The Woodrow Wilson Memorial Bridge Project Rich Carmona Michael Francis.

Slides:



Advertisements
Similar presentations
I-95 HOT/HOV Lanes Project Fairfax County TAC August 16, 2011.
Advertisements

City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
INTRODUCTION TO INFRASTRUCTURE: AN INTRODUCTION TO CIVIL AND ENVIRONMENTAL ENGINEERING Chapter 4: Transportation Infrastructure.
ENG-1010 Lecture 16 Bridge Design.
Minnesota Department of Transportation House Transportation Policy & Finance Committee February 23, 2015.
Long Range Visioning Workshop November 13,14,15 th 2007 Tim Watkins Envision U.
BRIDGES: CONNECTING HUMANS THROUGH THE AGES Daria Prikhodko 627 gr.
I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.
Bridge No over the Spokane River at State Line (looking south) 1 of 19.
The Way Forward – A 21 st –Century Transportation Plan Frank DePaola, P.E. Administrator, Highway Division April 2013 Massachusetts Department of Transportation.
The state of New Hampshire has a uniform list of traffic fines for certain offenses. Here are the road behaviors that could end up costing you more than.
By Francisca Carlos by Francisca Carlos Golden Gate.
1 Corey W. Hill Chief of Public Transportation May 20, 2008 May 20, 2008.
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
GE541 Economic Geography of Transport October 30th.
SR520 Urban Partnership Project 2008 ITS Washington Annual Meeting November 12th, 2008 – Seattle Jennifer Charlebois, P.E. Tolling and Systems Project.
1 Patent Outcome Region (t = 80%) a b c. 2 Quality Improvements in the POR (t = 80%)
Manitoba Infrastructure and Transportation RADBUG - August 2014 Water Management and Structures.
Hoover Dam Bridge. Creeping closer, 900’ above the Colorado River, the two sides of a $160 million bridge at the Hoover Dam slowly takes shape The bridge.
Bridge Rehabilitation W Interstate 290 over CSX Railroad and 4 City Streets I-290 Viaduct Reconstruction.
Exponents Exponents - An introduction - By Carol Edelstein David E. Owens Middle School New Milford, NJ.
Golden Gate Bridge is found in Marin County, San Francisco.
TRAFFIC SIGN BY kru Somjai Triratsuk Warning Signs School Signs Slipper Road Turn left Curve Right.
THE BROOKLYN BRIDGE Ana Cristina Ayala Anette Rossi.
Part II: Case Studies 1.Arlington, VA: Transit-oriented Development Boosts Economy County-wide. 2.Portland, OR: Streetcar Increases Investment and Redevelopment.
Opened to traffic: July 1, 1940 Collapsed: November 7, 1940 Lewis Cluck - lxc Advanced Requirements Engineering – SE 6361.Z01 Oct. 26, 2012.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
MML Capital Conference MML Capital Conference Director Kirk T. Steudle, P.E. Michigan Department of Transportation March 4, 2009.
Woodrow Wilson Bridge Project 1 Fish Protection Strategies on the $2.45B Woodrow Wilson Bridge Project ~Presented By~ Mike Baker, Environmental Manager.
Modeling HOT Lanes TPB’s Approach AMPO Travel Modeling Group March 21, 2006 I:\ateam\meetings_conf\ampo_tms\ \Hot_Lane_Pres_to_AMPO_Final.ppt.
The Brooklyn Bridge is a suspension bridge that crosses the East River in New York City. It connects Brooklyn and New York. John Roebling came up with.
1 Item 12: Report on Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Bridge Expansion Feasibility Group. Purpose Our group is an independent coalition striving to provide objective information on the expansion of the Ambassador.
FULL FREEWAY CLOSURES RECENT SUCCESS STORIES IN KENTUCKY.
Freeway Congestion In The Washington Region Presentation to National Capital Region Transportation Planning Board February 15, 2006 Item # 9.
The Verrazano Narrows Bridge Othmar Ammann’s Greatest Work of Structural Art.
2004 State of the Commute Survey: Assessing the Impacts of Regional Transportation Demand Management National Capital Region Transportation Planning Board.
The Purple Line Transit Connecting Bethesda, New Carrolton, and the Washington Metro Presented by- Nick Flanders Rose Ryan Anupam Srivastava.
Texas Department of Transportation Corpus Christi District U.S. 181 (Harbor Bridge) Environmental Documentation and Schematic Development Citizens’ Advisory.
Review of the Texas Transportation Institute (TTI) 2007 Urban Mobility Report By Ronald F. Kirby Daivamani Sivasailam TPB Technical Committee October 5,
BRIDGE BREAKDOWN: EVALUATING THE ARCOLA BRIDGE ANNA GEORGE GRADE 12 METHACTON HIGH SCHOOL 3 RD YEAR AT PJAS.
Tacoma Narrows Bridge “The Galloping Gertie”. Why was it built? Commissioned in 1937 to cross the Tacoma Straits of Puget Sound Commissioned in 1937 to.
1 Destination 2030 Kern Regional Transportation Needs * Information provided by Kern Council of Governments.
Presents. Tough Times For Transportation Funding Declining gas tax revenues Declining state revenues for aviation, highways and transit Uncertain.
INCORPORATING INCOME INTO TRAVEL DEMAND MODELING Brent Spence Bridge Case Study October 13, 2015.
Bridge Expansion Feasibility Group. Purpose Our group is an independent coalition striving to provide objective information on the expansion of the Ambassador.
Measurement Imperial System Foot (‘) – Inch (“)
The Regional Mobility and Accessibility Study Initial Results of CLRP/CLRP+ Analysis with Round 6.4 Growth Forecasts and Five Alternative Land Use Scenarios.
THREE GORGES DAM BY DANI GRAVES AND SANDRA MANCHESTER.
Geometric Design: General Concept CE331 Transportation Engineering.
Status Report on the Regional Value Pricing Study Ronald F. Kirby, Director of Transportation Planning November 15, 2006 Item 11.
Objective Transportation Assets Strategic Intermodal/International Points Next Steps & Discussion Critical Issues for Ohio.
STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY.
HOW GOVERNMENT REGULATION CREATES SPRAWL: JACKSONVILLE AS A CASE STUDY.
Transportation Revenue Sources Presentation to the Discovery Institute October 6, 2004 Amy Arnis Deputy Director Strategic Planning and Programming Washington.
Solving the SR-520 Problem © 2005 Chaisy, Hurvitz, Jiang, Jun, ShinnersSlide 1 (of 31) Solving the SR-520 Problem prepared for UTRAN prepared by INSTEP.
8 th Grade Applied Technology Mr. Giannone. In this unit we will study structures and the forces that affect them.
SR 417 Extension Sketch-Level Traffic & Revenue Evaluation
The I-465 West Leg Reconstruction Project
Problem – Solution - Impact
Investigation of Road Project
Major Projects in Development
Hoover Dam.
ITTS FEAT Tool Methodology Review ITTS Member States Paula Dowell, PhD
Geometric Design: General Concept CE331 Transportation Engineering.
The Great Belt East Bridge
The Millau Viaduct Paris - Barcelona.
The Millau Viaduct Paris - Barcelona.
Welcome to the Final Cross County Trail Public Input Session!
National Organization of Minority Engineers Leadership Summit
Presentation transcript:

The Woodrow Wilson Memorial Bridge Project Rich Carmona Michael Francis

Completed 1964 Total Length –1798m Width – 33.5m 6 Lanes of Traffic Height – 50 ft Designed to carry 75,000 vehicles per day $15 Million The Original Bridge

Current Conditions In Washington D.C. Approximately 200,000 vehicles per day Estimated to grow to 295,000 per day by 2020 Trucks will have to be prohibited in 2004 Cost of rehabilitation is equal to the cost of a new bridge Structural damage caused by dynamic vibrations from overloading

New Bridge Total Length –1829m Width – 72.3m 12 Lanes Height – 70 ft 18 Spans Box-girder construction Cost – $492 million

Bascule Span Bridge 17 th Street Bridge (completed 2001) Total Length – 582m Width m 4 Lanes Height – 55 ft Variable depth segmental construction Cost - $65 million

Parsons Transportation New Tacoma Narrows Bridge (completed 2007) Total Length – 1645m Main Span – 853m Width – 20.1m 3 Lanes Deck stiffened suspension $615 Million

Cost Comparison Both bascule spans are much cheaper per square foot Slightly higher costs of the new Wilson Bridge can be attributed to its greater height

Scientific

Social Impact Traffic Lanes will increase from 6 to 12 Eventually there will be mass transit over the bridge

Bridge Openings The new bridge is taller to allow for fewer openings of the drawbridge which means less standstills. The backups are regularly miles long in both directions as eight lanes of beltway squeeze into six.

Social Impact Alternatives was to reroute trucks to I-395, I- 295 and Route 301. About 20,000 trucks a day could be diverted from the Beltway. $58 Billion of trucked GDP crossed the bridge in The diversion of traffic from I-95 would have bad effects on the economy

Symbolic Symbolic of the politics and red tape of D.C. Looking towards the past Will increase the suburbanization of Washington D.C.

Symbolic In D.C. it had the opportunity to be a memorable structure- identifying mark of the region

Structural Art Does our bridge “qualify” as structural art?

Structural Art Park within a structure? Is the bridge honest with us? Does it accurately convey the forces of the bridge?

Does it Matter? Utilitarian purpose of a bridge- to get people and goods from here to there, in cars, trucks, bicycles or whatever. Aesthetic and symbolic- to make these crossings meaningful to participants and also to distant observers in boats, on river embankments, in neighboring buildings

“Change is not worthwhile unless it shows improvement” -President Woodrow Wilson