Concrete Weight Coating Plant “Aladja”

Slides:



Advertisements
Similar presentations
COMPANY MAINTENANCE MANUAL
Advertisements

Initiating Devices Manual Fire Alarm Boxes Ionization Smoke Detectors
SHOTCRETING K.V.SUBBA RAO.
Calibration Stand Update
International Conference on Management of Spent Fuel from Nuclear Power Reactors, Vienna, 31 May - 4 June 2010 Anibal Barrera Life Extension Project Embalse.
Protection Of Reinforcement Steel From Corrosion Prepared By: Mohamed A. El-Reedy, Ph. D. © Dr. Mohamed A. El-Reedy.
SPECIFIC GRAVITY & ABSORPTION CAPACITY OF AGGREGATES
Chapter 3. Obtaining Silica-Fume Concrete  Specifying Silica Fume and SFC  Proportioning SFC  Producing SFC.
World Health Organization
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Learning Objectives Relevance of fresh concrete properties
CONCRETE OPERATION BY DHARAM SINGH H.O.D. GOVT POLY TECHNIC COLLEGE G.T.B GARH ( MOGA)
Regional Sales Manager
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
Quality Control Testing
2002 FDOT/FTBA Construction Conference
WILLBROS A Good Job On Time Hydrostatic Testing Practices Establishing Verifiable, Traceable, and Accurate Documentation August 20, 2013 Hal Ozanne Willbros.
Warm Mix Asphalt System 9/15/08. Warm Mix Asphalt System Features: –Reduces mix temperatures by up to 90º F without costly additives –Uses Terex patented,
Concrete Mix Design Technician School
University of Palestine Industrial Engineering Department Materials And Construction Technology Chapter (2) Blocks And Stone works.
READYMIX INDUSTRY There are two main components in asphalt concrete: 1) the asphalt cement, or glue, and 2) the aggregates.
Placing Quality Concrete
4.1.5 Student Book © 2004 Propane Education & Research CouncilPage Determining the Proper Corrosion Protection Systems for Underground ASME Tanks.
5.1.7 Student Book © 2005 Propane Education & Research CouncilPage 1 Dispensers used to service portable cylinders require suitable scales for filling.
Chapter 12 Concrete Construction Part 3 1CE 417, King Saud University.
Aggregates for Concrete
Technical requirementsTechnical requirements –Resistance to corrosion –Frost-resistance –Thickness protective layer of marine reinforced concrete –The.
AFTHAP m Luis A. Agudo Fernández AFTHAP CONFERENCE REINFORCED AND PRESTRESSED CONCRETE PIPE, STEEL CYLINDER TYPE Module 4: Significant.
ISO / IEC : 2012 Conformity assessment – Requirements for the operation of various types of bodies performing inspection.
Sampling and Testing Concrete Mixes MATERIAL TESTING LABORATORY
Standards, Training, and Certification in the Wastewater Industry Presented by: Bob Murphy, Sherwin Williams.
JSC CTC Metallokonstruktsiya Corrugated structures.
Control Tests for Concrete Ch. 16. Project Specifications Characteristics of the mixture Maximum size aggregate Minimum cement content Characteristics.
WELCOM TO EGIQC. EGIQC Engineering Group For Inspection & Quality Control.
1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.
Module 12 - part 2Slide 1 of 23 WHO - EDM Basic Principles of GMP Documentation Part 2 Part One, 14.
Necessary Information Required compressive strength at 28days: 30 Mpa Type of structure: mass concrete, beam, column. Maximum size of aggregate: 20 mm.
Patented Technology – Quality Results Ulti-Pave 3 Pavement Repair Mix 30-Minute Workability 3,000 PSI 3-Hour Set ® “A One Component, Rapid Hardening Cementitious.
Soil cement   1 1.
GEOTEXTILES IN TRANSPORTATION APPLICATIONS
Hussam Khalid Al Mubarak Abdullah Nasser Al Motairi Omar Al Shalhoub
Project Materials Usage and Concerns. Project Materials and Acceptance QC/QA Specifications QC/QA Specifications Quality Control Plans Quality Control.
DESTRUCTIVE TEST METHODS OF HARDENED CONCRETE
“ TOWARDS A GREEN REVOLUTION IN BUILDING CONSTRUCTION ”
5. FERROCEMENT.
A Visual about the visit….
Marshall & Superpave Mix Design
SUBMITTED BY A.SHRIPATHY III-CIVIL ENGINEERING TAMILNADU COLLEGE OF ENGINEERING.
Quantity Calculations Module 3. Quantity Calculations  Specifications  Post Bid Quantity Calculations  Production Quantity Calculations –Checking Yield.
Innovative Testing & Engineering Solutions for the Industry
CONCRETE TECHNOLOGY.
GOOD MANUFACTURING PRACTICE FOR BIOPROCESS ENGINEERING (ERT 425)
Materials Selection and Coatings
CHAPTER 2 Pipeline Coatings.
Making a Large DI Casting with Foam
Experience in Conformity Assessment of Products and Services  for Russian NPPs and Overseas Nuclear Power Plant New Builds Yury Meltsov Aug
Special Provision 188 of IMDG Code 38-16
ACPA QCAST PLANT CERTIFICATION
UTILITY VAULTS: THE PRECAST ADVANTAGE
AGGREGATE.
Piping.
Raw Materials For Precast Concete Pipe and Box Culverts
Quality Control Personnel Training
QC Personnel Responsibilities
Precast Concrete Pipe and Box Culvert Equipment Calibration
Supplier Briefing Pack
Nagarjuna college of engineering and technology
Maximum Size of Aggregate
CATHODIC PROTECTION OF REINFORCED CONCRETE STRUCTURES
Fiber Reinforced Polymer Systems
Presentation transcript:

Concrete Weight Coating Plant “Aladja” PetroGas FZE

Applying Of Concrete Coating Using Gunnite Method By Means Of CRC Machine

- Range of Pipes Diameters for Applying Concrete Coating TECHNICAL CAPABILITIES OF THE PLANT - Range of Pipes Diameters for Applying Concrete Coating 10” – 40” - Concrete Coating Reinforcement Galvanized Wire Mesh from 1 to 4 Layers - Thickness of Concrete Cover Up to 210 mm - Obtainable Concrete Density For Concrete Weight Coating Up to 3100 kg/m³ - CWC Plant Capacity 0,47 m³/min - Batching Plant Capacity 0,6 m³/min

Technical Base of the Company “PetroGas FZE” Provides Steady Supply of Materials

“Aladja” Weight Coating Plant Material and Technical Base Allows Any Complexity Operations Execution

Ability to Perform Operations 24/7

Particularly Developed Winter Period Procedure Allows High Quality Concrete Production In Temperatures Lower Than +5 °С Degrees. Plant Fully Operational 12 Month Per Year

Storage Yard Area – 900 000 m²

CWC Plant Is Located In 700 meters Away From “Aladja” Port, Which Decreases The Time and Cost in Pipes & Materials Transferring

Quality Control Is Performed At All Stages Of Production And Guaranteed By TPI.

Laboratory And All Certified Tools Required For Destructive Testing (DT) And Non-Destructive Testing (NDT) Controls Are Available On Site

Concrete Coating Application Operations Are Performed in Accordance With Approved Procedures Developed On The Basis Of The Following Standards: - DNW-OS-F101 Offshore standard; - ASTM C33 Standard Specification for Concrete Aggregates; - ASTM C94 Standard Specification for Ready-Mixed Concrete; - ASTM A82 Standard Specification for Steel Wire, Plain, for Concrete Reinforcement; - ASTM C642 Standard Test Method for Specific Gravity, Absorption and Voids in Hardened Concrete; - ASTM A810 Standard Specification for Zinc-Coated (Galvanized) Steel Pipe Winding Mesh; - API-RP 5LW Recommended Practice for Transportation of Line Pipe on Barges or Marine Vessels; - API RP 5L1 Recommended Practice for Transportation of Line Pipe; - BS 1881-108 Method for Making Test Cubes from Fresh |Concrete; - BS 1881-114 Method for Determination of Density of Hardened Concrete Cubes; - BS 1881-120 Method for Determination of Density of Hardened Concrete Cores; - NACE RP 02-74-1974 High Voltage Electrical Inspection of Pipeline Coating to Installation.

