PEP- II Linac Accelerator Systems Department PEP-II Overview and Future Plans John Seeman SLAC Particle and Particle-Astrophysics DOE PEP-II Operations.

Slides:



Advertisements
Similar presentations
New Radiation Safety Interlock System for the SPring-8 Accelerator Complex C. Saji, M. Toko, T. Matsushita, R. Furuta, H. Hanaki, S. Hashimoto 1), Y. Hashimoto,
Advertisements

Henrik Loos LCLS FAC Meeting 27 October RF Gun Status LCLS Facility Advisory Committee Meeting October 26, 2005 Mechanical.
FACET: A National User Facility Carsten Hast SLAC National Accelerator Laboratory.
1 PEP Status M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 6 Summary.
PEP-II Ramp Down to a Minimum Maintenance State J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
PEP- II Linac Accelerator Systems Department The PEP-II B-Factory Accelerator John T. Seeman Assistant Director Particle and Particle-Astrophysics Division.
PEP-II B Factory Machine Status and Upgrades John T. Seeman for the PEP-II Staff SLAC DOE Site Review April 9, 2003.
February 19, 2008 FACET Review 1 Lab Overview and Future Onsite Facilities Persis S. Drell DirectorSLAC.
1 IR Vacuum M. Sullivan MAC Review Jan , 2006 M. Sullivan for the Machine Advisory Committee Review January 18-20, 2006 IR Vacuum.
1 Super-B Factory Scenarios John Seeman Assistant Director PPA Directorate SLAC SLUO Meeting September 11, 2006.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
Accelerator Systems Division FACET Project Management John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
Safety Oversight for SLAC Accelerator Department Operations
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
PEP-II Status and Outlook John T. Seeman For the PEP-II Team SLAC EPAC Meeting June 12, 2003.
PEP-II and BaBar DND Review M. Sullivan Mar 23-24, 2009Page 1 PEP-II Overview and MMS Status Michael Sullivan SLAC National Accelerator Laboratory.
PEP- II Linac Accelerator Systems Department The PEP-II Overview John Seeman SLAC Particle and Particle-Astrophysics Directorate PEP-II MAC Review January.
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
PEP-II Overview & Ramp Down Plan J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
SLAC Accelerator Department The PEP-II Accelerator Status and General Plans John T. Seeman Assistant Director of the Technical Division Head of the Accelerator.
SLAC Accelerator Department PEP-II Future Plans and Parameters John T. Seeman PEP-II MAC Meeting December 13, 2004.
Accelerator Systems Division FACET Accelerator Overview John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
Accelerator Operations and Efficiency Presentation by Roger Erickson SLAC Operations Review SLAC, June 15-16, 2004.
Future Very High Luminosity Options for PEP-II John T. Seeman For the PEP-II Team e+e- Factories Workshop October 13-16, 2003.
SLAC Accelerator Department PEP-II Super-B-Factory Collider John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department.
1 BROOKHAVEN SCIENCE ASSOCIATES Preparations for Linac Commissioning Ray Fliller, Associate Physicist 8 th ASAC meeting for NSLS-II Project May 10-11,
John Seeman LCLS December 2, Conduct of LCLS Accelerator Operations John Seeman Assistant Director LCLS Directorate.
PEP-II Operational Safety and Management Presentation by Roger Erickson B-Factory Operations Review SLAC, April 26, 2006.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
