1 ILC and Future Programs Stephen Wolbers February 16, 2007.

Slides:



Advertisements
Similar presentations
Beyond the ALCPG David B. MacFarlane Associate Laboratory Director for PPA.
Advertisements

1 August 7, 2006 David Hitlin DOE Annual Program Review David Hitlin DOE Annual Program Review August 7, 2006.
Department of Energy Office of Science Yet Another Report from DOE Office of High Energy Physics Presented to SLUO September 10, 2006 Dr. Robin.
High Energy Physics Theory: Bigi, Delgado, Kolda –1 postdoc –5 students Experiment: Hildreth, Jessop, Lannon LoSecco, Ruchti, Wayne –3 research professors.
Roles of IT Personnel Unit Customer Service This is a facility that helps customers with wide-ranging questions relating to a specific company,
Introductions Jim Enzinna, Chief, Licensing Division Mark DiNapoli, Assistant Chief, Licensing Division Tracie Coleman, Head, Information Section Vince.
Tevatron BPM Upgrade Project Manager Overview Stephen Wolbers Tev BPM Technology Choice Review December 16, 2003.
F Run II Experiments and the Grid Amber Boehnlein Fermilab September 16, 2005.
International collaboration in high energy physics experiments  All large high energy physics experiments today are strongly international.  A necessary.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
INTOSAI Public Debt Working Group Updating of the Strategic Plan Richard Domingue Office of the Auditor General of Canada June 14, 2010.
Requirements Review – July 21, Requirements for CMS Patricia McBride July 21, 2005.
Advancing Cooperative Conservation. 4C’s Team An interagency effort established in early 2003 by Department of the Interior Secretary Gale Norton Advance.
SLUO LHC Workshop: Closing RemarksPage 1 SLUO LHC Workshop: Closing Remarks David MacFarlane Associate Laboratory Directory for PPA.
Instrumentation of the SAM-Grid Gabriele Garzoglio CSC 426 Research Proposal.
US CMS/D0/CDF Jet/Met Workshop – Jan. 28, The CMS Physics Analysis Center - PAC Dan Green US CMS Program Manager Jan. 28, 2004.
Operations, Test facilities, CF&S Tom Himel SLAC.
Robert Klanner - DESY 1 DESY, HERA and the US contribution HERA and DESY HERA status ZEUS and the US groups HERA and particle physics.
Background Physicist in Particle Physics. Data Acquisition and Triggering systems. Specialising in Embedded and Real-Time Software. Since 2000 Project.
F COMPUTING DIVISION ALL-HANDS MEETING May 7, 2004.
Commodity Node Procurement Process Task Force: Status Stephen Wolbers Run 2 Computing Review September 13, 2005.
DESY Photon Science XFEL official start of project: 5 June 2007 FLASH upgrade to 1 GeV done, cool down started PETRA III construction started 2 July 2007.
Office of Science U.S. Department of Energy 1 International Linear Collider In August 2004 ICFA announced their technology selection for an ILC: 1.The.
Workshop on Women in Science and Engineering Latifa Elouadrhiri Jefferson Lab November 16, 2009.
Tevatron BPM Upgrade Stephen Wolbers CD Accelerator Coordination Meeting August 3, 2004.
Outline  Introduction  Higgs Particle Searches for Origin of Mass  Grid Computing Effort  Linear Collider Detector R&D  Conclusions A Quest for the.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
Tevatron BPM Upgrade Stephen Wolbers CD Accelerator Coordination Meeting September 21, 2004.
