PDCWG Report to ROS Sydney Niemeyer Chair NRG Energy Don Blackburn Vice Chair Luminant Energy.

Slides:



Advertisements
Similar presentations
BAL-001-TRE-1 Primary Frequency Response Update for Texas RE RSC
Advertisements

IMPACT TO FREQUENCY CONTROL DURING STARTUP AND SHUT DOWN OF UNITS
January 9, 2013 BAL-001-TRE-1 Primary Frequency Response Update for Texas RE RSC.
Don Blackburn Vice Chair
FREQUENCY CONTROL DURING BLACK START OPERATIONS
NERC LTRA Update / CDR Capacity Counting Issues
Ancillary Services Methodology Changes for 2015 Sandip Sharma Bill Blevins Dan Woodfin.
Governor Response Sequence Bob Green Garland Power and Light ERCOT Future AS Workshop January 20, 2014.
Frequency Control Turbine Governor Droop NERC Requirement
Sixth Northwest Conservation & Electric Power Plan Adding Incremental Flexibility to the Pacific Northwest Power System? Maury Galbraith Northwest Power.
PDCWG Report to ROS August 12, 2010 Sydney Niemeyer.
Frequency Response Initiative Robert W. Cummings Director of System Analysis and Reliability Initiatives NERC Standing Committees September 14-15, 2010.
1 Ancillary Services Requirements for Future Ancillary Services Cost Benefit Analysis FAS/SIRS Meeting September 21, 2015.
BAL-001-TRE-1 Primary Frequency Response in the ERCOT Region
Comparison of Governor Deadband & Droop Settings of a Single 600 MW Unit A Hz Deadband with a Straight Line Proportional 5% Droop Curve Compared.
July 2008 CPS2 Waiver SDT Technical Workshop for Draft BAL-001-TRE-01 Judith A. James Reliability Standards Manager TRE.
Wholesale Market Subcommittee April 12, 2012 ERCOT Dynamic Ratings Application.
February 26, 2013 Board of Directors Meeting 2012 ERCOT Region Reliability Update.
Frequency Response Standard. ERCOT Governor Droop.
Lead from the front Texas Nodal 1 Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 - Handbook EDS 3 Release 6 MP Planning.
1Texas Nodal Market Trials Update. 2Texas Nodal Full System Market and Reliability Test 24-Hour Test Observations Duration of Test for Week of 8/ Hour.
1 Compliance Update May Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
NPRR XXX: PRR 307 Inclusion in Nodal…Part II. Questions Raised 06/26/06 Section 3 –COP (resource parameters) –CLR participation limits –Telemetry Requirements.
Date 05/01/2012 MIT Manual TEC Analysis Sandip Sharma ERCOT.
Nodal ATF 1 Nodal Advisory Task Force Update for TAC November 4 th, 2010.
Analysis of ERCOT Regulation Service Deployments during 2011 David Maggio Market Enhancement Task Force Meeting 3/29/
Managing Reliability and the Markets with PI
Resource Adequacy Task Force (RATF) Update to WMS June 12, 2013.
1 PDCWG Report to ROS October 13, 2011 Sydney Niemeyer.
Operational Issues & Risks ERCOT Operations Planning August 22, 2008.
PDCWG Report to ROS January 14, 2010 Sydney Niemeyer.
Outstanding Issues & Action Items 1.Obligations to Honor Ancillary Services Commitments 2.Variable ERCOT Bias 3.Sign reversals of the Regulation Signal.
PDCWG Report to ROS David Kee Chair CPS Energy Sydney Niemeyer Vice Chair NRG Energy.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) August 8, 2012 PDCWG August 9, 2012 ETWG/QMWG.
Operations Report Kent Saathoff System Operations ERCOT.
1 Presentation MIT November 14, 2011 Metering Issues Taskforce (MIT) Elimination of Time Error Correction Potential Impact on Wholesale Settlements.
QMWG Report to WMS S. Looney April 9, NPRRs Assigned to QMWG NPRR595, RRS Load Treatment in ORDC – Provides ORDC payment for non-controllable Load.
Resource Parameters Needed for LFC NATF WebEx Meeting 05/11/2010 Dave Maggio Operations Engineer, Supply Integration and Grid Applications.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
Grid Reliability Metrics by Jim Dyer Electric Power Group, LLC January 29, 2004 Washington, DC Transmission Reliability Research Review.
PDCWG 8/25/2015 GTBD Bias Analysis ERCOT Market Analysis and Design PDCWG August 25, 2015.
BAL-001-TRE-01 ERCOT CPS2 R2 Waiver Regional Variance April 16, 2009 Sydney Niemeyer.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Load Frequency Control (LFC) Business Requirements Energy.
QMWG Update to WMS S. Looney October 9, WMS Assignments NPRR564, Thirty-Minute Emergency Response Service – Discuss concerns expressed at last WMS.
Final Report on ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) PDCWG March 26th, 2014.
PDCWG Report to ROS March 11, 2010 Sydney Niemeyer.
Improving Primary Frequency Response Bob Green PDCWG August 3, 2011.
1 WMS Report TO TAC April In Brief Two Working Group reports Two Working Group reports Two Task Force Reports Two Task Force Reports BENA presentation.
QSE Managers Working Group Report to WMS, April 8, 2011 S. Looney, Luminant.
QSE Managers Working Group November 7 th 2011 NPRR 334 – Additional Analysis.
Future Ancillary Services Team (FAST) Update April 24, 2014 TAC Meeting 1.
Responsive Reserve Service Deliverability Review September 15,
Frequency Control Task Force Presentation to the ERCOT Technical Advisory Committee June 1, 2006.
PDCWG Report to ROS January 13, 2011 Sydney Niemeyer.
Synchronous Inertial Response
ERCOT DYNAMICS WORKING GROUP Report to ROS August 16, 2007 Vance Beauregard, American Electric Power.
ROS Report Bill Hatfield 2014 ROS Chair Technical Advisory Committee (TAC) Meeting ERCOT Public June 26, 2014 TAC Meeting.
A Broad Review of August 13, 2015 and Similar Historical Situations Luminant Energy January 22, 2016.
Resource Adequacy Task Force (RATF) Update to WMS October 8, 2013.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
Preliminary Report on ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) June 12th, 2013.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) June 13, 2012 WMS and June 14, 2012 ROS.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) PDCWG April 26, 2013.
1 EEA Workshop 3 April 2, /3/2015For the purpose of discussion only.
PDCWG Report to ROS October 16, 2008 Bob Green PDCWG Chair Garland Power & Light.
Current FRRS Language & Explanation of Posted Data
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS)
PDCWG David Kee, Chair Sydney Niemeyer, Vice Chair
David Kee Chair CPS Energy Sydney Niemeyer Vice Chair NRG Energy
Compliance Report to ERCOT TAC February 2007
Presentation transcript:

PDCWG Report to ROS Sydney Niemeyer Chair NRG Energy Don Blackburn Vice Chair Luminant Energy

May 28 Meeting Manual Deployment and Recall of Responsive Reserve Service during Scarcity Conditions. – Discussion Items: Loss of available Primary Frequency Response. Concern with ERCOT’s ability to estimate available Primary Frequency Response. Resource Real-time HSL accuracy. ERCOT logic change needed for manual Recall to avoid auto recall based on frequency returning to Hz. ERCOT researched and found only 3 times the manual deployment would have been executed since April 2012.

Loss of Primary Frequency Response As RRS is manually deployed and SCED utilizes the capacity, Primary Frequency Response and the depth of that response will be depleted. – Higher risk of not meeting BAL – Loss of Load risk increases significantly. – Fewer Resources will be maintaining frequency stability increasing Resource output movement and resulting loss of controllability. – If RRS capacity is not manually deployed, frequency will decay and the energy will be delivered through Primary Frequency Response anyway.

Estimating Available Primary Frequency Response in Real Time The available Primary Frequency Response can change quickly depending on loading of Resources. Accurate HSL’s and identification of how much spinning reserve is actually frequency responsive is greatest concern in estimation. Deploys RRS before Regulation Up Service since REGUP is deployed based on grid frequency.