ASTA roadmap to EPICS and other upgrades Remote monitoring and control DAQ Machine protection Dark current energy spectrometer.
PEP-II Machine Advisory Committee Meeting SLAC, April 15-17, 2004 HOM Issues in LER Ring and IR. Recent measurements and calculations. Sasha Novokhatski.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
26-October-2006 PEP-II MAC Session HOM measurement and analysis S. Weathersby, A. Novokhatski HOMs in LER region 4: overview, history Collimator wake fields.
Luminosity expectations for the first years of CLIC operation CTC MJ.
July 7, 2008SLAC Annual Program ReviewPage 1 PEP-II in Run 7 and Transition Planning John T. Seeman Assistant Director PPA/LCLS.
1 IR Vacuum M. Sullivan MAC Review Oct , 2006 M. Sullivan for the PEP-II team Machine Advisory Committee Review October 25-27, 2006 IR Vacuum Update.
HERA Operation 2004 M. Bieler, -MPY- PRC, Mai Performance Improvements in Remaining Problems - Improvement Program - Schedule 2004.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
FACET User Support Carsten Hast Accelerator Research Division Test Facilities Department
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
SABER, “maybe” a new facility in the South Arc (South Arc Beam Experimental Region) End Station A (ESA) in 2007 ILC Test Beams in 2008 Test Beams beyond.
Program Risks Risk Analysis Fallback Plans for the PEP-II B-Factory John T. Seeman DOE PEP-II Operations Review April 26, 2006.
SLAC Accelerator Department B-Factory Operations and Plans John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
D&D Review 6 August PEP-II Minimal Maintenance State Upkeep Stan Ecklund (J. Seeman, S. DeBarger, D. Kharakh, M. Zurawel)
PEP-II Reliability and Uptime Roger Erickson 13 October 2003 With thanks to C.W. Allen, W. Colocho, P. Schuh, M. Stanek, and the Operations staff members.
1 Run7 startup M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 7 Startup.
9 October 2003S. DeBarger PEP-II Vacuum Status PEP-II Machine Advisory Committee.
The machine status and operating mechanism of BEPCII CAO, Jianshe Institute of High Energy Physics, CAS April 16, 2013 The 4th Accelerator.
TDR and R&D Plans J. Seeman and M. Biagini For Super-B Staff.
Synchrotron Radiation Absorption and Vacuum Issues in the IR at PEP-II and a Higgs Factory John Seeman, SLAC October 11, 2014 HF2014 Beijing.
Mini MAC II PEP-II hardware M. Sullivan Apr 23-24, 2009Page 1 PEP-II Hardware Status M. Sullivan SLAC National Accelerator Laboratory Mini-MAC II Frascati,
PEP- II Linac Accelerator Systems Department Status and Plans for PEP-II John Seeman SLAC Particle and Particle-Astrophysics DOE HEPAP P5 Review April.
November 12-13, 2007 Super-B Factory: Accelerator Costing, PEP-II Hardware and Schedule J. Seeman SLAC International Review Committee meeting November.
PEP-II Status John Seeman SLAC Particle and Particle-Astrophysics
John T. Seeman DOE PEP-II Operations Review April 26, 2006
SuperB Injection, RF stations, Vibration and Operations
Michael Sullivan and John Seeman SLAC National Accelerator Laboratory
Top-Up Injection for PEP-II and Applications to a Higgs Factory
PEP-II RF System Status and Upgrades
PEP-II Status and Plans e+e- Factories Workshop
Interaction Region Design Options e+e- Factories Workshop
Advanced Research Electron Accelerator Laboratory
Accelerator R&D Results from the B-factory
J. Seeman Assistant Director for PPA/LCLS
FACET Accelerator Overview
Summary of Washington DOE Review
LCLS Operation in 2009 Roger A. Erickson
Presentation transcript:

