Objective 22.01 Explain major factors to consider in planning new construction or repair work.

Slides:



Advertisements
Similar presentations
Agricultural Robotics Project
Advertisements

Construction Accounting & Financial Management, 3/e Steven Peterson © 2013 by Pearson Higher Education, Inc Upper Saddle River, New Jersey All Rights.
The Contents. 1. Cyber Hull 2. Cyber Hull Inventory.
Farming Case Studies Extensive UK :Hill Sheep Farming in the Lake District Intensive Commercial EU: Market Gardening in the Netherlands.
Parallelogram Inventor Assembly and analysis. Create a project.
Project Diary Missouri Local Programs How to Develop and Use the Daily Diary and Payment Diary for LPA Inspectors.
Triangular Graphs LEARNING OBJECTIVES 1.To be able to construct a triangular graph 2.To be able to describe, explain and analyse a triangular graph.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Chapter 30 Final Inspection, Contract Closing, and Project Transfer.
Environmental Protection and Workplace Diversity Job.
Key Skills: Application of Numbers Presented by Bill Haining.
Biotechnology and agriculture In technology. Agriculture the production of food and goods through farming.
Planning Considerations in planning are: –Function or Usefulness: is it needed? –Kind of Wood: Depends on function and finish used. –Size & Proportion:
Name: Date: Counting Up to Make Change 1 DO NOT subtract to find the answer. Use change to find the answer. Example: 1)Count up, using coins, from the.
32a. Percentage of projected employment change, by industry, (Wage-and-salary workers)
constructions Construct a triangle PQR having PQ = 7 cm,  RPQ = 30 º and  PQR = 57 ºTask:  Draw a rough sketch of the triangle. Making a Rough Sketch:
1.2Points, Line and Planes 1.3 Measuring Segments.
Basic Sound System Designing Jess Role RPLB 378 Mission College.
Contract Specifications Written Set of standards and procedures informing the contractors or remediation professionals of materials & operation necessary.
Now that I built it, How much did it Cost?
JOB ORDER CONTRACTING (JOC) Things to Consider When Making the Choice to Utilize JOC Services.
K – What do you know about Magna Carta? W – What would you like to learn about the English Bill of Rights? L – Explain one of the Principles of Government.
1 Labour Data in the Agricultural Census Roundtable Meeting on Programme for the 2010 Round of Censuses of Agriculture Budapest, Hungary, November,
Poncho Shelters.
ZDC CRANE PROJECT Y. Onel September 28, Progress since last meeting Our Mock-up is found at CERN, inspected by CERN Engineering and found satisfactory.
Keith Roberts, P.E. Project Implementation Engineer IDOT – District 9.
Final Accounts. Accounts Submissions Last Bill for Contracted Works ( excluding Retention) Presented at Practical Completion Practical Definition dependant.
Surface Area and Volume Challenge Construct two 3-Dimensional Figures given large sheets of construction paper: – One that has the largest possible Surface.
Insurance 101 Personal Finance. Learning Goal To be able to define terms relating to insurance.
Agriculture Mechanics as a Profession Mechanics A branch of physics that deals with motion and the action of forces on bodies.
Plan Cost Effective Construction and Drawings
Ag Eng I UNIT G: CARPENTRY. Grades of Lumber and Plywood A. Hardwood or Softwood 1. Hardwood comes from deciduous trees such as oak, birch, walnut, maple,
Lesson 6:Planning a Woodworking Project Curtis Borne, Ph.D. Assignment #2.
Best 20 jobs jobs sites.
Levels of Industry. Level 1- Agricultural Agriculture, fishing, mining Natural resources Raw materials gathered Level 2 - Manufacturing Construction,
Careers in Agriculture Chapter 2 Ag. Mechanics I Mr. Herren.
Word Problem Comprehension 1-2 By Tracy Ortiz October 8, 2013.
מהפכות באנגליה.
English for Engineering Management ( 1 ) Detail 1-1 Fill out the missing words on the drawing (5 are missing) Where is the detail located on the building?
Lesson 6: Planning a Woodworking Project
Graphing Direct Relationships
LIFE IN THE FUTURE.
Sketching the Derivative
Services Transportation Construction Retail Finance Wholesale -5.2%
هجرة الشباب الدولية والتنمية الفرص والتحديات
Windmill Project Research wind mills and complete a powerpoint using the quidelines provided. Research the TSA design criteria for the Tech Day at the.
12.6 Segment Relationships in Circles
در تجزیه و تحلیل شغل باید به 3 سوال اساسی پاسخ دهیم Job analysis تعریف کارشکافی، مطالعه و ثبت جنبه های مشخص و اساسی هر یک از مشاغل عبارتست از مراحلی.
= Models, Equations, & Explanation
Describing job requirements and experience
31a. Percentage of projected employment change, by industry,
Transformations of curves
Symbolism.
Graph of the derived function
STRAW MODELING GUIDELINES
12.6 Segment Relationships in Circles
Chapter Seven Constructions and Scale Drawings


Four seasons T T P 2012.
Chapter Seven Construction and Scale Drawings
Resources in Construction / Plant

Curve Sketching: Sketching
Panama.
Name as many geometrical constructions as you can and explain where they are located on the picture. Bell-work.
Cooperstown Farmers’ Market
Lesson 6: Planning a Woodworking Project
Coordinates Picture For each instruction, join up the coordinates.
Coordinates Picture For each instruction, join up the coordinates.
Presentation transcript:

Objective Explain major factors to consider in planning new construction or repair work

Planning Construction Before starting new construction or repair jobs of any size, a plan, sketch or drawing should be made Reduces cost Saves time Improve quality Determine material needs

Planning Construction The best way to guarantee high quality materials and workmanship in construction projects is to include specifications in plans and contracts

Planning Construction Time to be completed is a major consideration in planning agriculture construction or repairs because of the seasonal nature of farming The cost of a project is an important factor in planning construction A bill of materials is an itemized list of materials and their costs.