Dcs meeting, CERN, Mar 13  14, 2006 1 HV Control box HV Box from Athens Kai Schweda, University of Heidelberg P. Mantzaridis, A. Markouizos, P. Mitseas,

Slides:



Advertisements
Similar presentations
TRD-DCS Workshop, Zentrum für Technologietransfer und Telekommunikation FH-Worms FeeCommunication Chain Status of the FeeCom.
Advertisements

Zentrum für Technologietransfer und Telekommunikation FH-Worms FeeCommunication Chain Status of the FeeCom software Benjamin Schockert.
Zentrum für Technologietransfer und Telekommunikation FH-Worms FeeCommunication Chain Status of theFedServer Benjamin Schockert Sebastian.
ALICE DCS, Heidelberg 8 Sept G. De Cataldo, CERN CH and INFN Bari;A. Franco INFN Bari 1 Updating on the HV control systems in ALICE The DELPHI HV,
The Detector Control System – FERO related issues
TPC electronics meeting, /14 Zentrum für Technologietransfer und Telekommunikation FH-Worms FeeCommunication Chain Status.
Sezione di Bari September 16, 2002D. Elia - DCS workshop / ALICE week 1 SPD PS system and Controls Domenico Elia, INFN-Bari.
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
Peter Chochula, January 31, 2006  Motivation for this meeting: Get together experts from different fields See what do we know See what is missing See.
1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo,
David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 How to power up the TRD David Emschermann Physikalisches Institut Universität Heidelberg updated.
HV for SM surface testing 2 nd Workshop on the Detector Control System for TRD University of Tsukuba Kengo Watanabe.
Normal text - click to edit FeeServer: (version 0.9.2) ( ) S. Bablok (IFT, University of Bergen)
The ALICE TRD - HVDistribution System A. Markouizos, P. Mantzaridis, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis, M. Vassiliou Athens University ALICE.
TRD dcs workshop, Heidelberg, Jan 22, TRD Feeserver/controlEngine Kai Schweda, University of Heidelberg R. Bramm, B. Doenigus, T. Dietel, D. Emschermann,
1 Integration of the HV Distribution System to the First TRD Super Module P. Mantzaridis, A. Markouizos, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis,
Clara Gaspar, May 2010 The LHCb Run Control System An Integrated and Homogeneous Control System.
Marc R. StockmeierDCS, KIP ALICE WEEK FALL 2003 TRD DCS Status ● DCS-board status ● Poweresupply ●
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
1 DCS TDR Key technical points & milestones TB 15 Dec 2003 L.Jirdén.
Normal text - click to edit RCU – DCS system in ALICE RCU design, prototyping and test results (TPC & PHOS) Johan Alme.
DCS Detector Control System Hardware Dirk Gottschalk Volker Kiworra Volker Lindenstruth Vojtech Petracek Marc Stockmeier Heinz Tilsner Chair of Computer.
MDT PS DCS for ATLAS Eleni Mountricha
1 ALICE Control System ready for LHC operation ICALEPCS 16 Oct 2007 L.Jirdén On behalf of the ALICE Controls Team CERN Geneva.
DCS workshop CERN, Mar 5, 2007 Kai Schweda 1 TRD Status Kai Schweda, University of Heidelberg B. Doenigus, J. de Cuveland, T. Dietel, D. Emschermann, M.
Development and Performance of the High Voltage Distribution System for the ALICE TRD A. Markouizos, P. Mantzaridis, P. Mitseas, A. Petridis, S. Potirakis,
Clara Gaspar, October 2011 The LHCb Experiment Control System: On the path to full automation.
S.Sergeev (JINR). Tracker consists of  4 chambers of 4 views each In total ~7200 drift tubes (~450 per view) To be controlled/monitored  HV system.
Performance Tests and Control for the TRD-HV A. Markouizos, A. Petridis, S. Potirakis, M. Tsilis, M. Vassiliou Athens University ALICE DCS Workshop CERN.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
1 Responsibilities & Planning DCS WS L.Jirdén.
D etector C ontrol S ystem ALICE DCS workshop G. De Cataldo CERN-CH, A. Franco INFN Bari, I 1 Finite State Machines (FSM) for the ALICE DCS:
TPC Prototype III TPC module anode HV edge LV module analog digital Cool sensor Gas sensor Shift Expert DCS Ch Skirt.
DCS workshop July 2007 Overview Installed detectors Installed detectors FMD3 commissioning FMD3 commissioning FSM Hierarchy FSM Hierarchy LV+HV FSMs LV+HV.
P. Chochula ALICE Week Colmar, June 21, 2004 Status of FED developments.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
Bernardo Mota (CERN PH/ED) 17/05/04ALICE TPC Meeting Progress on the RCU Prototyping Bernardo Mota CERN PH/ED Overview Architecture Trigger and Clock Distribution.
Registers are always 32 bit / 4 byte memory is accessed directly when memory cannot be accessed kind of flag is on.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
Communication Layers Protocol Commands Results Command Specs Command Framework Database Access PVSS Server TOC ,
PHOS APD Bias Control Goal: To develop software for the PHOS APD bias control that uses the agreed ALICE standards for detctor control and coniguration.
Status of InterCommunication on FeeControl Meeting Report Communication between DCS-Layers State of Sebastian Bablok Christian Kofler Ralf Keidel.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
CF 16/Feb/20031 H8 Beam Test in 2003 ─ Preparation status TGC-Japan electronics group.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
DCS overview - L.Jirdén1 ALICE ECS/DCS – project overview strategy and status L.Jirden u Organization u DCS system overview u Implementation.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
13-Mar-061 ACORDE DCS ACORDE GROUP CINVESTAV, ICN-UNAM, MICHOACAN. PUEBLA México.
UF/PNPI POWER SUPPLY SOFTWARE By Magnus Hov Lieng
DCS for TRD Pre-trigger Ken Oyama Jan. 22, 2007 DCS Workshop in Heidelberg.
The DCS Databases Peter Chochula. 31/05/2005Peter Chochula 2 Outline PVSS basics (boring topic but useful if one wants to understand the DCS data flow)
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
S.Sergeev (JINR). Tracker consists of  4 stations of 4 views (planes) each In total ~7200 drift tubes (~450 per view) To be controlled/monitored 
CONFIGURATION OF FERO IN ALICE Peter Chochula 7 th DCS Workshop, June 16, 2003.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
Summary of TPC/TRD/DCS/ECS/DAQ meeting on FERO configuration CERN,January 31 st 2006 Peter Chochula.
Marc R. StockmeierDCS-meeting, CERN DCS status ● DCS overview ● Implementation ● Examples – DCS board.
Handling online information in the LHCb experiment
TPC Detector Control System
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