PEP- II Linac Accelerator Systems Department PEP-II Overview and Future Plans John Seeman SLAC Particle and Particle-Astrophysics DOE PEP-II Operations Review April 26, 2006

PEP- II Linac Accelerator Systems Department Topics Mission Operations organization, safety and planning Brief PEP-II collider status PEP-II future upgrades and status PEP-II luminosity projections Conclusions

PEP- II Linac Accelerator Systems Department SLAC’s Mission To provide a respectful and safe environment to promote research. To operate, maintain and upgrade all SLAC accelerator systems to maximize their high energy physics output. To develop the conceptual framework and technology needed for the next generation of accelerators and to advance the science of accelerator physics. To manage the construction and commissioning of new accelerator systems. To contribute to the development of the technology needed for the next generation of detectors. To provide Laboratory support and services in the areas of our scientific engineering and technical expertise. To perform the research and development necessary to accomplish our mission effectively.

PEP- II Linac Accelerator Systems Department

PEP- II Linac Accelerator Systems Department

PEP- II Linac Accelerator Systems Department

PEP- II Linac Accelerator Systems Department Other TD Departments contributing to PEP-II Mechanical Design Mechanical Fabrication (MFD) Electronics and Software Engineering (CPE) –Power supplies, diagnostics, RF and controls Metrology –Alignment and magnetic measurements Site Engineering and Maintenance (CEF) –Power, water and buildings Advanced Computation (ACD) –Wakefield and HOM calculations Klystron –Klystron production and RF Accelerator Research (ARDA and ACD) –Accelerator theory and bunch feedback

PEP- II Linac Accelerator Systems Department Citizen Committees and Subject Matter Experts Safety Overview Radiation Safety Non-Ionizing Radiation Safety Hazardous Experimental Equipment ALARA Electrical Safety Earthquake Safety Fire Protection Safety Hoisting and Rigging Safety Environmental Safety Radiation Safety Officer Laser Safety Officer Electrical Safety Officer Fire Marshal Crane Inspector ESH Environmental Protection Department ESH OSHA Experts ESH Industrial Hygienists Emergency Management Coordinator

PEP- II Linac Accelerator Systems Department Current Accelerator Program The PEP-II B-Factory provides high energy physics data to the BaBar detector running about 10 months per year. –Upgrade plan is to increase the peak luminosity by a factor of about 2 over the next few years. Linac beams are provided to other programs using linac pulses not used by PEP-II injection. –The linac runs at 30 Hz. PEP-II uses, on average, only about 10 to 15 Hz.

PEP- II Linac Accelerator Systems Department PEP-II Scheduling PEP-II Accelerator Run Planning is done with: –Laboratory Director (J. Dorfan) –Particle and Particle-Astrophysics Directorate (P. Drell) –Assistant Director of PPA for Accelerator Systems (J. Seeman) –PEP-II Run Coordinator (U. Wienands) –BaBar Spokesman (D. MacFarlane) –BaBar Technical Coordinator (W. Wisniewski) –BaBar Run Coordinators (J. McKenna, G. Bonneaud ) –Technical staff –Power Manager (G. Loew) –Operations Group Head (R. Erickson) –Spokespersons of other small experiments.

PEP- II Linac Accelerator Systems Department Scheduling Committee

PEP- II Linac Accelerator Systems Department Scheduling Committee Scheduling Committee members: J. Seeman (chair), R. Erickson (operations), C. Field (test beams), J. Weisend (CEF), W. Wisniewski (BaBar), R. Hettel (SPEAR3), P. Pianetta (SSRL), D. Schultz (LCLS), R. M. Boyce (LCLS installation) Meets every few months as needed. Propose running schedule to the Directorate Provides power requirements versus month.

PEP- II Linac Accelerator Systems Department Accelerator Schedule

PEP- II Linac Accelerator Systems Department Internal PEP-II Reviews and Meetings Daily (seven days) 8:00 am Program meeting Daily (seven days) 8:15 am BaBar/PEP-II meeting Five days/week Maintenance meetings (8:15 am) Twice/week PEP-II Group meetings Weekly Tech Division Construction Project reviews Weekly PEP-II / BaBar Strategy Meeting Semi-monthly PEP-II Evaluation Meeting with Upper SLAC Management Weekly Shut-Down Planning meetings starting three to five months before the down, continuing during the down. PEP-II End of Run “Lessons Learned Briefings”PEP-II 2e34 working committee (weekly)

PEP- II Linac Accelerator Systems Department External PEP-II Reviews Annual DOE Site Visits Annual DOE Program Reviews Semi-annual Scientific Policy Committee Semi-annual Experimental Physics Advisory Committee Semi-annual BaBar International Finance Committee Quarterly BaBar Collaboration meetings PEP-II Machine Advisory Committee –1) Jan 4-6, 1995 –2) August 24-25, 1995 –3) April 11-13, 1996 –4) January 6-8, 1997 –5) November 10-13, 1997 –6) December 14-16, 1998 –7) October 9-11, 2003 –8) April 15-17, 2004 –9) December 13-15, 2004 –10) January 16-18, 2006