Technological Process of Concrete Coating Applying

Feeding Pipe To The Racks For Anti-Corrosion Coating Control & Repair If Any

2. Installation Of Pipes On Transfer Cart And Application Of Concrete Coating

3. Pipes Weighing & Simultaneous Negative Buoyancy Calculation

4. Transportation To Storage Area

5. Damaged Concrete Coating Repair By Means Of Manual Gunnite Machine

6. Installation Of Anode Protection

THREE LEVEL QUALITY ASSURANCE

1 Pipe and Raw Materials Receipt - Receipt & Inspection of Raw Materials a) Condition, Packing & Markings b) Testing of Concrete Materials - Cement – Portland Cement a) Test Certificate b) Batch & Date of Manufacture c) Physical Condition of Cement, i.e. Lumps & Contamination - Iron Ore Delivery & Testing a) Test Certificate b) Packing List & Country of Origin c) Check for %moisture content - Water a) Certificates Issued by Local Water Authority & Tested 3rd Party b) Cleanliness - Wire Reinforcement a) Test Certificates b) Conditions of Rolls c) Dimensional checks d) Markings e) Packaging & Storing - 3-LPE Coated Pipe Stacking (Temporary Storage) a) Stacking of 3-LPE Coated Pipe b) Check if Number of Tiers is Per the Approved Calculation c) Check That separators are Intact & no Pipe Surfaces are Adhering to Each Other

2 CWC Coating Qualification (PQT) - Concrete Mix Design - Concrete Weight Design - 3-LPE Coated Pipe Reception - Temperature (Ambient, Water, Sand, Iron Ore) - Aggregate Gradation (Iron Ore) - Aggregate Gradation (Sand) - Pipe Weight Scale Calibration - Holiday Detector Voltage Check - Visual Inspection & Holiday Detection - 3-LPE Coating Repairs (If Any) - Concrete Mix Temperature - Concrete Moisture Content - Reinforcement Required (Wire Mesh Control) - Reinforcement Placement, Overlap, Reinforcement Concrete Cover - Concrete Girth Measurements - Concrete Cut-Back Control - Visual Inspection of Applied Concrete - Weight of Freshly Concrete Coated Pipe - Calculation of Negative Buoyancy - Electrical Isolation Between Reinforcement/Pipe - Concrete Repairs (If Any) - Compressive Strength (Cubes) - Compressive Strength (Cores) - Density - Water Absorption

3 Concrete Coating Production - 3-LPE Coated Pipe Stacking (Temporary Storage) - CWC Plant, 3-LPE Coated Pipe Reception - Holiday Detector, Voltage Check - Visual Inspection & Holiday Detector - Pipe Weight Scale Calibration - 3-LPE Coating Repairs (If Any) - Ambient Temperature - Concrete Mix Temperature, Concrete Mix Content - Concrete Application - Reinforcement Required (Wire Mesh Control) - Reinforcement Overlap - Reinforcement Placement - Reinforcement Concrete Cover - Concrete Cut-Back Control - Reclaimed Concrete - Visual Inspection of Applied Concrete - Concrete Girth Measurements - Weighing of Freshly Concrete Coated Pipe - Calculation of Negative Buoyancy - Pipe Markings - Anodes Slotting - Concrete Repairs (Cracks) - Surface Damage - Electrical Isolation Between Reinforcement and Pipe - Colour Coding Concrete Coated Pipe

4 Laboratory Productions Tests - Concrete Moisture Content - Aggregate Gradation (Iron Ore) - Aggregate Gradation (Sand) - Compressive Strength (Cubes) - Compressive Strength (Cores) - Density 5 Handling – Stacking of Coated Pipe - Handling of Coated Pipe - Stack Heights - Load-Out 6 Records & Documentation - Documentation Record (All Reports on a Daily Basis) - Final Documentation (Data Books)

Completed Projects Epic of new 30" Trunk Line and Infield Lines Pipeline 30“ – 29 km. Concrete Thickness 80, 105 & 152,4 mm Pipeline 20“ – 5 km. Concrete Thickness 65 & 75 mm Pipeline 18“ – 5 km. Concrete Thickness 40 mm GARAGOL DENIZ DEVELOPMENT PROJECT Pipeline 14" – 74 km. Concrete Thickness 40 mm, 45 mm, 95 mm

Concrete Weight Coating Plant “Aladja” Plant Qualified Engineers and Operating Personnel Are Minded To Implement Projects Of Any Complexity Concrete Weight Coating Plant “Aladja” PetroGas FZE, 2010