management, Funding and Schedule Otto H. Bauer MPE Garching.
Slide : 1 6/ SpaceWire Conference SpaceWire Test and Demonstration using the Integrated Payload Processing Module J.Ilstad, D.Jameux European Space.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Scott Williams 1 GLAST Large Area Telescope: Instrument Operations Center Scott.
GLAST LAT ProjectEGSE Peer Design Review, August 17, S. WilliamsEGSE Schedule and Cost Electrical Ground Support Equipment Schedule and Cost Scott.
GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V41 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S LAT.
PACS IIDR 01/02 Mar 2001 Herschel PACS SPU - IAC1 Herschel PACS - IIDR SIGNAL PROCESSING UNIT (SPU) HW Unit, Start-up SW and Low-level SW Drivers José.
MIRI software; implementation plan Peter Roelfsema.
Free Space Optical Communications Senior Design Project Fall 2011 TEAM AWESOME.
PACS IBDR 27/28 February 2002 PACS DEC/MEC1 Detectors & Mechanisms Controllers (DEC/MEC) J.-M. Gillis Centre Spatial de Liège (B)
Surgical Reprocessing (SRP) Performance Dashboard for Improved Service Team Members : John Rodriguez Jose Gonzalez Surgical Reprocessing Team Members Patricia.
PACS IBDR 27/28 Feb 2002 PACS CRE1 PACS CRE development Ybe Creten, Patrick Merken, Jan Putzeys, Vic Fonderie, Chris Van Hoof IMEC.
PACS IHDR MPE 12/13 November 2003 AIV 1 PACS IHDR Integration, Qualification and Testing Reinhard Katterloher.
PACS IBDR 27/28 Feb 2002 SPU High Level Software1 H. Bischof, A.N. Belbachir (TUVIE) F. Kerschbaum, R. Ottensamer, P. Reegen, C. Reimers (UVIE)
Timothy QuinnFIELDS iCDR – EGSE Solar Probe Plus FIELDS Instrument CDR Electrical GSE Timothy Quinn UCB 1.
PACS IIDR 01/02 Mar 2001 Instrument Interfaces1 PACS FPU Opto-mechanical Design Overview and Interfaces J. Schubert MPE.
GLAST LAT ProjectI&T PDR Presentation – Jan. 9, 2002 R. Claus1 Integration and Test Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer.
PACS IBDR 27/28 Feb 2002 PA/QA Status1 PA/QA STATUS MPE /PACS/IGL.
PACS IQR 13 Jan 2005 PACS OBSW1/33 PACS On-board Software & User Manual A. Belbachir (UVIE/TUVIE, SPU) H. Feuchtgruber (MPE, SE) A. Mazy (CSL, DMC) S.
PACS IBDR 27/28 Feb 2002 IIDR Close-out1 Close-out of IIDR Recommendations A. Poglitsch.
Refined ECSS Software Process Model Elements SD-TN-AI-0570, Issue 5 APPENDIX D.
GLAST LAT ProjectEGSE Peer Design Review, August 17, S. WilliamsEGSE Overview Electrical Ground Support Equipment Overview Scott Williams Stanford.
PACS IQR ESTEC, 13 Jan 2005 Documentation1 G. Wildgruber MPE Garching Introduction to Documentation - CQM/AVM EIDP and IQR-
THEMIS peer Instrument CDR 1 CETP, Paris, April 8, 2004 THEMIS Mission Status at Peer UCB Instrument Critical Design Review UCB, April 19/20, 2004 Vassilis.
CRISP & SKA WP19 Status. Overview Staffing SKA Preconstruction phase Tiered Data Delivery Infrastructure Prototype deployment.
# - 1 E. Andrews LAT Software Schedule  Key FSW Milestone Dates –PAST: Jan ‘02 / Jul ‘02 – Preliminary Design Review / Delta PDR May ’03 – Critical Design.
PDS Geosciences Node Page 1 Archiving Mars Mission Data Sets with the Planetary Data System Report to MEPAG Edward A. Guinness Dept. of Earth and Planetary.
Peg Johnson, Owner EVMS-Solutions 1 Peg Johnson
K. Y. LoEVLA Advisory Committee Meeting September 6-7, 2007 Charge to the Committee K. Y. Lo.
Herschel/Planck January 13, 2005PACS IQR - SCI-PT/ ggonzale: Herschel PACS Instrument Qualification Review Review Objectives and Organisation G.Crone/G.Pilbratt.
PACS IIDR ESTEC 01/02 March 2001 OGSE 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher OGSE.
PACS IBDR 27/28 Feb 2002 PACS Data Flow1 PACS Data Flow, Instrument Modes and Operations Helmut Feuchtgruber MPE.
ICCS WSES BOF Discussion. Possible Topics Scientific workflows and Grid infrastructure Utilization of computing resources in scientific workflows; Virtual.
PACS IBDR 27/28 Feb 2002 PACS PI Summary1 Where we are and where to go… A. Poglitsch MPE.
22 March 2007 Science Simulator Overview and Status ICDS Susie Kennison.
PACS IIDR ESTEC 01/02 March 2001 System Engineering 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher System Engineering DDVP, Model.
PACS ICC in Operations SVR-3 MPE, 8/9 Nov 2007 O.H. Bauer.
PACS IQR13 Jan 2005 Warm Electronics Qualification Status1 Martin von Berg PACS IQR.
PACS IIDR 01/02 Mar 2001 PACS Cryo Harness1 U.Grözinger, D.Lemke, R. Hofferbert Max-Planck-Institut für Astronomie Heidelberg Based on input data from.
PACS IBDR 27/28 Feb 2002 OBSW Simulation1 PACS OBSW Simulation/Test A.Mazy (CSL), S.Pezzuto (IFSI), A.N.Belbachir (TUVIE), H. Feuchtgruber (MPE)
Proposal: staged delivery of Scheduler and OpSim V1 (2016) meet most of the SRD requirements – Deliver a system that can be extended with an improved scheduler.
PACS SVR 22/23 June 2006 Test Campaigns1 Overview of PACS Test Campaigns Helmut Feuchtgruber MPE.
PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.
PACS IBDR MPE 27/28 Feb 2002 System Engineering 1 PACS IBDR Model Philosophy / Development Plan Reinhard Katterloher.
PACS IBDR 27/28 Feb 2002 PACS ICC1 ICC (EGSE, IA/QLA, HCSS) Otto H. Bauer MPE Garching.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
ASI Review Padova ICC Contribution 1 WP3000 : Padova ICC Contribution Staff Alberto Franceschini (AF) [Professore Ordinario] Gabriele Mainetti (GM) [Dottorando.
PACS IHDR12/13 Nov 2003 Warm Electronics1 Warm Electronics: Overview, Interfaces, Grounding and EMC Martin von Berg PACS IHDR.
PACS IIDR 01/02 Mar 2001 PACS Grounding Scheme and EMC1 Grounding Scheme and EMC Matthias Rumitz, MPE.
ASI Review Padova ICC Contribution 1 WP3000 : Padova ICC Contribution Staff Alberto Franceschini (AF) [Professore Ordinario] Giulia Rodighiero (GR) [Ricercatore.
PACS ICC Readiness Review MPE, July 3/ Operations Scenario I I) ICC Implementation 1/24 E. Sturm: Operations Scenario I Eckhard Sturm ICC structure,
PACS IHDR 12/13 Nov 2003 Digital Processing Unit1/15 DPU PRESENTATION R.Orfei & S. Pezzuto CNR- IFSI.
PACS IQR Kick-off ESTEC, 13 Jan 2005 PA/QA Status1 O.H. Bauer MPE Garching PA/QA Status.
European Ground Systems – Common Core Overview & MO Integration Stefan Gärtner, DLR SM&C WG CCSDS Spring Meeting Cleveland Chart 1> CCSDS.
INFSOM-RI WP3: WP3: Software configuration tools and methodologies Status Report ETICS All-Hands – 23 May 2007 E. Ronchieri.
The road to the first E2E tests
Instrument Teams to SOC Test Specifications
I&T&C Organization Chart
Configuration Management Why do we need it? What does it do?
Solar Orbiter Instrument Testing by MOC-SOC
Jim Aloise System Programmer
Integration & Test Instrument Operations Coordination
University of Idaho – Interdisciplinary Engineering Capstone Design
Evaluate the integral {image}
Presentation transcript:

PACS IIDR 01/02 Mar 2001 EGSE1 Otto H. Bauer MPE

PACS IIDR 01/02 Mar 2001 EGSE2 Herschel Common Science System for ILT Consists of HCSS v0.1 and EGSE set-up –Based on a staggered development HCSS is a common development of HSCDT and ICC´s –HCSS v0.1 PDR successfully completed (end Feb.) EGSE is a common development of instrument teams –Organized through EGSE Working Group –Work packages defined in Statements of Work –Commitment through Letter of Understanding –Based on re-use and adaptation of available packets (SCOS 2000, Integral MIB Editor, Test Control –Supported by Project (ESTEC, ESOC)

PACS IIDR 01/02 Mar 2001 EGSE3 Distribution of Work Packages CDMS (1553B + Tranfer Layer Protocol)SPIRE Test Equipment Interface (TEI)HIFI TM/TC InterfaceHIFI SCOS 2000all On-board S/W Maintenance FacilityIFSI MIB Editor evaluation (-> Integral)HIFI Test ControlPACS SCOS 2000 On-board S/W ManagementPACS

PACS IIDR 01/02 Mar 2001 EGSE4 Deliveries and Schedule Status DateSupplierCustomerDelivered Item Feb 5ESTECHIFISCOS 2000/Router ICD Feb 15HIFIallRouter prototype Feb 27ESOCallMIB Editor prototype Feb 28ESTECHIFI, PACSSCOS 2000 v2.0 EGSE extension including TOPE oMar 1HIFIallRouter (SCOS 2000 – TEI) oMar 1ESOCallMIB Editor oApr 15PACSallTest Control (IFSI DPU test) oMay 8SPIREallCDMS Simulator oMay 18Everything is at MPEIntegration for IFSI tests oMay 31Shipment to IFSI oJune 30ESTECallSCOS v2.1e (Sol. 8, dif. COTS) oOct 1PACSallOBSM (SCOS 2000) oOct 1HSCDTallHCSS v0.1 (first release) oOct 1Everything is at MPEIntegration (HCSDT + ICC´s)