Resource HSL Accuracy Augmented capacity on Resources that is contained within the HSL is typically not frequency responsive. Telemetry of this information is not available at this time. Ambient temperature and humidity impacts HSLs. Most Resources do not update HSL in Real Time based on current conditions. – While reviewing Disturbance Reports, it is apparent that there is greater than a 2% error in their HSL on many Resources. – ERCOT discounts HSLs in the PRC calculation by: Decrease HSL by 1% if ambient temp </= 95 degrees F. Decrease HSL by 2% if ambient temp > 95 degrees F.

RRS Recall Logic Presently RRS is automatically recalled when frequency recovers to Hz following a deployment at Hz. ERCOT will have a logic change implemented prior to July 1 for the manual deployment of RRS. This will allow RRS to remain deployed independent of grid frequency when deployed manually.

Frequency of Manual Deployment of RRS ERCOT researched historical PRC data. – Since April 2012 there would have been 3 manual deployments of RRS based on the criteria in this procedure.

Other Meeting Subject Discussions Resource GREDP review for the month of May through the 26 th. – Status quo on number of Resources struggling to meet the metric. – Significantly poor performers have been contacted by ERCOT. Escalation to TRE may be necessary on a few. BAL-001-TRE-1 implementation timeline was reviewed. ERCOT project internally to start in late June to meet BA requirements. – TRE expressed concern that FAST is suggesting an increase if governor dead-bands on some Resources and the resulting decrease in Primary Frequency Response from these Resources.

Other Meeting Subject Discussions TRE Update: – NERC Standard activity PRC-005 adding “sudden pressure relay” to the list of covered protective relays. PRC-002 Disturbance Monitoring adding phasor monitoring to Resources for model verification. Bulk Electric System definition webinar June 5 th. NERC State of Reliability Report identified significant improvement in 2013 in Primary Frequency Response performance in ERCOT. Significant drop in poor performing Resources in ERCOT Disturbance Analysis reports during ERCOT LFC Tuning Changes implemented. – May 27 at 09:30 ERCOT made LFC tuning changes. – Immediate improvement in CPS1 of 8 to 10 points observed since the change. CPS2 improvement as well as Time Control is better.

ERCOT Disturbance Reports Reviewed May 1, 2014 Frequency Event. – 15 Resources had issues with Primary Frequency Response. 8 of these Resources may have augmented spinning reserve and therefore not frequency responsive. 3 Resources had possible HSL errors. May 13, 2014 High Frequency Event- DC tie trip. – Present evaluation tool does not accurately measure response to High frequency deviations. – Wind Generators as a fleet performed well. May 15, 2014 Frequency Event – 4 Resources had issues with Primary Frequency Response. One Resource had early PFR withdrawal. Three Resources had low PFR delivery with one of these believed to have augmented spinning reserve capacity. One Resource did not follow SCED deployments during the frequency recovery period.

ERCOT Frequency Control Report May 2014 Sydney Niemeyer NRG Energy June 3, 2014

Notes Time error values from NRG True Time device can be slightly different from ERCOT’s Time Error but the daily delta times should be accurate. CPS 1 and CPS 2 data for May is from NRG Frequency True Time device and will be slightly different from ERCOT’s measure. The monthly CPS1 score is typically within +/-0.05.

ERCOT FREQUENCY CONTROL BAL-001 CPS 1 & 2 Performance, RMS 1 and Frequency Profile

ERCOT LFC Tuning 09:30

CPS1 12 Month Rolling Average =

<= HZ <

ERCOT TIME ERROR AND TIME CORRECTION Time Error History

Time Error Corrections Eleven slow Time Error Corrections were executed in May. Other than the days with the TECs, no days had positive time error.

Time Correction History

ERCOT PRIMARY FREQUENCY RESPONSE PERFORMANCE BAL Interconnection Frequency Response and Bias Measure.

ERCOT Primary Frequency Response – BAL Bias and Frequency Response Measure

ERCOT TOTAL ENERGY AND WIND PRODUCTION October Total ERCOT Energy and Total Energy Production from Wind Resources.