Fundamental review of entry charging principles UNC Transmission Workstream - 6 th August 2009.

Slides:



Advertisements
Similar presentations
UK Gas Entry Regime – Review of existing Interruptible Arrangements & Potential Reforms for this Winter.
Advertisements

Review of NTS entry charge setting arrangements - IA 1 July 2010.
NTS Exit (Flat) Capacity Charges – Credit Arrangements (UNC TPD V3.3.4) Simon Trivella – 14 th January 2009 Distribution Workstream.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Long Term Entry Capacity & User Commitment Transmission Workstream 7 th August 2008.
Discretionary Release Interruptible Entry Capacity 1st November 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Markus Krug, Co-Chair CEER Workstream 20 th Madrid Forum 26 September 2011 Harmonised transmission tariff structures Framework Guideline.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
GRI NW Investment Workshop Chris Logue, European Policy Manager, 4 th June 2010 The Hague.
Transfer & Trades Special Transmission Workstream
The Entry Capacity Transfer & Trade Methodology Statement Transmission Workstream
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Review of the UNC Post-emergency Arrangements Workshop 1 March 2009.
Review Group 291 – Balancing Arrangements Default Cashout Workshop 3 – 21 st June 2010.
Flow Variations at Entry Transmission Workstream Martin Watson 1 st November 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
Gas Emergency Arrangements Proposal Transmission Workstream 5 th April 2007.
1 Allocation of Baseline Reduction in the Substitution Methodology Draft Presentation aimed for 11 th June Substitution Workstream John Baldwin Gas Strategies.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
Update on Entry Capacity Substitution Transmission Workstream 6 th March 2008 Summary of consultation responses.
Operating Margins UNC Sub Group Tuesday 2nd December 2008.
Entry Capacity Substitution Workshop 2 7 th May 2008 Substitution Example.
Force Majeure - Capacity Transmission Workstream 2 July 2009.
Ofgem Open Letter – Next Steps Transmission Workstream
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Review of Entry Capacity and the Appropriate Allocation of Financial Risk Review Group th Sept 2008.
Initial Thoughts on the Release of Non Obligated NTS System Entry Capacity Transmission Workstream 3 rd April 2008.
Optimisation of Entry Capacity Strawman Transmission Workstream 4 th May 2006.
Entry Capacity Substitution Workshop 3 11 th June 2008 Substitution Example.
September 2008 QSEC auction - Allocations Transmission Workstream
The calculation of the NTS Optional Commodity tariff (NTS Shorthaul) in the Enduring Exit Period Richard Hounslea/Debra Hawkin National Grid NTS, Gas Charging.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Review Group -140 Thoughts on additional information requirements.
Trades and Transfers Workshop, 6 th November 2007.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Transfers and Trades Special Transmission Workstream
Alternative Approach to Enduring Exit Flat Capacity & Revenue Recovery Gas TCMF 14 th December 2006.
The Entry Capacity Substitution Regime Transmission Workstream 7 th February 2008 Thoughts for discussion.
Entry Capacity Overrun price calculation
Transmission Workstream, 01 October 2009
Background and Process
Transmission Workstream, 2nd March 06
UNC Trader User – Licence obligations
Capacity Methodology Statements: Impact of Mod 452
Exit Overruns in the Enduring Regime - draft MOD principles
NTS Entry Charging Review Update
0291 – NTS Licence Special Condition 27 – Balancing Arrangements
Mod 0452 (PARCA) – Further thoughts
Exit Capacity Substitution and Revision
Transmission Workgroup June 7th 2012
Development of Entry Capacity Substitution
UNC Transmission Workstream 7th December 2006
Entry Overrun Calculation
Transmission Workstream – 6th July 2005
Modification Proposal 0133 – “Introduction of AMTSEC auction”
Ofgem presentation to Gas Transmission Workstream
Review Group 221: Review of Questions from Session 2
195AV “Future work” – system flexibility
Incremental Entry Capacity Release Methodology Statement
Presentation transcript:

Fundamental review of entry charging principles UNC Transmission Workstream - 6 th August 2009

2 Introduction  National Grid is launching a fundamental review of entry charging principles.  This is in response to growing industry concern about the increasing rate of the TO entry commodity charge.

