Hi-Lumi Conductor Procurement A.Ballarino, B. Bordini, L. Oberli HL-LHC/LARP International Review of Superconducting Cable for the HL-LHC Inner Triplets.

Slides:



Advertisements
Similar presentations
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Advertisements

school program selections. Available September 4 thru 7, 2012.
Chubaka Producciones Presenta :.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
11 T Dipole informal coil and assembly readiness review Long coil and fabrication tooling development status and plans September 22 nd, 2013 – F. Savary.
MQXF RRP® Strand for Q1/Q3 A. K. Ghosh MQXF Conductor Review November 5-6, 2014 CERN.
Thoughts about the MQXF development plan P. Fessia Thanks to discussions within the MDT section (P. Ferracin, J. C. Perez, E. Todesco, P. Ferracin), L.
ATF2 quads status 22Nov05- Cherrill Spencer 1 Status Report on the Design and Fabrication of 29 quads for ATF2 By Cherrill Spencer, SLAC, for ILC-BDS weekly.
F. Savary. Click here to add footer 2 Outline Context Constraints & Boundary conditions Project plan Production strategy A few words on QA Conclusions.
Title – xxxx 1 LARP & US-HiLumi Contribution to the Inner Triplet Quadrupoles G. Ambrosio Cost and Schedule Review CERN, March 9 th -11 th 2015.
Quality assurance of the QXF- Q2 Nb 3 Sn cable mass production C. Scheuerlein, 6 November 2014 HL-LHC/LARP International Review of the Superconducting.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
11 T Dipole Informal Coil and Assembly Readiness Review CERN September 2013 Review committee: Herman Ten Kate CERN (Chair) Fred Nobrega FNAL Davide.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Outline: Main characteristics of the FRESCA2 cable Main characteristics of the strand Strand stability, an issue to avoid magnet quench at low field Procurement.
MQXF Q1/Q3 Conductor Procurement A. K. Ghosh MQXF Conductor Review November 5-6, 2014 CERN.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Conductor Review Oct 16-17, 2013LARP Strand :Specs. Procurement, Measurement- A. Ghosh1 LARP Strand: Specifications, Procurement and Measurement Plans.
E. Todesco OUTPUT OF THE CABLE REVIEW E. Todesco and the QXF team CERN, Geneva Switzerland CERN, 10 th December 2014 QXF design review, CERN.
Outline: Strand R&D and strand procurement and inventory. Main parameters of the cable without a core. Results obtained during the cable development without.
A. BallarinoLASA, Milano,18/09/2012 High-Tc Superconducting Link Status of Task 7.5 FP7 Meeting at LASA-Milano A.Ballarino, CERN for the Task 7.5 Collaboration.
A. BallarinoEucard, 8 th WP7 HFM Annual MeetingWarsaw,24/04/2012 High-Tc Superconducting Link Status of Task 7.5 Eucard 2012, 8 th WP7 HFM Collaboration.
5 th Joint Hi-Lumi LHC-LARP Annual Meeting 2015 Cold Powering New Baseline A.Ballarino 27/10/2015.
11 T Dipole Project CERN Status M. Karppinen 11 T Management meeting 1 July 2013.
24 Th January Status of the Conductor Development Status of the manufacturing for Alstom Status of the manufacturing for SMI L. Oberli.
MQXF Short model and prototype plans P. Ferracin, G. Ambrosio HL-LHC/LARP International Review of the MQXF Design December 10-12, 2014 CERN.
HL-LHC/LARP Cable Review, CERN, Nov Lessons Learnt in LARP- A. Ghosh 1 Lessons Learnt from LARP experience Arup. K. Ghosh HL-LHC/LARP International.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
HiLumi-LARP Annual Meeting November 2014 MQXF pre-series and series magnets fabrication plans Ruben Carcagno November 19,
29 th September 2009 EuCARD-WP7 HFM Conductor specification and procurement Luc OBERLI CERN, TE-MSC-SCD.
Logo area 11 T Wire: Procurement Strategy and QA/QC B. Bordini, A. Ballarino, M. Macchini Acknowledgments: thanks to E. Charifoullina for her contribution.
TF Fabrication Progress is being made on TF bundle fabrication activities but the schedule remains tight. All 24 outer conductors have been machined but.
Answers to the review committee G. Ambrosio, B.Bordini, P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
LARP Collaboration Meeting 15 Nov 1-3, 2010 A2C- Materials Working Group Arup Ghosh (coordinator), Emanuela Barzi, Dan Cheng, Dan Dietderich, Soren Prestemon,
LARP Collaboration Meeting 15 Nov 1-3, 2010 Conductor Procurement and Qualification Arup K. Ghosh (BNL) bnl - fnal- lbnl - slac US LHC Accelerator Research.
DOE Review, 6/2/2011Answers to Committee Questions – Magnet Systems Answers to committee questions - magnets.
CERN QXF Conductor Procurement and Cable R&D A.Ballarino, B. Bordini and L. Oberli CERN, TE-MSC-SCD LARP Meeting, Napa, 9 April 2013.
Procurement of Nb 3 Sn strand, cable fabrication, and quality control for the U.S. Hi-Lumi LHC Accelerator Upgrade Project Lance Cooley, Fermilab L3 manager.
P. Ferracin on behalf of the MQXF collaboration
Lessons learnt from CERN experience
Solenoidal magnet. The status of manufacture, forthcoming works
11 T Dipole Integration & Plans M. Karppinen
CSP 25th November 2010 Technical agreement number 3: overview
MQXF Goals & Plans G. Ambrosio MQXF Conductor Review
CERN Conductor and Cable Development for the 11T Dipole
(Procurement, testing of magnets)
CEA KE 2775 progress meeting WP3 – FRESCA 2 Magnet
SIS100 quadrupole status S. Kostromin, H. Khodzhibagiyan, G. Trubnikov, FAIR 11th MAC, GSI, May,
MQXF Short Models Status and Plans
Procurement of Nb3Sn strand for coils assembled at CERN
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
MQXF updates P. Ferracin October 9th, 2014.
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
13-block rotation schedule
McDonald’s Kalender 2009.
FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule
2300 (11PM) September 21 Blue line is meridian..
McDonald’s calendar 2007.
February 2007 Note: Source:.
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
McDonald’s calendar 2007.
PLAYMATES LEARNING CENTER CALENDAR
Globus-M2 will be constructed by the end of 2015
Habitat Changes and Fish Migration
2015 January February March April May June July August September
Habitat Changes and Fish Migration
Presentation transcript:

Hi-Lumi Conductor Procurement A.Ballarino, B. Bordini, L. Oberli HL-LHC/LARP International Review of Superconducting Cable for the HL-LHC Inner Triplets Quadrupoles (MQXF ) A.Ballarino, TE-MSC-SCD 6 th November 2014

A.BallarinoHL-LHC/LARP International Review, CERN, 05/11/2014 Outline  Quantity of conductor procured  Procurement of wire for series production  Cable production plan

A.BallarinoHL-LHC/LARP International Review, CERN, 05/11/2014 Conductor for MQXF quadrupole  Double sourcing Procurement of PIT and RRP  Nb 3 Sn wire  Needed: ( ) km of RRP  ( ) km of PIT 1500 km (8.4 tons) in total  Procured: 1000 km (4.54 tons) of RRP (+ option for 500 km) 1000 km (4.54 tons) of PIT (+ option for 500 km)  The option enables to act in case of problems from one supplier

A.BallarinoHL-LHC/LARP International Review, CERN, 05/11/2014 Procurement –Nb 3 Sn Wire Procurement strategy as presented at the Hi-Lumi/LARP Conductor Internal Review, CERN, October 2013 Procured Ordered Planned Short Model Program Planned Long Prototypes Cabling trials: 5+5 km SMP: km SMP: km LP: km 2017 Conductor for series 6+6 SMCs 6+6 LMCs 5+5 SMCs (May 2015)