PEP- II Linac Accelerator Systems Department Documentation Hierarchy

PEP- II Linac Accelerator Systems Department Accelerator Department Safety and Operations Documents Accelerator Operations BAS Key and Lock ProceduresHot Sheet Accelerator Operations BAS InstructionsIncident Response Procedures Alarm Response ProceduresLaser Safety Procedures Arcs PPS LogLinac etc Building Emergency Plan Beam Containment System ProceduresLinac PPS Log BSOIC Certification Checklists Logging Requirement for Work… BSY PPS LogMCC Building Manager Checklists CID PPS LogMCC Emergency Plan DRIP/DR PPS LogMCC Key Safe Checkout Electrical Hazard Test ProceduresPEP PPS Log Emergency Notification FormPEP PPS Overview Entry and Exit ProceduresPLS Keys Procedures and Log Equipment Checkout LogPositron PPS Log ESA PPS LogPPS Interlock Checklists FFTB PPS LogPPS Zone Maps Final Focus PPS LogSafety Configuration Control Fire Alarm System Reference ManualSafety Inspection Checklists Guidelines for Work in SLAC Accelerator HousingsSearch Procedures Gun Test Lab Safety Procedure VVS Remote Turn-on Procedure High Voltage Test Facility Safety ProceduresWarning Response Procedures

PEP- II Linac Accelerator Systems Department ARTEMIS (Maintenance ) ARTEMIS (Accelerator Remedy Trouble Entry and Maintenance Information System) is an Oracle database with a Remedy interface, accessible over the internet by everyone involved with SLAC accelerator maintenance. Operators report problems as they occur by making entries in ARTEMIS. Repair work is launched immediately if the problem is inhibiting the scheduled accelerator program. New ARTEMIS entries are reviewed at the daily maintenance meeting. Open questions are addressed and jobs are assigned. Jobs may be assigned to the Standby Maintenance List (SML), or to the Repair Opportunity Day (ROD) list, or marked for the next long down time. Jobs are tracked using ARTEMIS until they are finally closed.

PEP- II Linac Accelerator Systems Department ARTEMIS Example

PEP- II Linac Accelerator Systems Department General In-depth Accelerator Self-Assessments by SLAC 2005 PEP-II collider 2004: ‘Linac’ (includes DRs, BSY, ESA) 2003: GTL, GTF, HVTF, ASTA 2002: SPEAR 2001: NLCTA 2000: PEP II collider 1999: ‘Linac’

PEP- II Linac Accelerator Systems Department The PEP-II Team Accelerator Systems Division SLAC Support Groups BaBar LBNL ILC Machine Advisory Committee 1x10 34

PEP- II Linac Accelerator Systems Department Beam Lines

PEP- II Linac Accelerator Systems Department PEP-II e + e - Collider Overview BaBar Detector

PEP- II Linac Accelerator Systems Department The PEP-II e + e - asymmetric collider

PEP- II Linac Accelerator Systems Department PEP-II RF Cavities

PEP- II Linac Accelerator Systems Department PEP-II Interaction Region Components near BaBar HER LER Collision point BaBar

PEP- II Linac Accelerator Systems Department How the beams enter and exit the PEP-II Interaction Region

PEP- II Linac Accelerator Systems Department PEP-II Long Term Run Schedule Run 5b: November 2005-July 2006 Down: August-November 2006 –(Major upgrades for PEP-II & BaBar + LCLS installation) Run 6:December 2006-August 2007 Down:September-November 2007 –(PEP-II one month + LCLS installation) Run 7: December 2007-September 2008.

PEP- II Linac Accelerator Systems Department B-Factory Overall Parameters ParameterPEP-II (LER/HER) Circumference (m)2200 Beam energy (GeV)3.1/9.0 Number of bunches1732 Beam currents (A)2.9/1.7 Horizontal emittance (nm)30/45  y * (mm)10/11  y 0.065/0.045 IP beam sizes (microns) (x/y)120/4 Luminosity (x /cm 2 /s)10.0

PEP- II Linac Accelerator Systems Department PEP-II’s best day in Run 5b April 25, 2006 LER current Luminosity HER current

PEP- II Linac Accelerator Systems Department

PEP- II Linac Accelerator Systems Department FY2005 Run Performance (Stanek)

PEP- II Linac Accelerator Systems Department FY2006 Run Performance (Stanek)

PEP- II Linac Accelerator Systems Department PEP-II Luminosity Integration

PEP- II Linac Accelerator Systems Department Luminosity: Run 5 April Fall down Vacuum issues P5 MAC Ecklund

PEP- II Linac Accelerator Systems Department Sullivan

PEP- II Linac Accelerator Systems Department PEP-II Progress since October 2005 Installation down (Oct 10-Nov 15). –One new IR chamber –Improved IR NEG pumps –Position monitor upgrades –Abort window spoiler –Safety upgrades. –IP dither feedback coils Turned on November 15. Luminosity rose quickly and reached 0.86 x /cm 2 /s in mid-December. Successfully ran PEP-II through the year-end holidays Two vacuum issues game up in December 2005.

