Action 12:Internal Monitoring BMW Regional Assembly.

Slides:



Advertisements
Similar presentations
LP Seminar – Madrid – 20 October 2008 EUROPEAN REGIONAL DEVELOPMENT FUND REPORTING & MONITORING PROCEDURES Lead Partner Seminar Madrid, 20 October 2008.
Advertisements

1 CIE Final Conference, 19 June 2014, Delft EUROPEAN REGIONAL DEVELOPMENT FUND CIE Final Conference, 19 June 2014, Delft EU Interregional Cooperation State.
Evidence Based Cohesion Policy Focus on performance incentives Thomas Tandskov Dissing Senior Adviser Ministry of Economics and Business Affairs Danish.
1 Danube Transnational Programme Zsuzsanna Drahos Ministry for National Economy Department of Territorial Development Planning 17 April 2015.
Introduction Overall project structure Pilot actions – short descriptions by partners Project management Budgets Audit & controls Project monitoring &
The URBACT II Programme General Presentation Vilnius, 20 January 2011.
Leonardo da Vinci Project BLENDED LEARNING TRANSFER Rationalising, Learning and Transferring the use of technological platforms to enterprise-based learning.
How to make a Progress Report Activity Reporting Lead partner and partner seminar Voss, Norway June 2008 Maxi Nachtigall.
Urban-Nexus – Integrated Urban Management David Ludlow and Michael Buser UWE Sofia November 2011.
Guidance Note 12 – Monitoring, Reporting and Evaluation Information for Lead Partners 21 September 2011 Sarah Reid Managing Authority.
IWRM PLAN PREPARED AND APPROVED. CONTENT Writing an IWRM plan The content of a plan Ensuring political and public participation Timeframe Who writes the.
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
Latvia–Lithuania Cross Border Cooperation Programme 2007–2013 WORKSHOP “How to prepare good application?” Joint Technical Secretariat 3rd.
TEMPUS IV- THIRD CALL FOR PROPOSALS Recommendation on how to make a good proposal TEMPUS INFORMATION DAYS Podgorica, MONTENEGRO 18 th December 2009.
Activity Reporting Lead Partner and Partner Seminar 16 June 2009 – Laukaa, Finland Kirsti Mijnhijmer.
Project Implementation Monika Balode Joint Technical Secretariat Lead Partner Seminar 16 October 2009, Šiauliai.
Cooperation in the mainstream programmes / article 37-6b example of Limousin (France) ‏ inhabitants inhabitants 43 inhab / km² 43 inhab.
Application Form Part 1, Sections 4-9 How to Apply Seminar 16 th September 2010 – Copenhagen Kirsti Mijnhijmer.
Information for Meeting in Sweden. FEEDBACK FROM UK NATIONAL AGENCY.
KEYWORDS REFRESHMENT. Activities: in the context of the Logframe Matrix, these are the actions (tasks) that have to be taken to produce results Analysis.
APPLICATION FORM OF ROBINWOOD SUBPROJECT SECOND STEP 1. The short listed Local Beneficiaries work together to create international partnerships and prepare.
Part-financed by the European Union Project implementation and monitoring: What is good to know when applying? Joint Technical Secretariat Lead Applicant.
South East Europe Transnational Cooperation Programme Bologna, 15° June 2009 Kick-off meeting of project SARMa SEE Joint Technical Secretariat.
EUROPEAN REGIONAL DEVELOPMENT FUND RECOMMEND Final Event, 11 September 2014, Varna EU Interregional Cooperation State of play and perspectives Jason Martinez.
EUROPEAN REGIONAL DEVELOPMENT FUND Event – date, place About INTERREG EUROPE INTERREG EUROPE INTERREG IVC Joint Technical Secretariat.
Expert group meeting on draft delegated act on the European code of conduct on partnership (ECCP) under cohesion policy
Narrative reporting: good practices. Joint Technical Secretariat Seminar for Beneficiaries February 2012 Narva, Estonia.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
NHS European Office Accessing EU structural funding Michael Wood, European Policy Manager 25 July.
Regional Policy EU Cohesion Policy 2014 – 2020 Proposals from the European Commission.
IPA Funds Monitoring and Evaluation December Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal Kapasitenin Oluşturulmasına.
Result Orientation in Interreg CENTRAL EUROPE Annual Meeting, Luxemburg, 15 September 2015 Monika Schönerklee-Grasser, Joint Secretariat.
Activity Reporting Lead Partner Seminar 20 th January 2011, Friars Carse Hotel, Dumfries, Scotland Rachel Burn.
