City of Springfield Office of Public Works Street & Sewer Infrastructure Analysis 1 Mayor J. Michael Houston Mark Mahoney, Director.

Slides:



Advertisements
Similar presentations
What is a Storm Water Utility? A storm water utility is a method of financing the administration, planning, implementation and maintenance of storm water.
Advertisements

Capital Improvement Plan Financial Options September 12, 2013 Presented by: City Administration Finance Department.
TOWN OF ORONO FY2014 Draft Municipal Budget Presentation June 10, 2013.
Transportation System Needs House Transportation Committee Phil Williams, City of Bremerton Ashley Probart, AWC January 25, 2005.
The Metropolitan District Clean Water Project Update Connecticut Watershed Network Conference May 11, 2012.
Street Maintenance Funding Issues City Council Workshop April 1, 2013.
City of Farmersville, Texas Water and Wastewater Rate Study February 2011.
Response to LDEQ Consolidated Compliance Order and Notice of Potential Penalty.
FISCAL YEAR BUDGET MONROE METROPOLITAN POLLUTION CONTROL SYSTEM BUDGET 1 Presented by Barry S. LaRoy, P.E. Director of Water & Wastewater Utilities.
Municipal & Financial Services Group Water and Sewer Rate Study Revenue Requirements and Rates Workshop April 18, 2012 King George County Service Authority.
2014 STREET & UTILITY IMPROVEMENT PROJECT CITY COUNCIL MEETING November 18, 2013.
Revised FY 2007 & Proposed FY 2008 Operating & Capital Budgets Retail Rates Committee January 4, 2007.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Your Roads The Future, Some History, and Alternatives For Wasco County April 23, 2013.
Background Why Plan For Transportation? Facts You Should Know Expectations Projects and Costs Conclusions/ Next Steps.
Pavement Evaluation Survey Results and Understanding Condition Values PCI February 19, 2014.
DEPARTMENT OF TRANSPORTATION. Mission Statement Plan, Design, Construct, Operate and Maintain the roadway system under the jurisdiction of Lee County.
The City of North Bend Sanitary Sewer System
1 Combined Utility System Cost of Service Rate Study Presentation April 6, 2010.
CSO Strategies & Financial Management Mayor Gregory A. Ballard City of Indianapolis December 9, 2010.
Budget Work Session Fiscal Year July 27, 2010.
1 Town of Tillsonburg Lifecycle/Capital/Debt Strategy.
MONROE METROPOLITAN POLLUTION CONTROL SYSTEM BUDGET 1 FISCAL YEAR BUDGET Presented by Barry S. LaRoy, P.E. Director of Water & Wastewater Utilities.
THE FUTURE OF TRANSPORTATION FUNDING AN ALDOT PERSPECTIVE December 3, 2014.
Fiscal Years Outlook Preliminary Six-Year Financial Plan and Six-Year Improvement Plan Strategy John W. Lawson, Chief Financial Officer Reta.
Pavement Preservation Protecting the Investment and the Environment R. Gary Hicks CP2 Center, Chico, CA Prepared for CEAC 2014 Conference March 26-28,
2014 Budget Department Presentations Infrastructure Funding Options.
LLANO COUNTY MUD #1 ROAD PROJECT REVIEW PURPOSE DISCUSS POSSIBILITY OF COMPLETING REMAINING ROAD UPGRADE PROVIDE FACTS TO INFORM COMMUNITY TO MAKE DECISION.
Street Maintenance. The Town of Bayfield maintains centerline miles of road.
City of Houston Long Range Financial Management Task Force City Financial Overview Part I August 29,
Independent Review of FY 2008 Proposed Rates D.C. Water and Sewer Authority Public Hearing June 13, 2007.
Metro Cities Transportation Policy Committee August 10, 2015 Overview of Minnesota Highway and Transit Finance.
January 6,  INTRODUCTION  OVERVIEW OF FUNDS  SUMMARY  QUESTIONS  SUPPLEMENTAL INFORMATION ◦ Background Information and Capital Projects ◦
Public Hearing August 11, :00 pm. On May 3, 2011, the West Bountiful City Council adopted a balanced tentative budget maintaining current service.
BUDGET Compliance With Levy Limits. You are the next contestant on The Price is not Right Cost Controls from Madison have caused major problems.
1 Public Hearing User Rate Adjustments April 8, 2008.
City of Alexandria, Virginia Sanitary Sewer Master Plan February 23, 2013 City Council Public Hearing.
John Angiulli Interim Director PUBLIC WORKS DEPARTMENT Citizen Academy October 9 & 16, 2012.
BUDGET WORKSHOP FY13 April 4, City of Hendersonville Budget Workshop – April 4, 2012 GOALS and OBJECTIVES for 2013 To present a balanced budget.
WEDGEWOOD COVE HOA STREET PAVING/RESURFACING PROJECT.
Tom Thanas, City Manager Rachel Mayer, Director of Finance City of Joliet Mid-Year Budget Review August 2013.
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
March 21, BUDGET PRESENTATION- ROADS CAPITAL PROJECTS WATER WASTEWATER.
1. FY Proposed Budget Jamie Justice, Town Manager & Piet Swart, Finance Director April 26, 2016 Fiscal Year Proposed Budget 2.
City of Joliet 2016 Proposed Budget November 30, 2015.
Public Works/Municipal Utilities Department FY City Council Budget Workshop June 15, 2015 Presented By: Glen W. C. Kau, PE Director of Public Works/Municipal.
Presented By: Budget & Research Department Karen Rhodes-Whitley FY STATUS REPORT & THREE-YEAR FINANCIAL FORECAST SUMMARY FISCAL YEARS
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
City of Fernley, Nevada – 164 th Ave. NE, Suite 300, Redmond, WA April 18, 2007 Rate Study Findings Water and Sewer Utility Rates.
PUBLIC WORKS FY 2012 Proposed Budget May 24, 2012.
FY 2016 Water & Sewer Rates Presented by: The Department of Public Works Works.
Global Service Provider Buildings Energy Environment Transportation Water Water and Wastewater Rate Study Village of Villa Park, Illinois Presented to.
Presentation to CITY OF PALM COAST, FLORIDA FINANCIAL FORECAST AND CAPITAL FACILITIES FEES ANALYSIS Prepared in Conjunction With the Utility System Revenue.
1 Highland Water District CAPITAL IMPROVEMENT PLAN.
FY 2016 Budget Workshop June 11, 2015 Brian Maxwell, City Manager Dan Buckley, Deputy City Manager Mike Loftin, Finance Director 1.
Presented By: Budget & Research Department FY STATUS REPORT & THREE-YEAR FINANCIAL FORECAST SUMMARY (FY )
1 Budget Presentation Fiscal Year 2011 May 10, 2010.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
League of Wisconsin Municipalities Urban Policy Forum June 8, 2017
Transportation Development District Presentation
Village of Woodridge 2011 Pavement Analysis
PUBLIC WORKS DEPARTMENT
2018 Proposed Executive Budget
City of Delavan 2017 Budget.
SEWER SERVICE FEE RATE STRUCTURE ALTERNATIVE
Infrastructure Investment Needs
Common Sense Steps Towards Strong Financial Planning
Rate Commission Meeting
SEWER DEPARTMENT BUDGET WORKSHOP
Comprehensive and Dependable Transportation Plan
Presentation transcript:

City of Springfield Office of Public Works Street & Sewer Infrastructure Analysis 1 Mayor J. Michael Houston Mark Mahoney, Director

Street Needs Estimate $44 Million Needed Annually ◦ Road Maintenance i.e. Bituminous Overlay, Concrete Patching, Oil & Chip, and Sidewalk Repair ◦ Road Modernization i.e. Curb, Storm Sewer, and Sidewalk Installation ◦ Road Expansion i.e. Constructing a New Street or Widening an Existing Street to Support Increased Traffic 2

Road Conditions 3

Asphalt Road Ratings 4 Better Worse

Contributing Factors to Deteriorating Infrastructure Construction costs have more than doubled in last 10 years In 1997 the City owned 497 miles, now the City owns 625 miles Federal Funding for maintenance has vanished. In 2007 a FAU Overlay in the amount of $1.7 million was completed, funding for overlays has been non-existent since. MFT Funding has been decreasing since 2007 due in part to more fuel efficient cars Preventative Maintenance has been neglected 5

Asphalt & Concrete Costs 6

Municipality Size Comparison 7

FY14 Infrastructure Funding Federal funds/grants (i.e. ITEP & STU) and TIF funds could be utilized to help fund infrastructure improvements. The Department will be applying for these funds. Gambling revenue is a potential source of funding. 8