Update on the project - selected topics - Valeria Bartsch, Martin Postranecky, Matthew Warren, Matthew Wing University College London CALICE a calorimeter.
HEP and NP SciDAC projects: Key ideas presented in the SciDAC II white papers Robert D. Ryne.
Department of Energy Office of Science  FY 2007 Request for Office of Science is 14% above FY 2006 Appropriation  FY 2007 Request for HEP is 8% above.
CD FY08 Tactical Plan Status FY08 Tactical Plan Status Report for LSCS-DBI-APP Dennis Box June
JetMET, Feb26 th 2003V. Daniel Elvira Geant4 at Fermilab Geant4 is a toolkit for the simulation of the passage of particles through matter. ( Collaboration.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Computing Division FY03 Budget and budget outlook for FY04 + CDF International Finance Committee April 4, 2003 Vicky White Head, Computing Division.
John Womersley 1/13 Fermilab’s Future John Womersley Fermilab May 2004.
Welcome !! to the CAoPAC Workshop Carsten P. Welsch.
Planning/Budget Stephen Wolbers CD All Hands Meeting May 7, 2004.
Client Senior Design Electrical and Computer Engineering Iowa State University Introduction Abstract Architectural plans are currently being developed.
Americas comments on Linear Collider organization after 2012 P. Grannis, for LCSGA – Aug. 24, 2011 ILCSC GDE.
SLAC and ILC Jonathan Dorfan, Director LCFOA, SLAC May 1, 2006 Particle & Particle Astrophysics.
OAUG SysAdmin SIG OAUG Collaborate ’07 Las Vegas, NV April, 2007.
Argonne’s Rôle in ZEUS José Repond Argonne National Laboratory DOE Visit, Germantown, March 11 th, 2004.
Follow-up to SFT Review (2009/2010) Priorities and Organization for 2011 and 2012.
Projects, Tools and Engineering Patricia McBride Computing Division Fermilab March 17, 2004.
Victoria A. White Head, Computing Division, Fermilab Fermilab Grid Computing – CDF, D0 and more..
1 What’s Happening on the ILC Controls Front at FNAL Margaret Votava Fermilab January 9th, 2006.
Nigel Lockyer Fermilab Operations Review 16 th -18 th May 2016 Fermilab in the Context of the DOE Mission.
SYSE 802 John D. McGregor Module 0 Session 3 Systems Engineering QuickView.
Nigel Lockyer Fermilab Operations Review 16 th -18 th May 2016 Fermilab in the Context of the DOE Mission.
CMS Crosscut Operations and Research, Theory, Computing, University Involvement C. Young and B. Zhou.
Fermilab: Introduction Young-Kee Kim DOE KA12 (Electron Research)Review June 22-23, 2010.
PREP Task Force Report. PREP: “Physics Research Equipment Pool” Online equipment request form. Catalog of modules and infrastructure. (93K units) Offsite.
CPM 2012, Fermilab D. MacFarlane & N. Holtkamp The Snowmass process and SLAC plans for HEP.
Scientific Computing at Fermilab Lothar Bauerdick, Deputy Head Scientific Computing Division 1 of 7 10k slot tape robots.
CD FY08 Tactical Plan Review FY08 Tactical Plans for Linear Collider Controls, LLRF, Instrumentation, Detector, Physics Studies Stephen Wolbers for the.
Particle Physics Sector Young-Kee Kim / Greg Bock Leadership Team Strategic Planning Winter Workshop January 29, 2013.
Jayakar Thangaraj Fermilab Accelerator Advisory Committee November 7-9, 2011 PROTOPLASMA: Proton-driven wakefield experiment at Fermilab.
Capabilities and Programmes of STFC’s Accelerator Science & Technology Centre (ASTeC)
Gene Oleynik, Head of Data Storage and Caching,

