Questions From these four questions yielded the following cards… 1)Thinking of Facilities….What’s needed to create a “comfortable” learning environment?

Slides:



Advertisements
Similar presentations
CEFPI is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion of this.
Advertisements

Contents: Cover
SHORELINE SCHOOL DISTRICT Site & Facilities Assessment September 22, 2008 SHORECREST HIGH SCHOOL.
Tam Valley School Modernization - Phase 1 Summer 2011.
The Greenwood Apartments a partnership between Banc of America Community Development Corporation and Clearwater Neighborhood Housing Services, Inc.
DECEMBER 7, 2011 HOUSING DECISIONS. AGENDA Review Decision Making Model Vocabulary Marketing strategies that affect our spending Housing alternatives.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Guidelines and Required Codes That Affect Building Design
Department of Energy Energy Savers PowerPoint: Heating and Cooling 4 of 12.
Del Mar Union Schools Facilities Master Plan Update September 19, 2012.
Measure G Overview March 9, Measure G School Facility Improvement East Side Union High School District To provide greater security and safety, relieve.
Current Project Update October 25th 2012 Good Evening!!!
SANITARY DESIGN PRINCIPLES FOR FACILITIES. ZONES OF CONTROL.
Health and Safety Royal Bank Of Scotland. The Workplace How many people are expected to work in the room? Are the chairs suitable? What are the state.
Greening Existing Homes 5. What You Need to Know? Clients: Buyers need guidance on upgrade possibilities and valuing of green features. Sellers need green.
Glenbard Township High School District 87 Facility Master Plan Steering Committee July 20, 2011.
WANTS & NEEDS. Design Your Ideal Environment For Restrooms & Hallways HALLWAY SOUNDPROOF TOWEL DISPENSER OR AIR DRY & PROPERLY LOCATED AUTO AIR FRESHNER.
Copyright 2004 Foreman Architects Engineers School Security From Common Sense to High Tech.
MCPS MAINTENANCE AND CAPITAL IMPROVEMENTS 2015 – 2016 BUDGET.
J C Charyk Hanna School: Modernization. Timelines To Project Completion The timelines shared are proposed to date and may change slightly as the project.
Natural GasElectricity Reduce energy demand Behavior changes Air sealing Insulation Landscaping and windows Use energy efficiently Heating and cooling.
WISH LISTS. GHS Install building wide phone system w/voic Remodel Office area w/AC Enlarge parking lot near LC Replace asbestos floor tile Pave gravel.
What is an Energy Audit ? Ramon Casado Adam Romano.
The ABCs of Facility Studies in the 21 st Century: It’s More Than Just Numbers Carol S. Cash, EdD, Clinical Associate Professor, Virginia Tech Travis W.
DST H.O.M.E. Home Ownership Maintenance and Education Property Maintenance: Protect Your Property Value.
Shop Safety and Conduct By: Mr. Beese. Safety In The Work Area Keep Work Area Clean Tools Put Away Fire Hazards can be avoided Shop Floor.
Stoughton Public Library Feasibility & Design Study Report by CBT January 28, 2011 Current Library Built in 1969Proposed Library for the Future.
PRISM Preparation Health and Safety Checklist. Area #1 Classrooms ☺ Dental hygiene ☺ Toy safety/storage ☺ Durability/condition ☺ Organization of space.
