Ian Crotty HPL (Bakelite) Up-Scope 27 Aug 08 HPL for the Up-Scope of the RE in CMS Contents Specification Contingency Supply Chain Purchasing QA & QC Packing.

Slides:



Advertisements
Similar presentations
WAREHOUSING MANAGEMENT
Advertisements

Global Supply Chain Procurement and Distribution
Calibration Stand Update
Update on the bakelite gluing Feb 2002: first warning from BaBar  13 gaps (over 48) accepted (27%) (i.e. max 2 non contiguous unglued spacers)…the remaining.
Development of high rate RPCs Lei Xia Argonne National Laboratory.
Module 12 – part 2 | Slide 1 of 35 January 2006 Basic Principles of GMP Documentation Part 2 15.
US CMS Silicon Tracker : Schedule J. Incandela University of California Santa Barbara US CMS Silicon Tracker Project Manager Fermilab PMG April 9, 2004.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
UPDATE ON CMS RESISTIVE PLATE CHAMBERS CMS RPC Barrel Collaboration GR1, 5 Aprile 2004.
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
CMS - PAVIA1 Engineering Design Review RPC - BAKELITE.
Atsuhiko Ochi Kobe University / MAMMA collaboration 24/04/2013 RD51 mini week, WG6.
Case Studies in Change Management IFF February 2009.
SAMPLING PROCEDURES.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia SCT week, Valencia, June 2002 Pre-series Low Mass Tapes 12 different lengths were produced for barrel.
 Read out strips production : We will provide 200 strips (100 RE4/2 and 100 RE4/3) Contract with Beijing Gaonengkedi Co. signed on 10-Aug., 3 RE4/2 and.
RPC Endcap Maintenance and RE4 Upscope Anton Dimitrov on behalf of RPC TC CMS Week Dec 2012 CERN, Geneva.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Barrel Endcap The RPC System Baseline Six stations in the Barrel Four station in the Endcap up to  = 2.1 Baseline Six stations in the Barrel Four station.
RPC Development in Beijing and Potential for NO A Tianchi Zhao University of Washington May 16, 2005.
Production of Forward RPC Gaps CMS Forward RPC EDR (10/10/2002 – 11/10/2002) Seong Jong Hong KODEL, Korea University.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
Bakelite surface vs Gap production Evaluation of First samples sent back from Korea Tests and QC of panels presently in GT Evaluation of second set of.
RPC Upscope : An overview with Indian perspective L. M. Pant Nuclear Physics Division Bhabha Atomic Research Centre L. M. Pant India-CMS Meeting, BARC.
Compressor status AWAKE Technical Board meeting 19 August 2015.
The RPC Closed loop Gas System Slides from Bianco and Guida.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
Gap Production for Upscope of the Endcap RPCs Sung Keun Park Korea Detector Laboratory Korea University February 5, 2010 Workshop on the Forward CMS RPC.
W.Van Doninck Re-scope TDR August 2008 The forward RPC system (TDR) China Korea Pakistan Gap production Korea Gap production Korea Front-end electronics.
Only Three stations up to  = 1.6 RE i/3 REi/2 REi/1 RPC RE restoration.
CMS Experiment at the LHC, CERN Date Recorded: :21 CET Run/Event: / Candidate Collision Event Report from Belgium Michael Tytgat.
14-Dec-15S.Movchan Straw manufacturing and QC1 Straw manufacturing procedure and QC tape and straw parameters specification conditions of straw production:
Hybrid panel heated plate study Currently the curing of the ASIC glue for the hybrid panels are done at room temperature. This is a study to determine.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
CMS Upgrade Workshop, FNAL, Nov 19-21, O.Prokofiev CMS Upgrade Workshop Updated ME4/2 chamber construction costs and prototype Status and plans.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
RPC M & O-B status Pigi Paolucci. Introduction 2008: RPC project budded from the barrel and forward 2009: M&OB token of 5 KCHF (but INFN 163 KCHF) The.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Ian Crotty HPL (Bakelite) Low Eta TDR Up-Scope 05 Feb 10 HPL for the Up-Scope of the CMS RE Low Eta as per the 1997 TDR in CMS Contents Specification Contingency.
RPC Barrel EDR Chapter 3 3. Production and control of Bakelite 3.1 Definition and standards Standard bakelite electrodes are composed by a bulk made of.
S. Colafranceschi - Ischia CMS RPC Italia1 CMS RPC studies at ISR Stefano Colafranceschi Laboratori Nazionali Frascati Università di Roma – La Sapienza.
Cables Ian Crotty 8 May 2012 Cables for the RE4 Upscope in CMS News. The HV cables are in the Integration DB (INB/904) The Hv order is confirmed. Need.
Chamber mechanics Chamber mechanics Production in China Peking University Group – 20 Aug
RPC Production status for Engineering Module & Detector stack at IICHEP, Madurai Shri. S.D.Kalmani TIFR.
New Bakelite production or Phase 2 Salvatore Buontempo (INFN, Naples & CERN) on behalf of CMS Central TC Group Atlas & CMS meeting RPC Phase 2, November.
Updated Resistivity measurement on Mm-Batch-4 Bakelite & RPC Bakelite sample measurements Liang Guan TGRPC R&D Biweekly meeting
QC Procedures of Gaps for RE4 RPCs in Upscope K. S. Lee, S.
The Phase-1 Extension of the CMS Endcap RPC System Michael Tytgat on behalf of the CMS Collaboration Outline :  Introduction  RPC Upgrade  Simulation.
GT expedition to check on PU contamination as reported by KODEL Paolo Vitulo Ian Crotty 23/4 February 2012.
Planning for Proto-DUNE PD Installation and Cabling at CERN
IBBelle: Status & Plans
University of Wisconsin
Quality assurance for Manufacturing Dressed Cavities for SPS prototype cryomodule C. Parente (HL-LHC Technical Quality Officer) Date:
SBN Far Detector Installation & Integration
Production ad Quality control of RPCs for the CMS muon barrel system
Generic Site Preparation
Gas for World wide RPCs Ian Crotty 12 Feb 2015.
Pricing your Products to be Profitable
Pierre-Alexandre Thonet
Typical Receiving Procedures
HPL DG d=1.4mm/e= mm.
Coordinate system for the GIF as defined for CMS RPCs
Unit 31- LA B Production Planning for Engineering
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
Undulator Tuning Status Heinz-Dieter Nuhn, SLAC / LCLS for Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko, Scott Jansson, Ralph Colon, Dave.
Supplier Briefing Pack
Bunker Project Schedule/Budget
Presentation transcript:

Ian Crotty HPL (Bakelite) Up-Scope 27 Aug 08 HPL for the Up-Scope of the RE in CMS Contents Specification Contingency Supply Chain Purchasing QA & QC Packing & Transporting Production Rate Scheduling Conclusion

Ian Crotty HPL (Bakelite) Up-Scope 27 Aug 08 CMS End-cap RPC Bakelite High Pressure Laminate (HPL) Specification was taken from previous RPCs production 1-6 x10^10 20°C. Average roughness (Ra) = <0.2 micrometre, 2 mm thick Melamine surface paper with Phenolic Bulk Sheet dimensions according to cutting plan Temperature coefficient w.r.t resistivity is given by the raw material and obtained for normalisation during QC It would be good to go back and check that we are still getting this value for the roughness

Ian Crotty HPL (Bakelite) Up-Scope 27 Aug 08 Contingency from past experience The contingency was decided upon after the calculation of the nominal number of sheets. The nominal sheet quantity is given by the cutting plan. Chamber spares was decided upon at 10% The initial order to cover low eta RE1, 2 & 3 for the EndCap included 43% HPL. A rejection rate of 30% at gap production and final chamber QC test in the ISR was assumed. In total a 50% contingency on HPL production was decided. We consider this to be sufficient for the up-scope.

Ian Crotty HPL (Bakelite) Up-Scope 27 Aug 08 HPL Supply Chain Frati Laminat Milano Production and QA & QC Riva (Milano) Cutting to form GT (Roma) Surface treatment with MEK Korean Gap Assembly Shipping by Air and/or Maritime Order from CERN To PanPla Pakistani Chamber Assembly Belgium Chamber Assembly Indian Chamber Assembly

Ian Crotty HPL (Bakelite) Up-Scope 27 Aug 08 PurchasingPurchasing First step is the budget. If CERN managed then tax free As the amount is > 100kchf then a divisional request is needed. No call for tender and time for suppliers to reply. Justification for “single source” order. All this takes some time, we should move ahead asap

Ian Crotty HPL (Bakelite) Up-Scope 27 Aug 08 Resistivity QC in Pan Pla This device is now used to do the pre-selection in PanPla before shipping to Pavia Also used to Calibrate the Resistivity table

Ian Crotty HPL (Bakelite) Up-Scope 27 Aug 08 Pan Pla HPL Production and QC Dedicated Resistivity measurement rig Bar code and visual inspection of raw material. Finished productsorted according to resistivity. This operation is run by colleagues from Pavia with a representative from RE.