LHC Science Goals & Objectives
The European Strategy for Particle Physics
Clinical Engineering Lecture (3).
EU Institution Board 1 representative of each participating institute
ESS RF Development at Uppsala University
Yet Another Report from DOE Office of High Energy Physics
Please click on any button below
Prospect of Indo-US Collaboration
Presentation transcript:

1 ILC and Future Programs Stephen Wolbers February 16, 2007

2 Talks you will hear today (in one hour!) Steve Wolbers – ILC and Future Programs overview Amber Boehnlein – Accelerator and Detector Simulations Margaret Votava (for Jerry Guglielmo) – Data Acquisition and Controls Vince Pavlicek – Electronic Systems Engineering

3 Safety I’d like to emphasize right at the start that working safely, and more importantly, not having any injuries, is important to me. Please take care, do not take unnecessary chances, ask for help or training when needed. I think that together we can keep our workplaces safe and even improve them.

4 ILC and Future Programs Overview On December 1, 2006 CD was reorganized into 4 “quadrants” –“quadrant” is used for lack of a better word. –Each quadrant is a set of departments and groups that have some common mission.

5 ILC and Future Programs The name: –The ILC part is pretty obvious –“Future Programs” is encompasses a variety: We work on NOVA We support Run 2 and the accelerator We support CMS and are involved in CMS development We manage PREP and equipment repair Etc. –But the emphasis is on the future and enhanced capabilities.

6 IFP Mission Statement The ILC and Future Programs Quadrant of the Computing Division promotes and fully contributes to and collaborates on International Linear Collider (ILC) and future scientific programs at Fermilab by developing and providing innovative and excellent scientific, computing, engineering and technical skills and techniques.

7 How this relates to CD and the lab’s mission The Computing Division’s mission is to play a full part in the mission of the laboratory and in particular to proudly develop, innovate, and support excellent and forefront computing solutions and services, recognizing the essential role of cooperation and respect in all interactions between ourselves and with the people and organizations that we work with and serve.mission of the laboratory

8 How this relates to CD and the lab’s mission Fermi National Accelerator Laboratory advances the understanding of the fundamental nature of matter and energy by providing leadership and resources for qualified researchers to conduct basic research at the frontiers of high energy physics and related disciplines.

9 How this relates to CD and the lab’s mission The Fermilab Research Alliance (FRA) proposal has many details about the lab’s mission and plans: – They mention three major areas: –Energy Frontier –Neutrinos –Astrophysics I don’t have time to go into great detail but it is safe to say that ILC and Future Programs is involved in all three major areas of the laboratory.

10 Short ILC Interlude: ILC news Preliminary reference design report (RDR) and cost was released last week. –Many people in CD and the lab worked on this and will work on test facilities, detector R&D, controls, the Engineering Design Report (EDR), etc.

11 Introductions Quadrant Leaders –Steve Wolbers (head) –Amber Boehnlein (deputy) –Bakul Banerjee (assistant) –Vince Pavlicek (assistant) Electronic Systems Engineering Dept. –Vince Pavlicek (acting head) Accelerator and Detector Simulations Dept. –Amber Boehnlein (head) DAQ and Controls Department –Jerry Guglielmo (head)

12 The rest of the talks The rest of the talks will better cover the three departments.

13 Accelerator and Detector Simulations Amber Boehnlein

14 ADS Mission Statement The mission of the Accelerator and Detector Simulation Department/FNAL CD is to take responsibility in national and international simulation projects for critical contributions by providing leadership, scientific knowledge and technical expertise to the FNAL ILC detector design teams, in the accelerator modeling community, the CMS LHC Physics Center and as members of the Geant4 collaboration. Our significant skills in C++ and other programming languages provides, advances and improves code bases used for simulation and other endeavors. We contribute to the on-going scientific programs of the laboratory including CMS and Run II and the FNAL neutrino program by providing support and expertise to those communities by providing a library of certified generated events, as well as participating directly in physics analysis.

15 Simulation Focal Areas Physics Generators Accelerator Modeling CMS ILC detector optimization

16 ADS Projects & Tools PythiaPythia PatriotPatriot Data/Monte Carlo tuningData/Monte Carlo tuning Physics Generators Accelerator Modeling CMS ILC detector optimization SynergiaSynergia ChefChef Benchmarking Simulations & Software validation Framework/EDM LPC Leadership & participation GEANT 4 collaboration Technical performance Hadronic shower parameterization SiD tracking development Phyics process benchmarking Community support for org.LCSIM ILC calorimetery survey Detector design (with PPD)

17 Contributions and Collaborations Accelerator modeling - SciDAC Lattice QCD GEANT 4 collaboration C++ International Standards Body FNAL ILC Working Groups Experiment collaborators

DAQ and Controls Department A brief Introduction and Summary of Activities ILC and Future Programs Quadrant Meeting - 16 February

