Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.

Slides:



Advertisements
Similar presentations
July 2003 Structure of Electricity Distribution Charges Update and Proposals Martin Crouch Director, Distribution.
Advertisements

Transmission Charging Developments DCMF3 rd June 2010
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Charging Methodology Development Oliver Day © Copyright EDF Energy plc. All rights reserved. HV/LV Generation Charging April 2008 Oliver Day Distribution.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
CE Electric UK – Potential developments in long-term charging arrangements and IDNO charging methodologies 1 April 9, 2008 Potential developments in long-term.
Grid Issues Charles Davies Commercial Director, National Grid Company British Wind Energy Association April 2002.
A DNO Perspective by Stephen Parker for Structure of Charges Workshop 15 July 2003.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
2015/16 changes to the winter time-of-use peak periods and tariff charge name changes.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Structure of Distribution Charges A User’s perspective David Tolley Innogy & Npower.
July 2003 Structure of Electricity Distribution Charges Welcome and Introduction Charles Gallacher Deputy Director, Scotland.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
KEY CONSULTATIONS an overview Louise Masters InnogyOne, Innogy UK Offshore Wind 2003.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Why does OTEG need a charging subgroup? OTEG Open Meeting 3 July 2006.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Defining Competitiveness
Incentive Based Regulation for SO Costs Andrew Mcintosh European Policy Manager Florence School of Regulation Workshop Improving and Extending Incentive-based.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
McGraw-Hill/Irwin © 2005 The McGraw-Hill Companies, Inc. All rights reserved. 7-1 Defining Competitiveness Chapter 7.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
EHV generation charging methodology change Harvey Jones.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
1 EHV DG Charging Nigel Turvey. 2 Background Our current EHV charging methodology was not vetoed on 18 th February 2010 with the following treatment of.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
ARODG - 2 An overview of transmission access arrangements Mark Copley & Colin Sausman 1 st and 2 nd February 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Force Majeure - Capacity Transmission Workstream 2 July 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Comments on Guidelines on Transmission Tariffs General ETSO welcomes the new draft as positive step –There are many important improvements to the previous.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Optimisation ARODG Seminars Glasgow & London February 2007.
DNPC08 Review of Standard LDZ System Charges Consultation Responses 25 October 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Transmission arrangements for distributed generation DCMF 9 April 2008 Pre consultation document.
Energy Market Issues for Biomethane Projects Workshop - 31 October 2011 RIIO-GD1 Environmental Incentives.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Local asset charging arrangements DCMF April 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Risk assessment CAP131 Working Group (4) 17 November 2006 Slides updated to reflect: Movement of X=12 to X=12.8 to X=11 closure probability value of overall.
Cost reflectivity of investment proxies
CMP277 ‘Special License Condition 4J’ CMP278 ‘BSIS 2017 Housekeeping’
Transmission Planning Code
Holistic view of Charging Modifications – In flight 11th June 2018
CAP089/090/091 Working Group Report
Gas Security of Supply SCR Proposals: Credit Implications for the GB Gas Market Introducing a new Transmission Workgroup Topic 4 October 2012.
Open Letter - Summary of Responses
Commercial Arrangements For Gas Quality Service – Introduction
Presentation transcript:

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Update on Review of Embedded Generation Benefits Andy Wainwright

2 Background  Standard Licence Condition C13  Introduced at BETTA (2005)  Addressed different treatment of 132kV connected small generation in Scotland (transmission) with that in England and Wales (embedded)  Time limited: due to expire 1 st April 2016  Embedded review needs to consider overall implications on GB generation  Informal industry focus group established Spring 2013

3 Objectives of transmission charges  Cost reflectivity  Facilitate competition  Developments in transmission businesses  Recover transmission costs  Non-discrimination Affected transmission ‘charges’ TNUoS BSUoS Losses Focus Group agreement to consider TNUoS first

4 TNUoS Charges - Locational Element TNUoS Locational Elements only Charging Zones Tariffs  Net approach  Embedded generation nets with demand  Therefore subject to a negative demand locational signal  Based on output at Triad  Equivalent to generation signal: zoning limitations  Gross approach  Embedded generation receives same generation signal as transmission connected  All demand receives locational signal

5 The effect of the generation residual element ABCDE Gen Dmd Avoidance of generation residual charge  Embedded generator avoids paying generation residual element

6 The effect of the demand residual element ABCDE Gen Dmd Netting of positive demand  Positive demand can avoid paying the demand residual element if able to net with embedded generation  Embedded generation therefore has a value equal to the demand residual element

7 Combination of both residual elements  In summary, embedded generation can receive TNUoS ‘benefit’ through two effects on residual elements;  netting of positive demand (i.e. reducing demand charge)  avoidance of generation residual charge Avoidance of generation residual charge Netting of positive demand 2 x Residual uplift

8 YearCostResidual 2012/13£1.41/kW£27.07/kW 2009/10£1.30/kW (equates to £1.47/kW in 2012/13) 1 £20.74/kW (equates to £23.53/kW in 2012/13) 1 1 RPI factor for 2009/10 to 2012/13 = How much benefit should be paid for offsetting +ve demand? NGET GSP infrastructure reinforcement costs

9 Average TNUoS charge: £7.57/kW (2013/14) Transmission Function (Use)Transmission connected G Embedded G Net transfers inject Net Access to Market (s) GB & wider EU Security / Quality of Supply Should embedded generation pay for transmission? How does embedded generation use transmission? Comparing transmission and distribution charges Note 2013/14 average TNUoS charge: £7.75/kW

10 Other areas under consideration Impact on >100MW generatorsExporting GSPsOffshore Transmission Implications

11 Next steps  National Grid report to be published October  Include Focus group & bi-lateral discussions  Three week open letter  Formal CUSC modification proposal potentially later in Autumn