1 BROOKHAVEN SCIENCE ASSOCIATES 2009 DOE Accelerator Safety Workshop BNL S-band LINAC Fire Safety Concerns August 19, 2009 A. Ackerman.

Slides:



Advertisements
Similar presentations
ISO EMS OVERVIEW FOR CONTRACTORS
Advertisements

Radiopharmaceutical Production
[Organisation’s Title] Environmental Management System
New Radiation Safety Interlock System for the SPring-8 Accelerator Complex C. Saji, M. Toko, T. Matsushita, R. Furuta, H. Hanaki, S. Hashimoto 1), Y. Hashimoto,
1 BROOKHAVEN SCIENCE ASSOCIATES Environment, Safety and Health Steve Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting March 29, 2012.
Preparing for Power Outages Like any other part of the infrastructure, electrical power to the campus can fail, either as an isolated incident (e.g., tripped.
Accident Investigation Root Cause Analysis
FACILITY SAFETY: Creating a Safe and Secure Environment in the Community Health Center Presented by Steve Wilder, BA, CHSP, STS Sorensen, Wilder & Associates.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Shielding Workshop S. Buda Personnel Protective Systems March 27, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Presentation to ASAC R. Casey Radiation Shielding: Assumption and Design April 24, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Authorization Basis Steve Hoey, NSLS-II ESH Manager Project Advisory Committee February 8-9, 2011.
Determining the True Root Cause(s) of Accidents and Safety Incidents Incident Investigation and Analysis.
Take 5 for Safety E. Lessard May 5, LANL Electrical Accident May 3, 2015  LOS ALAMOS, N.M. —Los Alamos National Laboratory workers were injured.
Slide 1 FAA’s Special Technical Audit of Boeing and the Audit Resolution Plan.
Brookhaven Science Associates U.S. Department of Energy 1 Brookhaven National Laboratory Protocol Compliance Monitoring Darcy Mallon May 7, 2009.
© 2008 Prentice Hall11-1 Introduction to Project Management Chapter 11 Managing Project Execution Information Systems Project Management: A Process and.
Project Execution.
Safety and Loss Control
Plan for the summer Nobuhiro Terunuma, KEK ATF day: ATF Collaboration Meeting European Linear Collider Workshop ECFA LC2013, May 28,
Performance Metrics for EMS Self Assessment & Management Review 30 th Environmental and Energy Symposium & Exhibition April 5 – 8, 2004.
Incident Reporting Procedure
FY2010 PEMP Notable Outcomes October 15, FRA, LLC Board of Directors 10/15-16/2009 Office of Quality and Best Practices Performance Evaluation Management.
Basics of OHSAS Occupational Health & Safety Management System
WAO, Trieste, 24th - 28th September 2007 An Overview of the Reliability and the Fault Trends of the SRS Cheryl Hodgkinson Daresbury Laboratory Synchrotron.
1 BROOKHAVEN SCIENCE ASSOCIATES Authorization Basis Plan Steven Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting December 10 – 11, 2009.
Nov Readiness Review Course Implementation Plan - Mod 8 Screening or Scoping Meeting (ORR vs RA, Authorization Authority (AA) Defined, Startup Notification.
1. Objectives  Describe the responsibilities and procedures for reporting and investigating ◦ incidents / near-miss incidents ◦ spills, releases, ◦ injuries,
Brookhaven Science Associates Accelerator Safety Workshop Lessons Learned at C-AD Accelerators E. Lessard August 7-9, 2007.
Worker Focused Safety Program Violence in the Workplace Worker Training Module 5.
C A & Courtemanche & Associates HEALTHCARE SYNERGISTS.
Investigation of Accelerator Incidents – Regulatory Perspective Abdul Alwani Canadian Nuclear Safety Commission.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
Lecture 11 Managing Project Execution. Project Execution The phase of a project in which work towards direct achievement of the project’s objectives and.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
Electrical Fire in Terminal Room at Collider-Accelerator Department Relay-Fire Investigation Committee
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
1.  Mission: Improve and operate accelerators, support the experimental program, and design and construct new accelerator facilities in an environmentally.
SMS Planning.  Safety management addresses all of the operational activities of the entire organization.  The four (4) components of an SMS are: 1)
1 BROOKHAVEN SCIENCE ASSOCIATES Presentation to PAC R. Casey NSLS-II ESH Program Status May 25, 2007.
COMMISSIONING: REDUCING THE CARBON FOOTPRINT (…and Maintenance Costs) (…and Operating Costs)
1 BROOKHAVEN SCIENCE ASSOCIATES Redundancy Requirements for Critical Devices R. Casey August 8, 2007.
Information Security 14 October 2005 IT Security Unit Ministry of IT & Telecommunications.
ISO MONITORING AND MEASUREMENT. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be.
2009 DOE Accelerator Safety Workshop Summary of Presentations and Panels Closeout.
Internal Assessments at Argonne Accelerator Facilities S.W. Butala Presented at the DOE Accelerator Safety Workshop - BNL August 19, 2009.
HSS Inspection of Environment, Safety, and Health Programs at BNL Accelerator Safety Workshop E. Lessard Collider-Accelerator Department August 12-14,
Office of Human Research Protection Georgia Health Sciences University.
Incident Investigation New Mexico State Risk Management Loss Control Bureau and Law Offices of the Public Defender Loss Control Committee.
2010 Accelerator Safety Workshop August 18, 2010 Lessons Learned Breakout A. Ackerman.
Checking and Corrective Action EPA Regions 9 & 10 and The Federal Network for Sustainability 2005.
1 BROOKHAVEN SCIENCE ASSOCIATES Summary of Shielding Calculations for NSLS2 Accelerators P.K. Job Radiation Physicist Peer Review 2007 March
Energy Coal, HSEC, September 2009 ICAM : Oil Circuit Breaker Explosion Incident date: Saturday 5 th September, 2009 Before After.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
2007 Office of Risk Management Annual Conference 2007 David M. Shapiro Disaster Planning & Recovery Consultants
Chapter 3 PHYSICAL INJURY AND CONTROLS 3.2 Electrical Safety
Steve Griffith February 28th, 2017
Incident Reporting And Investigation Program
Technical Services: Unavailability Root Causes, Strategy and Limitations Data and presentation in collaboration with Ronan LEDRU and Luigi SERIO.
It’s all about the dpisd dr plan
Project Management Managing Project Execution
Goodyear Napanee Contractor Safety
Incident Reporting And Investigation Program
Safety and Security- From Assessment to Implementation
ATF 120 Hz Photocathode RF Gun Injection System Design Studies
Whose Job Is It? Responsibility for Laboratory Safety and Security
Radiopharmaceutical Production
Risk Management NDS Forum June 23rd 2010.
CR-GR-HSE-302 Management of change
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Presentation transcript:

1 BROOKHAVEN SCIENCE ASSOCIATES 2009 DOE Accelerator Safety Workshop BNL S-band LINAC Fire Safety Concerns August 19, 2009 A. Ackerman

2 BROOKHAVEN SCIENCE ASSOCIATES BNL S-Band Electron LINAC’s ‘S-Band’ Electron LINAC’s 2 – 4 GHz range Klystron Modulators contain a Pulsed Forming Network – supply high voltage & current pulse to klystron –Capacitors (store energy) –Inductors (shape the pulse; filters) –Thyratron (switch) –~150 lbs of plastic, oil, plastic insulated wire Four S-Band LINAC’s on site National Synchrotron Light Source (NSLS) Source Development Laboratory (SDL) Accelerator Test Facility (ATF) Laser Electron Accelerator Facility (LEAF) SLAC Design

3 BROOKHAVEN SCIENCE ASSOCIATES BNL S-Band LINAC’s Fire History Three significant capacitor fires NSLS: 1999; ~$95k loss SDL: 2003; ~$10k loss ATF: 2009; ~$100k loss Lessons from 1999 Too much combustible material Capacitors not well suited to application –Air bubbles develop; Dielectric fluid not well distributed; Arcing results in fire Difference between operation and arcing is subtle –Cannot prevent first arc, can discontinue power after the first event Capacitors do not need forced air cooling Need positive mechanism for power disruption (emergency stops)

4 BROOKHAVEN SCIENCE ASSOCIATES BNL S-Band LINAC’s Fire History Corrective actions from 1999 Use Glastic Maintenance program for capacitor; different model Arc detection Smoke detection Audio monitoring Emergency power shut off switches Response procedures No fire suppression –Minimize fire damage –Keep adequate replacement parts

5 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Test Facility (ATF; Bldg 820) Overview Accelerator Test Facility 70 MeV electron Linear Accelerator (LINAC) Four beam lines Electron / Laser interaction research / testing S-Band LINAC 2 Klystrons

6 BROOKHAVEN SCIENCE ASSOCIATES ATF; The Fire

7 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Test Facility (ATF; Bldg 820) Fire Investigation Investigation team; 8 members; BNL Incident description Causal analysis –7 causal factors; o Root, Direct, 5 contributing Judgments of need; 5 statements –ATF design review for restart –Site wide corrective action closure –Facility transfer –Design & maintenance stds; (HV) –ATF operator qualification Final Report; dated April 9, 2009 Comprehensive, well organized, concise Good basis for Corrective Action Planning

8 BROOKHAVEN SCIENCE ASSOCIATES ATF Fire Corrective Action Planning Committee Progress Corrective Action Planning Committee formed Scope –Review investigation report; focus on causal analysis –Develop corrective action plan to address judgments of need 9 members; BNL Corrective action plan ‘strategy’ determined o High voltage (HV) pulsed power focus o Institutional issues focus Initial report complete; includes HV Pulsed Power Corrective Action Plan DOE Lessons Learned document completed; distributed soon

9 BROOKHAVEN SCIENCE ASSOCIATES ATF Fire Corrective Action Planning HV Pulsed Power Working Group formed 8 members; 7 BNL; 1 ORNL Charge: 3 ‘phases’ –Return ATF to safe operation; design review; 08/31/2009 –Fire safety design review; 4 S-Band LINACS –Establish review, design, control, & maintenance requirements for HV pulsed power on site.

10 BROOKHAVEN SCIENCE ASSOCIATES ATF Fire Corrective Action Planning ATF Conduct of Operations Review Working Group formed 3 members; BNL 2 meetings completed; third scheduled Charge: –Review ATF Conduct of Operations program for effectiveness and compliance with DOE Order Change 2

11 BROOKHAVEN SCIENCE ASSOCIATES ATF Fire Corrective Action Planning More to come ‘Immediate’ need focused on BNL HV Pulsed Power Understand the systems in place and the risks they present Apply consistent controls (fire or arc detection, procedures, disconnects …) Establish maintenance criteria Assure adequate rigor in ‘Conduct of Operations’ Institutional need focused on management systems, policy, … sharing information and resources organizing management changes defining and meeting the resource needs for accelerator (or other facility level equipment) maintenance and operation implementing complete and consistent corrective actions establishing standards for equipment design and maintenance

End