MFT Funds Contractual Services (i.e. Concrete Patching, Seal Coat and Crack Fill) Maintenance Materials (i.e. Salt, Asphalt, Rock, and Sign Materials) Engineering & Construction (i.e. Major Road, Bridge, Signal and IDOT Projects) 9

FY14 Infrastructure Improvements 10

Fund 95 Improvements Overlays FY 11 – 2.6 miles = $1.25 million ($481 k/mile) FY 12 – 4.0 miles = $2.57 million ($642 k/mile) FY 13 – 15 miles = $6.02 million ($400 k/mile) FY 14 – 15 miles = $6 million (proposed) Sidewalk FY 11 – 8,000 s.f. (0.4 miles) = $51 k FY 12 – 102,000 s.f. (4.8 miles) = $738 k FY 13 – 156,000 s.f. (7.4 miles) = $1.03 million FY 14 – 155,000 s.f. = $1 million (proposed) 11

Implemented Maintenance Measures Overlay Program – 15 miles Concrete Patching – Increased by 30% Seal Coat – Increased by 30% Crackfill – Doubled program Sidewalk Program – Increased by 30% 12

What should we be spending? 13

How to stop the decline Complete 135 miles of overlay the next 3 years and perform 24 miles of overlay per year thereafter Substantially increase preventative pavement maintenance (i.e. Cape Seals, Microsurfacing, CIR, Chip Seals and Crackfilling) Nearly triple the amount of sidewalk installation Remain at the recently increased concrete patching levels and start sealing and undersealing joints Repair failing brick streets Start performing preventative storm sewer maintenance Five times more maintenance required for traffic signals and striping 14

Necessary 3 Year Plan Asphalt Overlay (135 miles) $57.6 million Cape/Microsurfacing (50 miles) $4.5 million Concrete Patching (15 miles) $3 million Crackfilling (100 miles) $1 million Oil & Chip (150 miles) $3 million Sidewalk (1.2 million s.f.) $9 million Brick Streets (2 miles) $3 million Traffic Signals and Striping $1 million Storm Sewer $4.5 million TOTAL $86.6 million 15

Annual Maintenance Plan Program (proposed amount) CurrentProposed Overlay (24 miles per year) $4.5 million $12 million Sidewalk (400,000 s.f. per year)$1 million$3 million Cape/Micro(30 miles per year) -$2.5 million Concrete Patch (5 miles per year) $1 million $1 million Concrete Seal (20 miles per year) -$200,000 Seal Coat (50 miles per year) $600,000$1 million Crack Fill (60 miles per year) $150,000$600,000 Brick (.5 miles per year ) -$200,000 Storm Sewer $150,000 $1.5 million Traffic Signals & Striping $100,000$500,000 TOTAL $7.5 million $22.5million 16 Increase = $15 million

Current Funding Level Projection 17 Current Funding – Project only able to overlay 10 miles and 30 miles additional roads needing to be overlaid after 2013

Potential Long Term Savings The proposed increase will save the City approximately $21 million through 2018 It’s anticipated, at the current spending rate, that 220 miles (over 60%) of our asphalt would have deteriorated and need to be overlaid or reconstructed by 2018 Additional savings will occur beyond 2018 due to utilizing preventative maintenance and extending the life of our roads 18

Sewer Infrastructure Analysis and Needs 19

Overview ◦ The City of Springfield established the Sewer Fund in 1956 to maintain the Combined Sewers and Separate Sanitary Sewers. ◦ The City owns approximately :  140 miles of Combined Sewers  355 miles of Separate Sanitary Sewers  200 miles of Separate Storm Sewers ◦ Separate Storm Sewers dedicated only for storm runoff are not maintained by this Fund. ◦ This Fund was established to pay for improvements recommended in the first study of the sewer system completed in ◦ The study recommended $8.2 million in improvements = $97 million today 20

Financial Summary Notes ◦ Operation and Maintenance costs increase yearly. ◦ Repair costs continually increasing due to increases in the number of repairs and construction cost increase. ◦ Increased Expenses reduce money available for improvement projects. ◦ Sewer Surplus maintains funds for required loan reserves, capitol projects, and long term expenditures. 21