dcs meeting, CERN, Mar 13  14, HV Control box HV Box from Athens Kai Schweda, University of Heidelberg P. Mantzaridis, A. Markouizos, P. Mitseas, M. Petridis, A. Petridis, S. Potirakis, M. Tsilis, M. Vassiliou T. Dietel, D. Emschermann, J. Mercado, K. Oyama, M. Stockmeier

dcs meeting, CERN, Mar 13  14, Anode Voltage Distribution System (6-ch. Card / Top View and Auxiliary Power Supply Box)

dcs meeting, CERN, Mar 13  14,

4

5

6 Summary Visit at KIP (Feb ) - Positive Voltages (2000 V) 6 channels successfully tested - Full Command access through CAN (and serial interface) - First PVSS FSM functions + error handling available To do - Provide negative voltages (-3000 V), 1 st prototype end of April - Software regulation w/ 16 bit  ~5mV Goal - Full test of 1 st SM equipment at HD/KIP (end of May)

dcs meeting, CERN, Mar 13  14, TRD DCS  Status Kai Schweda, University of Heidelberg R. Bramm, T. Dietel, M. Kessenbrock, C. Lippmann, J. Mercado, K. Oyama, B. Schockert, M. Stockmeier

dcs meeting, CERN, Mar 13  14, Layer Architecture FED Server FEE Client InterCom Layer Config. DB PVSS (DIM - Client) #1 User: 1 PVSS FinalState #2 Intermediate: 1 InterCom + DB #3 540 DCS boards 8(6) ROBs each: ControlEngine / FeeServer FEE Server Command Coder B. SchockertT. Dietel, R. BrammM. Kessenbrock, K. Oyama V. Angelov C. Lippmann J. Mercado K. Oyama K.S. M. Stockmeier J. Mercado, G. Tsiledakis

dcs meeting, CERN, Mar 13  14, Monitoring Configuration: 65k*30kBytes, 1/run Number of time bins: 1 parameter, 1/run Clock frequency: 65k, 1/run Dead-channels: during run/data stream ? ADC-thresholds: 65k, 1/run MCM-temperatures: 65k/, > 1/min Gas-temperatures: 4*30*18 channels > 1/min HV: 18*6*4, > 1/min Q: What DataBase(s) to use ?

dcs meeting, CERN, Mar 13  14, Summary ControlEngine/FeeServer - functions (check scsn + readout-tree; config, monitor) implemented DataBase, InterComLayer: ready to use Command-Coder: available next 4 weeks PVSS FSM: just started Goal - Full test on ~200 DCS boards (TPC) at CERN (end of May) - Hand-dover to dcs/CERN: end of June 2006 Q: Code maintenance at CERN 24/7 by TRD experts Q: DataBase update at CERN 24/7 by TRD experts