OpenADE November 17, 2011 PM2 David Mollerstuen, OpenADE TF Chair Steve Van Ausdall, OpenADE TF Vice-Chair.

Slides:



Advertisements
Similar presentations
Electrical Energy Pricing Working Group Develop a price message format based upon the FIX protocol FIX Protocol Ltd. North American Energy Standards Board.
Advertisements

GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
Green Button Initiative GREEN BUTTON DOWNLOAD MY DATA CERTIFICATION DRY RUN Marty Burns, for NIST August 6, 2013.
SG-Systems Boot Camp Use Case Process with TOGAF AMI-ENT Example Kay Stefferud Chair, SG-Systems Use Cases For more information visit:
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
Digital Living Network Alliance: Building out the Digital Network Bob Taylor Member, DLNA Board of Directors March 2006.
UCAIug HAN SRS v2.0 Summary August 12, Scope of HAN SRS in the NIST conceptual model.
Slide 1 UCAIug OpenSG OpenADE Automated Data Exchange Requirements NAESB ESPI Energy Services Provider Interface Standard Specification Overview November.
Weekly OpenADE Meeting Notes Tuesday, January 14, 2014.
What is Green Button All About? Making metered data available to consumers. All electric users have meters that are used to measure how much energy.
NAESB REQ.21 Update Dr. Martin J. Burns, Hypertek Inc. for NIST February 21, 2014.
Slide 1 UCAIug OpenSG OpenADE Automated Data Exchange Requirements NAESB ESPI Energy Services Provider Interface Standard Specification Overview.
OpenFMB Specification Development Plan
California Public Utilities Commission Sub Meter Protocol Workshop George Bellino Project Engineer Infrastructure Commercialization 27 Oct 2011.
Business Technology Solutions B usiness T echnology S olutions Smart Grid Program Consumers Energy’s focus on Using and Enhancing Industry Standards.
OpenFMB Specification Development Plan
The UN Disability Convention Equality and Human Rights Commission Engagement with disabled people and disabled people’s organisations.
The future of interoperability for ILL and resource sharing by Clare Mackeigan Relais International.
CIM Users Group Intro and Benefits Ralph Mackiewicz Chair, Marketing Subcommittee UCA International Users Group October 2007 Austin, TX
PTCS Service Provider Review 0 Background RTF assumed responsibility for maintaining PTCS specifications in March 2003  Developed PTCS Service Provider.
SMART METER TEXAS Status Update July 29, AGENDA Release 1 Smart Meter Texas Online Portal Update – SMT Solution Update – Registration Statistics.
John McDonald 05 November 2013 SGIP Members Meeting.
October 27, 2011 CONFIDENTIAL © 2011 Better Place CPUC Submetering Workshop EVSP Coalition Recommendations.
PAP 10 UCAIug OpenSG Customer Domain Involvement.
Post 2012 Energy Efficiency Planning Schedule: Options and Implications February 16, am - 5 pm CPUC Auditorium.
Green Button Initiative GREEN BUTTON DOWNLOAD MY DATA CERTIFICATION DRY RUN Marty Burns, John Teeter for NIST, Kay Clinard UCAIug.
OpenADE Knoxville Meeting February 27 – March 1, 2012 David Mollerstuen, OpenADE TF Chair Steve Van Ausdall, OpenADE TF Vice-Chair.
OpenADE: Roadmap, ITCA, Sample Implementation November 2, 2010 David Mollerstuen, OpenADE TF Co-Chair Steve Van Ausdall, OpenADE TF Co-Chair.
Follow us on: TAMU Jobs Online System Upgrade Presented to HR Liaison Network Fall Meeting 2012 October 31, 2012.
NIST Priority Action Plan 9 Demand Response and Distributed Energy Resource Signal Semantics Meeting Presentation to Energy Interoperation.
NSDI Strategic Plan Update FGDC Coordination Group Meeting September 10, 2013.
OpenSG Closing Plenary Knoxville February, UCAIug IPR Policy UCAIug Public or Private Documents may or may not contain the information included.
Weekly OpenADE Meeting Notes Tuesday, January 07, 2014.
May 2010 Slide 1 Submission Title: OpenSG Tysons Corner OpenADE Boot Camp Source: OpenADE Task Force Abstract: SG Systems OpenADE Task Force Boot Camp.
OpenSG Status UCAIug Members Meeting Chris Knudsen – Chair Gary Stuebing – Vice-Chair November 9 th, 2009.
Smart Grid Interoperability Panel & ISO / RTO Council Smart Grid Projects David Forfia SGIP Governing Board Member – Stakeholder Category 21 ISO/RTO Sponsor.
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
COMPLYING WITH THE UN CONVENTION ON THE RIGHTS OF PERSONS WITH DISABILITIES.
OpenADE: Agenda, SGIP PAP10, NAESB ESPI November 2, 2010 David Mollerstuen, OpenADE TF Co-Chair Steve Van Ausdall, OpenADE TF Co-Chair.
Dec UtilityAMI OpenHAN TF Requirements Working Group Specification Briefing January 2008.
Jackie Voss Manager, Global Standards Development ATIS All-IP Transition Initiatives September 30, 2015.
NAESB Smart Grid Standards Task Force PAP10 Discussion William Cox —
OpenADE: OpenADE, ESPI, OpenADE 2.0 Scope November 2, 2010 David Mollerstuen, OpenADE TF Co-Chair Steve Van Ausdall, OpenADE TF Co-Chair.
California Public Utilities Commission CPUC Climate Change Activities Paul Clanon Executive Director August 28, 2007 Presentation to the Senate Energy,
IEC TC57 Smart Grid Activities Scott Neumann USNC TA IEC TC57 November 6, 2009.
Southend Together Secretariat 21 st February Developing Southend Together’s Sustainable Community Strategy
ISO Current status of development ​ ​ ISO development process ​1​1.
OpenHAN TF Meeting Where do we go next? Erich W. Gunther.
BUCS Football Regional Advisory Group. Regional Advisory Group In order to create a clear structure and system to effectively develop and share best practice.
SG-Systems Working Group Status: Active, meet once at each face-to-face meeting Charter: The SG-Systems Working Group defines requirements, policies, and.
Open Smart Grid (OpenSG) Technical Committee Plenary October 20, 2009.
Assessment of Student Learning: Phase III OSU-Okmulgee’s Evidence of Student Learning.
March 2011 Slide 1 Submission Title: OpenSG San Francisco OpenADE Boot Camp Source: OpenADE Task Force Abstract: SG Systems OpenADE Task Force Boot Camp.
Requirements and Selection Process for RADIUS Crypto-Agility December 5, 2007 David B. Nelson IETF 70 Vancouver, BC.
“SG-Systems” ( Smart Grid – Operational Applications Integration ) Charter & Status Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
Current and future work of the Adaptation Committee in the area of adaptation technologies Workshop on technologies for adaptation Bonn, Germany, 4 March.
Section 4.9 Work Group Members Kris Hafner, Chair, Board Member Rob Kondziolka, MAC Chair Maury Galbraith, WIRAB Shelley Longmuir, Governance Committee.
Update from the United States Standards and Conformity Assessment Work in the Sub Committee on Standards and Conformance.
Open SG and SG-Systems Overview for IEC TC57 Working Groups For further information, contact: Greg Robinson Convener of IEC.
Standards Development for Climate Change  Consensus reached between UNFCCC & ISO that internationally accepted standards will be promoted globally  Include.
Recommendations for the 2017 Budget Process April 18, 2016 Presenters: Mike Mayes – Director, Financial Services/Treasurer Wanda Bennett – Director, Corporate.
SCE Plug-In Electric (PEV) Smart Charging Pilot DRMEC Meeting May 10-11, SCE Internal Use Only.
ISO 37001: Anti-Bribery Management Systems Standard
Direct Participation Enrollment Process for 2017 DRAM
IMFO WORKSHOP RT : Where to from here?
Consolidated EIM Initiatives from 2017 Roadmap Issue Paper
EE Third-Party Solicitation Process Workshop Solicitation Alignment
IMFO WORKSHOP RT : Where to from here?
“SG-Systems” (Smart Grid – Operational Applications Integration) Charter & Status Brent Hodges, Chair, SG-Systems Greg Robinson, Co-Chair, SG-Systems.
Presentation transcript:

OpenADE November 17, 2011 PM2 David Mollerstuen, OpenADE TF Chair Steve Van Ausdall, OpenADE TF Vice-Chair

Roadmap November 2011 (Austin, TX) OpenADE – NAESB ESPI 1.0 ratified Oct. 17 OpenADE – Discussions around ITCA, ability to certify, test plan and profiles OpenADE - Focus on reducing barriers to adoption, facilitate early simple implementations (“Green Button”)

Roadmap March 2012 (Bay Area) OpenADE – Full ESPI test plan complete OpenADE – ITCA operational OpenADE – OpenADE 1.1 requirements complete / submit to NAESB (PEV sub-meter)

Roadmap June 2012 (Chicago) Ability to certify implementations November 2012 (Hawaii)

SSO ITCA Stakeholder Community Test LabImpl. OpenADE Requirements Marketing Develop Test Plan Follow ISO Verify products against Test Plan UCAIug Manage Certification Program Ensure ISO 65 compliance NAESB Develop Standard Specification (ESPI) Protect copyrights Develop product Engage Test House to perform test ESPI Certification Roles Certification Body Issue Certificate Follow ISO 65

Certification Actions Funding Opportunity guidance by mid-December – testing and certification services (James) Test Plan - Complete ESPI Green Button profile and test plan by mid-January (Steve & team) Certification Plan – resources, funding, budget, options, requirements, labs, CBs, schedule by mid- December (collaboration – address IPRM items)

Certification Actions Funding Opportunity guidance by mid- December – testing and certification services Test Plan - Complete ESPI Green Button profile and test plan by mid-January

Future Requirements Extensibility Compression PEV sub-metering Price / DRLC Text Message

Extensibility Current specification contains – Allows additions without schema change New use cases – Advertise capabilities (resources available) – Negotiate desired extensions – Allow for extensions to use schema If using EXI, allows minimal encoding for extensions

Compression (and Encoding) Current specification does not limit – Beyond media type “ application/atom+xml ” – HTTP defines compression mechanics Accept-Encoding, Content-Encoding New use cases – Specify recommended encoding / compression compress, gzip, deflate, EXI

PEV sub-metering Delivery from DMA to Utility via ESPI in scope. – Comms between sub-meter and DMA (Data Management Agent / Third Party) out of scope. Sub-meter to premises meter association – Is currently possible by allowing selection during authorization, or association afterward – However, OAuth may not always be an option

PEV sub-meter Use Case 1, Scenario 1

PEV sub-meter Use Case 1, Scenario 3

PEV sub-meter CPUC protocol by September 2012 Contact to get

Price, DRLC Defined in IEC CIM, refined in SEP 2.0 Capabilities include the following – Communication of upcoming price intervals – Block thresholds, relative price levels (TOU) and actual commodity price – DRLC events specify cooling and heating offsets or set points, duty cycle and target reductions, etc.

Text Messages Defined in IEC CIM, refined in SEP 2.0 Supports simple text notices Could be enhanced to support other formats

Other Suggestions White paper on differences and similarities – OpenADR – OpenADE / ESPI / green button – OpenHAN / SEP 2.0 – ASHRAE 201