PEP- II Linac Accelerator Systems Department PEP-II Machine Advisory Committee Meeting: January 18-20, 2006 –Members: D. Rice (chair), J. Corlett, K. Harkay, S. Henderson, I. Koop, J. Marriner, K. Oide, D. Rice, D. Rubin, L. Bertolini, F. Pedersen, P. Raimondi, F. Zimmermann, Report available. Words from report: –Impressive progress in all areas since the last the review a year before. –Congratulates achievement of luminosity (3.3 x design). –Trickle charge injection is very effective. –Accelerator plan is sound for optimizing the collider productivity though FY2008 –Vacuum burst studies are being intensely investigated. [Committee made several suggests what to look for.] –Suggest re-examine increasing the specific luminosity.

PEP- II Linac Accelerator Systems Department Two Vacuum Issues in December 2005 Two major vacuum problems developed in the month of December limiting the peak luminosity to about ~0.5 x /cm 2 /s: –Gap ring (RF seal) problem near LER RF cavity caused e + beam instability –Higher Order Mode absorbing bellows caused vacuum bursts in IR The first problem was quickly identified (~ 2 weeks) and solved in late January. The second problem was thoroughly investigated, replacement parts manufactured, and repaired in late March with elapsed time of about three months.

PEP- II Linac Accelerator Systems Department LER Current in Run 5 Fall down Vacuum issues 2.95 A

PEP- II Linac Accelerator Systems Department Location of the First Vacuum Problem Vacuum spike area RF seal installation procedure problem

PEP- II Linac Accelerator Systems Department Second Vacuum Event: BaBar Background Trip Vacuum Spikes

PEP- II Linac Accelerator Systems Department December 25, 2005 High LER+HER Current Causes Radiation Trips  Clear current threshold

PEP- II Linac Accelerator Systems Department PEP-II Task Force Structure addressed the issue April 2006

PEP- II Linac Accelerator Systems Department IP Vacuum Issue Resources Help from many groups: PEP-II, BaBar, Material Science Group, Klystron Dept., High Power RF Group, Vacuum Dept., Pulsed Kicker Group, and LBNL. Many studies done: –Beam current thresholds –Beam instability identification –External leak checks –Transient leak checks during spikes –Gas pressure profiles –Gas pressure flow rates –Gas injections (puffs) (He, N2, Air) (various locations) –Transient gas analysis during spikes –NEG pump heating to make H2 gas –Background timing with BaBar –Borescoped 100 m of vacuum chamber (several times) –Replaced RF seals and four vacuum chambers –SiC-AlN HOM tile lab tests and thermal calculations This vacuum problem was the most subtle and hard to diagnose problem PEP-II has had. However, we solved it in a timely way over two months with a strong team. In the end as will be shown later, the chamber at fault was anticipated to be a long term problem and was scheduled to be replaced in Fall 2006 (AIP project). (The problem came 6 months too early!)

PEP- II Linac Accelerator Systems Department

PEP- II Linac Accelerator Systems Department LER Forward Q4 Location

PEP- II Linac Accelerator Systems Department

PEP- II Linac Accelerator Systems Department “Discharge” on Absorbing Tile SiC/AlN HOM Tile Cu heat sinkArc siteRF seal fingers

PEP- II Linac Accelerator Systems Department New RF seal to correct problem: New seat on Cu base not tile N. Kurita

PEP- II Linac Accelerator Systems Department New HOM bellows design for Fall 2006 Tiles behind Fingers N. Kurita Novokhatski Weathersby April 2006

PEP- II Linac Accelerator Systems Department Recent Run Results Vacuum work April 24, 2006

PEP- II Linac Accelerator Systems Department Delivered luminosity matches prediction since March 1. Prediction date Vacuum work FFTB Removal April 25, 2005

PEP- II Linac Accelerator Systems Department PEP-II Overall Parameters and Goals ParameterUnitsDesignPresent best 2007 goal I+mA I-mA Number bunches y*y* mm Bunch length mm yy Luminosityx Int lumi / day pb Five times design Over three times design

PEP- II Linac Accelerator Systems Department Integrated Luminosity Projection March 1, down 2007 down Now

PEP- II Linac Accelerator Systems Department PEP-II Upgrades Goal: A factor of two in PEP-II luminosity (1  2 x10 34 /cm 2 /s) will come from: –Increasing each beam current by 40%. –Lowering  y * from 11 to 8.5 mm giving 30%. –Increasing the beam-beam parameters by 10%. –Keeping detector backgrounds at the predicted levels. –Maintaining (and improving) accelerator reliability.