2012 Planned Facilities Reconstruction Project. Planned Facilities Reconstruction Health & Life Safety Energy Conservation & Management Security Upgrades.
Facilities Maintenance Department LtCol Todd A. Kerzie Facilities Maintenance Officer (760) 725 – 3807 Mr. Jeff Hunt Maintenance Control Director Marine.
ACOUSTICS (EF) WALL STRUCTURE FOR SOUNDPROO FING (EF) NOISE ABATEMENT (C) SPECIAL NEEDS STUDENTS EQUIPMENT (C) PROPERLY EQUIPPED WITH TEACHER RESOURCES.
MMSD Facility Assessment Outline Mission and Goals History –Building Construction Dates Facility Management Process –Previous 5 year Plan –Website –
High School Task Force DECATUR PUBLIC SCHOOLS 02/03/2009.
A presentation of The New Georgian Heights Alternative Elementary School for Columbus City Schools Board of Education 2 February 2010.
1 NEW FAIRFIELD FREE PUBLIC LIBRARY Renovation Project
©2009 Strang, Inc. Orchard Ridge United Church of Christ September 20, 2009.
Sinking Fund Millage Renewal Election- May 7, 2013.
Video Tour of Head Start Preschool Classroom +to+arrange+a+preschool+classroom&view= detail&mid= B69F8029C
Energy conservation strategies Buildings energy consumption depends on building envelop, efficiency of HVAC and lighting systems, amount of required fresh.
Wal-Mart Superstore in San Angelo Texas. Wal-Mart Threat Assessment Vandelism Theft of merchandise Theft of store supplies Illegal entry into facility.
Chapter 7 Developing a Center Facility ©2013 Cengage Learning. All Rights Reserved.
Facilities for a Quality Child Development Program Child Services II.
CASE STUDY: CHAPMAN GRADUATE SCHOOL OF BUSINESS IND 5615 – Building Systems for Interior Designers ASSIGNMENT 4 - PART I & II SEPTEMBER 7, 2010 FRANCINE.
Inspections. Structural Evaluation Look for any movement, check alignment, bowing, cracks, separation Basement wall/foundation Check floors & ceiling.
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS High School Building Project.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
Riley County – USD 378 Community Forum 2 23november2015 Riley County School District.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
Gates County Schools Maintenance Department Maintaining and Renovating Today’s Schools For Tomorrow’s Students.
FY2017-FY2026 GDRSD Capital Plan-June 22, 2016 Jared Stanton, Director of Business and Finance.
Facilities Focus Group
Cuba-Rushford CSD Capital Project
Bond Project Update September 2017
Vassar strong vision Inspire Future Excellence…Learn, Achieve, Succeed
JOHN A. HOLMES IMMEDIATE FACILITY NEEDS
Building Environmental Systems
Community Meeting, July 18, 2016 Update Designs and Phasing
Cornwall Central School District
Fall 2017 Update: Physical properties and sinking fund
Iron Forge Educational Center: U. S
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
Worcester Public Schools Study and Master Plan
SAFETY First.
2018 Bond Review and Proposal
Capital Outlay Workshop
Recent Bond Accomplishments
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
Stoughton Public Library
Dixon Middle School Project Update
The Edge Extreme Makeover.
Presentation transcript:

Questions From these four questions yielded the following cards… 1)Thinking of Facilities….What’s needed to create a “comfortable” learning environment? 2) Thinking of Facilities….What’s needed to create a “effective” learning environment? 3) Thinking of Facilities….What’s needed to create a “efficient” learning environment? 4) Thinking of Facilities….What’s needed to create a “safe” learning environment?

ACOUSTICS (EF) WALL STRUCTURE FOR SOUNDPROOFI NG (EFF) NOISE ABATEMENT (C) SPECIAL NEEDS STUDENTS EQUIPMENT (C) PROPERLY EQUIPPED WITH TEACHER RESOURCES (COPIERS, ACCESS TO LIBRARIES) ADEQUATE LEARNING TOOLS (TEXTBOOKS & OTHER MATERIALS (EFF) CLEAN, SANITARY, ENVIRONMENT – CONTAMINENT FREE (ASBESTOS, MOLD, RADON) (C) PROPER HEALTH CARE AREA (S) ADEQUATE RESTROOM FACILITY (S) ADEQUATE SPACE (C) FLOOR PLAN (EF) STORAGE (EF) SPACE TO STUDENT RATIO (S) ADEQUATE SPACE (C) ELIMINATE BASEMENT CLASSROOMS (C) ACCESSIBILITY TO CLASSROOMS (EFF) ROOFS (C) ROOF CONDITIONS (EFF) ROOFING (EF) DRUG FREE (S)ELECTRICAL SERVICE (EF) ADEQUATE FOOD SRVICE (C) SEPARATE LUNCH AREA (EF) ELECTRICAL SYSTEM UPDATE (S) CONFERENCIN G ABILITY (EF) MULTIPLE LEARNING SYSTEMS (EFF) BUILDING COMMUNICATIO N SYSTEMS (EFF) CURRENT (FOR THE TIME) TECHNOLOGY (EFF) CURRENT TECHNOLOGY (C) TECHNOLOGY (EF) MEANS OF COMMUNICATIO N (S) ADEQUATE & UP TO DATE ELECTRICAL WIRING (C) BANDWITH (EF) ELECTRONIC SURVEILLANCE (S) ADEQUATE POWER (EFF) Emergency Alert System (S) Legend: S – safe; EF – efficient; EFF – effective; C – comforable

CONSTANT ACCESS REVIEW & REPLACEMENT (EF) COLOR SCHEME OF INTERIOR (EFF) HANDICAP ACCESSIBILITY (S) ERGONOMIC FURNITURE © COMFORTABLE UPDATED FURNITURE (EFF) ADJUSTABLE SPACES (EF) FURNISHINGS (EF) ADEQUATE FOOD SRVICE (C) STORAGE (S) ARTWORK BOTH STUDENT AND PROFESSIONAL (C) AESTHETICS – WARM COLORS ENTERIOR/INTE RIOR – LANDSCAPTING (C) & (EFF) WELCOMING ENVIRONMENT (C) ASBESTOS REMOVAL (S) BEING GREEN (EF) ENVIRONMENT ALLY FRIENDLY(C) SUSTAINABLE DESIGN (EF) CLEAN FACILITIES (S) UV RAYS AIR QUALITY (EF) WINDOWS & DOORS (EF) UPGRADED WINDOWS (C) ENERGY (EF) ACOUSTICS (S) CARPET (C)SEPARATION OF GRADE LEVELS (EFF) ADEQUATE SPACE (EFF) ACCESSIBILITY FOR ALL (EF) ADEQUATE FOOD SRVICE (EFF) UPGRADE SIDEWALKS (S) ADEQUATE FOOD SRVICE (C) ATHLETIC RECREATIONAL & CULTURAL SPACE (EFF) FENCING (S) SAFE LARGE ASSEMBLY AREAS (S) SAFE & ACCESSIBLE PLAY EQUIPMENT (C) SAFE PLAYGROUND SPACES & EQUIPMENT (S) LOADING & UNLOADING BUS ZONES (S) PROPERLY LOCATED INGRESS & EGRESS ADEQUATE & PROPERLY LOCATED PARKING & TRAFFIC FLOW (EF) SAFE PARKING (C)

EMS (EF) GEOTHERMAL (EF) UPDATED EFFICIENT HVAC (EF) HEATING (EF) HVAC (C) COOLING (EF) SOLAR (EF) CLIMATE CONTROLS (S) CARBON MONOXIDE DETECTORS (S) AIR QUALITY (S) SECURITY (EFF) ADEQUATE FOOD SRVICE (EF) TRAFFIC CONTROL (S) FIRE SAFETY (S) SECURITY SYSTEMS (S) HAZ MAT AREA (S) DOORS (S) SENSE OF SECURITY (C) DOORS IN PODS THAT HAVE ABILTIY TO BE SECURED (C) STRUCTURALL Y SOUND (S) NATURAL LIGHTING (EFF) LIGHTING (EF) INTERIOR/ EXTERIOR LIGHTING (S) NATURAL LIGHTING (C) LIGHTING – CONSISTENT TYPE ILLUMINATION (C)