3 Background (1): Summary of Entry Experience Early Experiences ( )  Bidding behaviour for entry capacity auctions resulted in significant over recovery  This may have been due to; northern constraints and competition for St Fergus capacity, and limited experience of entry auctions  This resulted in charging methodology proposals that looked at resolving over recovery and reducing entry capacity floor/reserve prices.

4 Background (2): Summary of Entry Experience Recent Experiences ( Present)  Over recent years, auctions have resulted in under recovery, other than when a constraint became material in the Easington area.  This may be due to; Increased experience of auctions and lack of locational competition for capacity Increased certainty of capacity availability associated with baselines Profiling of capacity across the year The clearing obligation and zero reserve prices  This has resulted in the introduction of the TO Commodity Charge and its increasing rate over the years

5 Background (3): Shipper Concerns with the Prevailing Charging Structure Shippers have an incentive to ‘wait and see’ due to entry capacity price discounts on day ahead (33%) and within day (100%) auctions. Shortfall in recovery of revenues by National Grid through entry charges is picked up through the Commodity Charge paid by all shippers.  This means that short term capacity buyers are having their costs paid by shippers who have previously paid the longer term rate for capacity.  It could be argued that this creates: cross subsidies between shippers who buy long term rather than short term cross subsidies between shippers who buy firm rather than interruptible effectively creates firm capacity from interruptible if firm capacity remains unsold. potential undue discrimination for new entry points which have no access to zero priced capacity as there are no short term auctions.

6 Fundamental review required  All of the above would suggest it is time to make changes and a number of potential solutions have been proposed e.g:  Remove day ahead and on the day discounts  Introduce different commodity rates depending on the price paid for capacity  Reduce the relative price of long term capacity  However as we have seen, with the constraint at Easington, it is possible to quickly move from under to over recovery.  Therefore we need to take a measured but timely approach, otherwise we could simply lurch from under to over recovery

7 Fundamental review – what does this mean?

8 Initial Analysis 2008/09 (FY) – TO Entry Revenue  National Grid has started to analyse the existing and future potential usage / bookings at entry points: Draft information for discussion purposes only

9 Initial Analysis 2009/10 (FY) – TO Entry Revenue (forecast) Draft information for discussion purposes only

10 Initial Analysis 2008/09 (FY) – TO Revenue by ASEP Draft information for discussion purposes only

11 Initial Analysis 2008/09 (FY) – St. Fergus Draft information for discussion purposes only

12 Initial Analysis 2008/09 (FY) - Easington Draft information for discussion purposes only

13 Initial Analysis 2008/09 (FY) - Bacton

14 First thoughts  Not sure how many issues are generic – may be demand only?  Therefore most analysis will need to be undertaken at an entry point / sub terminal level  Obviously at an entry point level we may quickly reach issues of confidentiality  Views?  Other data worth analysing?

15 Charging Objectives In addition to the Licence obligations in relation to setting charges, what other factors should be taken into account?  Encourage long term bookings  Maximise use of existing entry points  Recover TO revenue through capacity rather than commodity charges  Other….. Which is the most important?

16 Process Going Forward An entry charging review leading to revised NTS Entry Capacity charging arrangements may require  NTS Charging Methodology changes  Licence changes  UNC modifications Initial discussions have taken place at the Gas Transmission Charging Methodologies Forum (Gas TCMF) which normally meets following the UNC Transmission Workstream National Grid invites views on the process for taking these issues forward. Options include:  Continue within the Gas TCMF?  Raise a UNC Review Proposal?  Organise separate workshops?  Other?