Sewer Rates 22 Meter ChargeConsumptionTotal City Sewer Rate$3.10$6.30$9.40 *Sanitary District Rate$3.57$14.90$18.47 Total$27.87 Current City Sewer Rates were established in The City does not set the Sanitary District Rates. Customers pay a base meter charge and a rate based on consumption. Rate paid for a typical residential customer using 10 units of water. Average Customer Basis (meter charge + 10 units of water consumption) City Rate$ (($0.35 x 3) + ($0.75 x 7)) = $9.40 District Rate$ ($1.49 x 10) = $18.47 Total $ = $27.87 * SMSD has scheduled rate increases thru 2016

Sewer Rate Comparison 23 1)Rates based on 10 units = 1,000 c.f. = 7500 gallons of water usage. 2)Rates do not include Sanitary District Fees.

Projects - FY13 Projects - FY13 Bancroft Branch Relocation completed summer 2012 City’s cost approximately $285, Mayden Street Sewer Replacement completed summer 2012 Cost approximately $200,000 Dirksen Parkway Sewer Lining - Ridge Street to Elm Street To be completed February 2013 Cost approximately $140,000 Total $625,000

Planned FY14 Project Areas Northeast and Grandview Sewer District - Flow monitoring Estimated cost $100,000 Cook Street Sewer District - Physical Inspection Pasfield Sewer Abandonment - Project Design 25 Westchester Trunk Sewer Upsizing Anticipated June 2013 completion Trenchless pipe bursting construction Estimated cost $615,000

Increasing Regulatory Concerns Increasing Regulatory Concerns - Collection System operation is regulated by the EPA. - The EPA is successful in rendering Administrative Orders and Consent Decrees against operators not maintaining their systems or complying with Federal Regulations. - The City is in the Administrative Order process with the USEPA at this time. We expect the order to be finalized soon. - The City will be required to complete an analysis of and fund projects to eliminate all Sanitary Sewer Overflows (SSO). - The USEPA will review and approve a timeline for completion. - This will have a significant impact on the Sewer Fund. 26

Metropolitan St. Louis Sewer District (MSD) 27 In August 2011, the Department of Justice filed a settlement, or consent decree, requiring MSD to spend a minimum $4.7 billion over the next 23 years to address the issue of overflows and other sewer system improvements.

What do we need? 28

City Project History 29 Amount available for projects will reach $0 in only a few years. Decreased maintenance spending now results in increased future replacement costs.

10 Year Capital Improvement Plan $55 million in projects already identified ◦ Sewer Division currently funds less than $1 million per year in projects. ◦ Several areas (Cook Street Sewer District, Harvard Park Area, Northeast Sewer District) will require studies to determine needs, this work will modify and add projects to the Long Range CIP. ◦ 10 Year Completion Goal not possible at current funding levels. ◦ USEPA Mandates are not accounted for in the current Long Range Plan. 30 FY13 Project Spending - $625,000 Minimum $5.5 million per year needed to complete CIP in 10 year time frame.

Conclusion The City of Springfield’s infrastructure is in decline. Long term increased costs of neglect will mean spending more by necessity or by regulatory order at some point in the future. Proposal to stop the decline: 3 Year- $86.6 million on streets, sidewalks, storm sewers, and traffic signals. Annual Maintenance Plan (effective FY2016)- $22.5 million on streets, sidewalks, storm sewers, and traffic signals 10 Year Sanitary Sewer Capital Improvement Plan- $55 million ($5.5 million annually) 31

Addendum 32

Population (1) Prop Tax Rate Home Rule Sales Tax Combined Sales Tax Rate (2) Food & Beverage Tax Vehicle Use Tax Telecomm Tax Liquor Tax Gas Tax Hotel Tax Bloomington 76, %7.75%2.00%0.75%3.50%4.00%0₵6.0% Champaign 81, %8.75%0.50%0.00%6.00%0.00%4₵5.0% Decatur 76, %9.00%2.00%0.00%6.00%0.00%0₵6.0% Normal52, %7.75%2.00%0.75%6.00%4.00%0₵6.0% Peoria115, %8.25%2.00%0.00%6.00%0.00%2₵6.0% Springfield 116, %8.00%0.00%1.00%4.00%0.00%0₵6.0% Urbana41, %8.75%0.50%0.00%6.00%1.00%4₵6.0% (1)IDOR certified 12/10(2) Some cites have public safety and/or school sales taxes passed by referendum Revenue Comparison 33