PEP- II Linac Accelerator Systems Department Upgrade Planning and Execution The items to upgrade PEP-II have been identified by the PEP-II Task Forces. Engineering has been done on most items and these items are in manufacturing. A few items are in final design review to start manufacturing in about one month. Funding is in place for all PEP-II items. Detailed time planning for the fall down has started with every task being identified with loading for the various shops. Interferences with BaBar and LCLS are being worked out months in advance to minimize problems.

PEP- II Linac Accelerator Systems Department Many of the new vacuum chambers for higher current are near the IP Dots show new vacuum chamber locations. Done March 2006 Done October 2005 Recent problem bellows

PEP- II Linac Accelerator Systems Department Accelerator Improvement Projects on track for Fall 2006 X-Y BPM upgrades New HER Q5 vacuum chambers New HER/LER Q2 chambers2006 HER-10 RF station2006 HER-11 RF station2006 HER power supply upgrade for higher tunes2006 New HER Q4 vacuum chambers2006 New IR2 Q2 bellows2006 LER IR HOM absorber2006 HER IR HOM absorber2006 LER BPM monitor upgrade2006 LER new high power bellows2006 LER NEG vacuum chamber upgrade2006 New Longitudinal feedback processor2006 Cost of AIP projects is about 7 M$ spread over FY2006 and FY2007. PEP-II AIP expenditures from averaged about 5 M$ each year.

PEP- II Linac Accelerator Systems Department B-Factory RF Klystrons (1.2 MW) under construction

PEP- II Linac Accelerator Systems Department RF Cavity Production Cavity bowls welded together Ports to be welded Finished cavity

PEP- II Linac Accelerator Systems Department Example: HER QF5R Chamber (Fall 2006) Specifications Design Construction R. Pope

PEP- II Linac Accelerator Systems Department LER/HER Q2 IR Vacuum Chamber (Fall 2006  March 2006) High power separation chamber Thermal analysis of synchrotron radiation power (~100 W/cm) NEG Vacuum Pump S. Metcalfe

PEP- II Linac Accelerator Systems Department PEP-II Accelerator Technology for Future Accelerators High beam currents –World record e + current (2.95 A) –World record e - current (1.75 A) –High power vacuum chamber design Large number of bunches –World record number of colliding bunches (1732) –Very fast and strong bunch-by-bunch feedbacks (4 nsec) –Electron Cloud Instability (ECI) cures (solenoids, antechambers) High power RF systems –>1.2 MW CW klystrons 476 MHz –High power Cu cavities (600 kW) Complex interaction region design with two rings PEP-II provides continued strong input into new accelerator designs: ILC damping rings, low emittance light sources (PETRA-3), Super-B Factories, LHC ECI, BEPC-II, …

PEP- II Linac Accelerator Systems Department PEP-II Conclusions PEP-II achieved a new luminosity level (1x10 34 ) in October 2005 and set several integrated luminosity records. Run 5b started well but two serious vacuum problems occurred keeping the luminosity peak to about half the former peak. Both vacuum problems have been identified with the help of many people and experiments and have been solved in a timely way. Over past two weeks, the luminosity has risen steadily to >0.84x10 34 with several 600+ pb -1 days. (663 pb -1 yesterday) Planned upgrades towards ~2  are on track. Run plans are in place with a target of ~1 ab -1 in We strongly believe that the combined performance of PEP-II and BaBar will remain competitive through We work daily to make SLAC and PEP-II safer and better. We have internal and external reviews of our program. We set yearly performance goals and track them daily-weekly-monthly-yearly. We perform regular in-depth safety reviews of all our accelerators. We are actively working to make our accelerator more reliable.