Ian Crotty HPL (Bakelite) Up-Scope 27 Aug 08 The Phenix QC experience July 08 Colleagues from the US have successfully used the Resistivity table that is now installed in the Pavia University facilities. Pneumatically actuated conductive Rubber pads Logistic to be improved

Ian Crotty HPL (Bakelite) Up-Scope 27 Aug 08 Table reinstalltion and upkeep There is some maintenance work to be done such as temperature gauge and perhaps the elastomeric electrodes which have increased in resistivity over the 8 years of operation. Now that we no longer have access to the dedicated forklift the logistics of moving around loaded palettes is far more difficult and occupies more space. The operating team requires 5 people that will have to come from the collaboration as Pavia will not be able to man the test sessions as previously done.

Ian Crotty HPL (Bakelite) Up-Scope 27 Aug 08 A production run from 2003 This a good run as few sheets are out side the window of 2- 6 values Rejection rates can vary from 5 to 95% !

Ian Crotty HPL (Bakelite) Up-Scope 27 Aug 08 Yield for Phenix There are now two levels of selection each of which will expect a certain loss. In the case of Phenix during July Factory tests Produced410 Selected317Yield = 77% 2Pavia University Jig Received 317 Selected262Yield =83% Overall Yield= 64% Phoenix and CMS use the same panel size 1.6 x 3.2m

Ian Crotty HPL (Bakelite) Up-Scope 27 Aug 08 Production Rate A production rate of panels per day can be expected when full scale production is underway. New RE2 requires about 1000 sheets which equates to 40 working days or 3 months Within one month of the contract being received they can start our requests. The same contractual conditions should apply in terms of accepting only good panels at the second stage, the remainder returning to the factory.

Ian Crotty HPL (Bakelite) Up-Scope 27 Aug 08 Riva Milano Cutting to Form CNC tooling Cycle time 5mins/sheet HPL QC on dimensions. Tolerance +0mm and -0.5mm Checking cutting head and stability of panel retention

Ian Crotty HPL (Bakelite) Up-Scope 27 Aug 08 TransportingTransporting In this international collaboration there is a large overhead in the supply chain. Regulations for “triangular traffic” to retain the tax free status Phytosanitary regulation in most countries for the packing materials. High costs due to large distances. Packing Design

Ian Crotty HPL (Bakelite) Up-Scope 27 Aug 08 PackingPacking Fork lift damage A simplified version The Load is not attached to the base and has slipped Looks fine but is heavy and expensive

Ian Crotty HPL (Bakelite) Up-Scope 27 Aug 08 Production or Throughput Rates The production rate capability of PanPla is large. However the HPL has to stabilised in the Air-conditioned hall for QC were its humidity and temperature can be controlled to some degree. This limits the quantity per production batch to some 300 sheets, weighing in at approx 2.5 tonnes, it takes a few days to stabilise. This quantity was sufficient on occasions, if the yield was ~70%, for the 200 sheets required to build half a full station. Riva will take 2-5 days to cut this material and repack but will not want to work continuously as the main machine is occupied as is the floor space and personnel. This results in 2 boxes of some 600kg to ship to Korea where space is also limited.

Ian Crotty HPL (Bakelite) Up-Scope 27 Aug 08 Installations possible in September 09 and February 10 First HPL to Kodel in Early December 08 Four Gap production periods REplus 2 RE minus 2

Ian Crotty HPL (Bakelite) Up-Scope 27 Aug 08 ConclusionsConclusions Heavy shipping around the world, firstly within Italy then to Korea, India, Belgium and Pakistan and back to CERN The initial outlay is high for the HPL contract High transport costs especially by air freight Different QC stages require people and time We managed for the past and we can do it again but committed people are needed