A.BallarinoHL-LHC/LARP International Review, CERN, 05/11/2014 Procured Ordered Planned Short Model Program Planned Long Prototypes Cabling trials: 5+5 km SMP: km SMP: km LP: km 2017 Conductor for series 6+6 SMCs 6+6 LMCs 5+5 SMCs (May 2015) Procurement – Nb 3 Sn Wire Ordered in February 2014 Received Internal Process Launched IT Committee 7 th Nov FC March 2015

A.BallarinoHL-LHC/LARP International Review, CERN, 05/11/2014 Short Models (UL = 400 m) 5 km (RRP 132/169) + 5 km (PIT 192) – Cabling trials 45 kg delivered from December 2012 to March km (RRP 132/169) + 35 km (PIT 192) 318 kg delivered from November 2013 to October km (RRP 132/169) + 20 km (PIT 192) 182 kg to be delivered in the first trimester 2015 Nb 3 Sn Wire for MQXF Prototype Program 545 kg of Nb 3 Sn for MQXF ordered Long Models (UL = 800 m) 200 km (RRP) km (PIT) 1.8 ton to be delivered in 2016 (18 months) Tot = 2.35 tons of Nb 3 Sn for MQXF Prototype Program

A.BallarinoHL-LHC/LARP International Review, CERN, 05/11/2014 Procurement of Nb 3 Sn Short Model Program Long Prototypes km km km km 2017 Series 6+6 SMCs 6+6 LMCs 5+5 SMCs km 45 coils 2020

A.BallarinoHL-LHC/LARP International Review, CERN, 05/11/2014 Strand delivery and cable production FC March 2016 Adjudication of contracts Wire delivery (series) Jan 2017-September 2019 Cabling activity April 2017-December 2019 Coil winding Jan 2018-Nov 2020 Cables ready for insulation Oct 2017-Sept Preparation (IT Committee,…) Delivery 200 km +200 km Options

A.BallarinoHL-LHC/LARP International Review, CERN, 05/11/2014 Wire delivery (32+32) km in Jan 2017 (32+32) after 4 months (43+43) km after 3 months (80+80) km every 3 months (96+96) km every 3 months Maximum delivery rate  100 km (450 kg) every 3 months

A.BallarinoHL-LHC/LARP International Review, CERN, 05/11/2014 Wire delivery and cables production - Series Delivered to magnet team: 2 months before coils assembly (for electrical insulation) Available: availability of cables according to wire delivery schedule Series (32 coils) Oct 2017 Dec 2017 March 2020

A.BallarinoHL-LHC/LARP International Review, CERN, 05/11/2014 Wire delivery and cables production - Series Delivered to magnet team: 2 months before coils assembly (for electrical insulation) Cables ready for characterization : 3 months before delivery to magnet team Available: availability of cables according to wire delivery schedule July 2017 Dec 2019

A.BallarinoHL-LHC/LARP International Review, CERN, 05/11/2014 Cables production - Series Delivered to magnet team: 2 months before coils assembly (for electrical insulation) Cables ready for characterization : 3 months before delivery to magnet team Available: availability of cables according to wire delivery schedule Max cable production rate: 2 cabling runs/month Buffer of 4 cables March 2020 Series December 2019 Series December 2019 August 2019 Series

A.BallarinoHL-LHC/LARP International Review, CERN, 05/11/2014 Cables production - Series

A.BallarinoHL-LHC/LARP International Review, CERN, 05/11/2014  Total quantity: 45 cables to be produced during 3 years – 32 for series production  From April 2017 till December 2017: production of cables for earlier deliveries plus buffer of 4 fully qualified cables – to compensate for unforeseen stop of production (cabling machine, QC equipment, delay in measurements…)  Cable production rate: one cable every two weeks. Three months have been taken into account for measurements before delivery of cables for coils winding Cable production

A.BallarinoHL-LHC/LARP International Review, CERN, 05/11/2014 Conclusions  A wire procurement strategy has been established in accordance with requirements for cable production  A cable production plan has been established in accordance with requirements for coils assembly  Cabling activity will be performed at CERN. Production of unit lengths of cables will be launched sufficiently early to assure cables need for coils assembly – also in case of late delivery from one wire manufacturer - and availability of a buffer of cables