Developing a Sustainable Procurement Policy and Strategy EAUC – EAF Programme.
Project preparation workshop “Bringing a transnational project to life” Project idea “Challenges and chances from Climate Change for regional and local.
Activity Reporting Lead Partner Seminar 22 February 2012 Copenhagen Rachel Burn.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
ESPON 2013 Programme Info Day on Calls and Partner Café Call for Proposals on Targeted Analysis A Decade of Territorial Evidence.
Guidelines for LDS preparation for Croatian LAG’s Estonian Leader Union Kadri Tillemann and Kristiina Timmo 28 th of September, Zagreb.
ELearning Socrates Minerva Concertation Meeting Helsinki 3 July 2006 « Dissemination and Exploitation of Results » Janette Sinclair European Commission.
Antonio Mocci Mestre, January 17, 2011 Lead partner: Governance of the project monitoring, evaluation and dissemination systems.
Southend Together Secretariat 21 st February Developing Southend Together’s Sustainable Community Strategy
Application procedure From theory to practice Dieter H. Henzler, Steinbeis-Transfercenter Cultural Resources Management, Berlin.
Knowledge Direct Support SMART+ STRATEGIC EXCHANGE SMART+ Methodology for Strategic exchange of GPs for the improvement of SMEs innovation capacity Sevilla,
Changing the way the New Zealand Aid Programme monitors and evaluates its Aid Ingrid van Aalst Principal Evaluation Manager Development Strategy & Effectiveness.
1 EUROPEAN FUNDS IN HALF-TIME NEW CHALLENGES Jack Engwegen Head of the Czech Unit European Commission, Directorate General for Regional Policy Prague,
Grant Application Form (Annex A) Grant Application Form (Annex A) 2nd Call for Proposals.
ESPON Info Day on New Calls and Partner Café 18 May 2010 in Bruxelles Call for Proposals on Transnational Networking Activities (Projects carried through.
"The challenge for Territorial Cohesion 2014 – 2020: delivering results for EU citizens" Veronica Gaffey Acting Director EUROPEAN COMMISSION, DG for Regional.
Work Package 1: Progress and Focus on specific issues 5th Steering Committee Meeting Rijeka, 26/2/2015 Presented by: Mrs Maria Poulou.
27/04/2017 Strengthening of the Monitoring and Evaluation system for FTPP/FTTP in FAO /SEC December 2015 FTPP/FTFP Workshop, Bishkek, Kyrgyzstan.
Sectoral Operational Programme “INCREASE OF ECONOMIC COMPETITIVENESS” October 2005 MINISTRY OF ECONOMY AND TRADE.
EUROPEAN REGIONAL DEVELOPMENT FUND Interregional Cooperation State of play and future perspectives SHARP final conference – 10 October 2012 Katja Ecke|
URBACT IMPLEMENTATION NETWORKS. URBACT in a nutshell  European Territorial Cooperation programme (ETC) co- financed by ERDF  All 28 Member States as.
Project design – Activities and partnership CENTRAL EUROPE PROGRAMME Project development seminar Prague, 1-2 February 2010 Monika Schönerklee-Grasser.
URBACT INFODAYS PORTUGAL TOWARDS URBACT III Lisbon 21st January 2015.
W. Schiessl, AGRI E.II.4 Programme management and institutions involved in monitoring and evaluation.
Transnational Working & Reporting Procedures. LP Seminar January 2013 Transnational Cooperation & Reporting Procedures I) Transnational cooperation: Definition.
CENTRAL EUROPE PROGRAMME WORKSHOP A: Preparing an application – focus on activities and partnership Project development seminar Prague, 1-2 February.
Transnational Working & Reporting Procedures What project promoters cannot ignore about INTERREG IVB NWE project monitoring.
A project funded by the European UnionImplemented by a consortium led by Get ready for the call! Next steps for building partnerships and developing a.
PROJECT MONITORING What project promoters cannot ignore about INTERREG IVB NWE project monitoring.
Evaluating ESD in RCEs: The Start-up Tools
Application Form Sections 4-9 Christopher Parker & Kirsti Mijnhijmer 28 January 2009 – Copenhagen, Denmark European Union European Regional Development.
Evaluation in the GEF and Training Module on Terminal Evaluations
The role of the ECCP (1) The involvement of all relevant stakeholders – public authorities, economic and social partners and civil society bodies – at.
Project intervention logic
DG Justice and Consumers
How is an M & E framework derived from the logframe?
Presentation transcript:

Action 12:Internal Monitoring BMW Regional Assembly

Monitoring 1 3 Key Elements – Capturing all project outputs, relative to performance indicators in approved application – Analysis of progress on all planned actions relative to agreed timeframe and milestones – Monitoring expenditure v forecast for each partner and project-level cost category All of the above are required to complete 6 monthly progress reports

Monitoring 2 2 Additional Elements – Regional Stakeholder Feedback Forms – Action Beneficiary Feedback Forms – Contribute to Best Practise Guide (Action 11) – Input to External Evaluation (Action 13) – Contribute to Mainstreaming Strategy (Action 14)

Progress Reporting BMW Regional Assembly

Progress Report – General Issues One common report for the whole partnership In line with the Application Form (Action Plan) Twice a year (April/October) Long Version (April) to cover previous calendar year, including indicator data and Work Package Reports Short Version (October) to cover 6 months (January – June) Assessment of the Progress Report through a JTS Monitoring Report Must meet deadlines – 31 st October & 30 th April

Short Progress Report – October I.General Information (general project data, details on reporting period, summary description of the project in English) II.Progress of the project – last 6 months (e.g. main achievements, added value of working transnationally, problems encountered) III.Monitoring of QUALITATIVE indicators (e.g. strength of cooperation between partners, innovativeness, capitalisation on previous projects) IV.Date and signature of the Lead Partner

Long Progress Report – April I.General Information II.Overall cumulative progress of the project III.Progress of the project – last 12 months (including reporting on WPs and investments, submission of supporting annexes) IV.Monitoring of QUANTITATIVE indicators (indicators specified in the Application Form) V.Planned activities for the next 12 months VI.Date and signature of the Lead Partner

Indicators Indicator – the measurement of an effect to be obtained. 2 Progress Reports – 2 sets of indicators Qualitative (in October PR) Qualitative (in October PR) Quantitative (in April PR) Quantitative (in April PR) general Priority specific results outputs RESULTS (immediate effects) RESULTS (immediate effects) IMPACTS (long-term effects) OUTPUTS (direct outcome) INPUT ERDF general

Progress Report – JTS Guidance Give an accurate picture of the project’s progress through concise and relevant information Avoid reporting on activities that have not yet taken place Report on the implementation of the project as a whole, rather than on the partners’ individual activities (use annexes!) Report on achievements (outputs) and on the added-value of transnational cooperation Avoid listing a number of unrelated activities not clearly linked to the Action Plan Draft together (it is not a compilation!) Provide the JTS with material to disseminate

Action 13:Evaluation BMW Regional Assembly & Líonra

Evaluation 1 Independent evaluation to be undertaken prior to project completion Draft terms of reference to be prepared by Líonra and approved by the Project Steering Committee Evaluator to be procured by Líonra Evaluation will feed into mainstreaming strategy and final progress report Evaluation Report to be made available publicly and presented at final project conference

Evaluation 2 The approved application identifies 8 Fields of Interest for the final evaluation: A description of the project processes and implementation arrangements, actions, outputs and resources applied An assessment of the results of the overall project, relative to the original indicators agreed Verification of the attainment of the project’s goals, including its contribution to cross- cutting programme themes (Europe 2020 and sustainable development); An assessment of the lasting (sustained) effects of the project on the stimulation of early- stage knowledge-intensive enterprises with export potential A review of the contribution of the project to the achievement of objective 1.3 of the NWE Programme, i.e., the use of territorial co-operation in order to strengthen the institutional and territorial framework for innovation and the transfer of knowledge within the NW Europe area. An assessment as to whether the communication and dissemination objectives for the project and the related indicators have been attained An assessment of the overall effectiveness and efficiency of the project’s delivery Identification of further actions that could be taken at a regional or inter-regional level to inform future innovation and cohesion policy within the NW Europe area.