DAQ and Controls Department Mission Statement The mission is to provide technical advice, develop and support performant, robust, and well documented DAQ and Controls related software solutions to Fermilab, the Fermilab user community and the global ILC effort in a timely manner, appropriately reflecting Computing Division and Laboratory priorities. The organization provides services tailored to the needs of the client, ranging from design and independent reviews of systems and software to development and support of new systems including high and low level project management where appropriate, with the highest level of professionalism and excellence. ILC and Future Programs Quadrant Meeting - 16 February

DAQ and Controls Department Activities for LHC and ILC LHC at Fermilab Storage Server Snapshot Service Role Based Access ILC ILCTA Controls ILC Controls ILC Controls RDR/EDR L2 Manager (M. Votava) ILC and Future Programs Quadrant Meeting - 16 February

DAQ and Controls Department Activities for Infrastructure and Management Activities Kernels Linux and VxWorks Kernel Support VxWorks Liaison and Support Design and Review Experiments and Facilities Applications and Drivers CAMAC, VME, etc. Meson Test Beam Facility DAQ ILC and Future Programs Quadrant Meeting - 16 February

DAQ and Controls Department Activities for Experiment Software Run II D0 Online SDSS II DAQ Support Nova DAQ Software L3 Management (G. Guglielmo, M. Votava) Meson Test Beam Facility DAQ ILC and Future Programs Quadrant Meeting - 16 February

DAQ and Controls Department Activities for a Variety of Projects Accelerator Support MI and TeV BPM Collaboration Tools Control Room Logbook Real Time 2007 Conference Committee Chair (M. Votava) Local Organization (G. Guglielmo) PREP KTeV Hall and Support Experiment Liaison COUPP, Minerva ILC and Future Programs Quadrant Meeting - 16 February

24 ESE Department Intro and current activities Vince Pavlicek Electronics Systems Engineering Dept.

25 ESE Mission Statement The mission of CD Engineering is to provide high quality design, implementation, maintenance and project management support for hardware systems for HEP and Astrophysics experimentalists and phenomenologists. Hardware systems include board and system level hardware and firmware, and infrastructure electronics.

26 Department Groups DAQ Controls and Timing Detector Instrumentation Engineering Support  Engineers & Engineering Associates  Technical Specialists & Technicians

27 CDF SVX Example projects

28 D0 Mixer Installation Example projects

29 TeV BPM Installation Example projects

30 MI BPM Installation Example projects

31 Current Activities - ILC ILC Super Conducting RF R&D – cavity controller hardware and firmware. ILC detector test beam – telescope and DAQ development sharing Phenix hardware. ILC BPM R&D, KEK test beam timing cards and support. ILC Controls global group – RDR, costing and EDR efforts. Also collaborating with the LLRF and instrumentation areas.

32 Current Activities - 2 CMS pixels – support for silicon production and debugging. SLHC – collaborating with the FNAL contingent. SNAP – SLICE card design and interface to ICU. SLICE firmware for data processing. Dewar interface cards for SNAP FRIC module environmental testing. Phenix silicon upgrade – prototype modules and interconnects design and testing. Test stand development and support.

33 Current Activities - 3 NOvA DAQ hardware development – Data combiner module, timing system and DAQ farm support. MICE - VLSB board support and negotiating an upgrade project. Equipment Support - Repair, assembly and rework for experiments, PREP, FNAL and other HEP lab support.

34 Current Activities - 4 AD – IPM and BPM systems support for TeV and Main Injector. Run 2 collider experiment support – various modules and systems as needed.

35 ILC Low-Level RF DESY Simcon Low Level RF Controller (DocDB #1641) FNAL Low Level RF Controller (DocDB #2008). Production review was today. The new firmware is already very successful.

36 Down the Track We are a proven collaborator that plans to contribute hardware engineering to controls, instrumentation, detector and test beam tasks. We have a disciplined approach to engineering that produces robust designs which meet the customer requirements. We understand hardware standards and utilize them where appropriate for cost efficiency.

37 Finito