Development of a community-based participatory network for integrated solid waste management By: Y.P. Cai, G.H. Huang, Q. Tan & G.C. Li EVSE, Faculty of.

Slides:



Advertisements
Similar presentations
LP Examples Solid Waste Management
Advertisements

INTRODUCTION TO MODELING
High Level Sub-regional Consultation on Advancing Action on Short Lived Climate Pollutants (SLCP) in Southeast and Northeast Asia 19 August 2014, Bangkok,
Part III Solid Waste Engineering
Life Cycle Assessment of Municipal Solid Waste Systems to Prioritize and Compare their Methods with Multi-Criteria Decision Making Hamid Reza Feili *,
1 LCA Overview in an European Framework Applications, Challenges & Barriers CARTIF FOUNDATION Boecillo Technology Park Boecillo (VALLADOLID) – ESPAÑA
Clean Water Act Integrated Planning Framework Sewer Smart Summit October 23, 2012.
Transmission; Foundation of a Power Market 12 May 2006.
INTEGRATED PLANNING: THE LINKS BETWEEN URBAN WASTE MANAGEMENT, SANITATION AND ENERGY.
Hydropower Development: Experience of Nepal
Introduction Dr. Yan Liu Department of Biomedical, Industrial & Human Factors Engineering Wright State University.
Lecture(2) Instructor : Dr. Abed Al-Majed Nassar
INDUSTRIAL & SYSTEMS ENGINEERING
Supply Chain Design Problem Tuukka Puranen Postgraduate Seminar in Information Technology Wednesday, March 26, 2009.
“Low cost ZERO WASTE Municipality” Under the MED programme, Objective 2.1: Protection and enhancement of natural resources and heritage 1 Project.
Multi-Criteria Analysis – compromise programming.
Life Cycle Analysis and Resource Management Dr. Forbes McDougall Procter & Gamble UK.
Presentation and Management of Heritage Assets
Strategic Financial Decision-Making Framework
Wenxin Zhang Department of Civic Design University of Liverpool
STRATEGIC MANAGEMENT ACCOUNTING Anushka De Silva.
Australian Perspective: EGSS Developments and Application Issues Peter Williams Assistant Director, Centre of Environment Statistics (P)+61 (0)
M ICHIGAN P UBLIC S ERVICE C OMMISSION Transformation of the Electric Power Industry: Value of Regulatory Impact Assessments Greg R. White Commissioner.
23/08/20151 European Investment Bank EUROPEAN INVESTMENT BANK Urban Development Projects 29 th May 2009 Barbara Lemke Urban Planner Projects Directorate.
Sustainable Tourism development
INTEGRATED ASSESSMENT AND PLANNING FOR SUSTAINABLE DEVELOPMENT 1 Click to edit Master title style 1 Integrated Assessment and Planning for Sustainable.
Integrated Assessment and Planning
Multiple-access Communication in Networks A Geometric View W. Chen & S. Meyn Dept ECE & CSL University of Illinois.
PEIP National workshop in Montenegro: developing environmental infrastructure projects in the water sector Feasibility Study Preparation Venelina Varbova.
Panel on Water, Food and Energy Overview of the Water & Energy issues and their linkages with food Richard Taylor, Executive Director, International Hydropower.
Internet Based Information Sources on Urbanism - Tutorial - Authors: D. Milovanovic, D. S. Furundzic, yubc.net.
MED 2007 – 2013 Low Cost Zero Waste Municipality The Integrated Decision Support Tool under development within Zero Waste project: the 1 st step towards.
DSS Modeling Current trends – Multidimensional analysis (modeling) A modeling method that involves data analysis in several dimensions – Influence diagram.
Monica Brezzi – Francesca Utili Department for Development Policies Ministry of Economic Development 17 th session of the Territorial Development Policy.
TRP Chapter Chapter 5.4 Facility development.
1 Economic Evaluation of Climate Change Adaptation Measures in the Caribbean: A Methodology Change Ms.Sophia Terrelonge.
LECTURE 8-9. Course: “Design of Systems: Structural Approach” Dept. “Communication Networks &Systems”, Faculty of Radioengineering & Cybernetics Moscow.
1 Safe Use of Wastewater in Agriculture Dr. Jens Liebe, UNW-DPC.
Sustainability Metrics  Lecture 1-Weak Sustainability Metrics Dr Bernadette O’Regan  Lecture 2-Strong Sustainability Metrics Prof Richard Moles  Lecture.
On visible choice set and scope sensitivity: - Dealing with the impact of study design on the scope sensitivity Improving the Practice of Benefit Transfer:
Introduction A GENERAL MODEL OF SYSTEM OPTIMIZATION.
TOWARDS THE EVALUATION OF THE SUSTAINABILITY OF A REGION, TAKING DIFFERENT SUSTAINABILITY CRITERIA INTO ACCOUNT. Bàrbara Sureda J.J. de Felipe Josep Xercavins.
Designing the alternatives NRMLec16 Andrea Castelletti Politecnico di Milano Gange Delta.
1 Chapter 5 Modeling and Analysis. 2 Modeling and Analysis n Major component n the model base and its management n Caution –Familiarity with major ideas.
Overview of Integrated Solid Waste Management (ISWM) Presentation made at the European Commission 7 th Framework Programme on Capacity Building Workshop.
ERT 319 Industrial Waste Treatment Semester /2013 Huzairy Hassan School of Bioprocess Engineering UniMAP.
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
Need for Geographic Information Systems in Decision Support Dr. Ahmad BinTouq URL:
SUSTAINABLE DEVELOPMENT IN LITHUANIA: HOW TO STRENGTHEN IT? Assist. Prof. Roberta Kareivaite.
“Social” Multicriteria Evaluation: Methodological Foundations and Operational Consequences Giuseppe Munda Universitat Autonoma de Barcelona Dept. of Economics.
Challenges in Dissemination: Meeting Users’ Needs with Limited Resources Niamey, 13 – 15 May 2014 by S. Mungralee Senior Statistician Statistics Mauritius.
Sustainability Science in North America: towards ICSS 2012 ”Knowledge to Action for Sustainability” James Buizer Science Policy Advisor to the President,
International Atomic Energy Agency Regulatory Review of Safety Cases for Radioactive Waste Disposal Facilities David G Bennett 7 April 2014.
Rob Verheem The Netherlands EIA Commission
Sustainable Community EMS Design Including Pollution Prevention Michelle M. Wyman Reed Smith Shaw & McClay LLP EMS Models and Strategies: ISO & Beyond.
1 S ystems Analysis Laboratory Helsinki University of Technology Effects-Based Operations as a Multi-Criteria Decision Analysis Problem Jouni Pousi, Kai.
Closing the Capability Gap: Strategic Planning in Infrastructure Sectors Hagen Worch & Jochen Markard PDW - Infrastructure Meets Business AOM 2009, August.
Responsive Innovation for Disaster Mitigation Gordon A. Gow University of Alberta.
Six global challenges were identified in policy for development cooperation: Oppression Economic exclusion Migration flows Climate change and environmental.
(I)WRM indicators A GWP PERSPECTIVE Water Country Briefs Project Diagnostic Workshop, Geneva, December 2010 Mike Muller : GWP-TEC.
Implementation Science: Finding Common Ground and Perspectives Laura Reichenbach, Evidence Project, Population Council International Conference on Family.
(ii) Modeling of Water Resources Systems Introduction and Basic Components D. Nagesh Kumar, IISc Water Resources Systems Planning and Management: M1L2.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
Biomass energy, bioetanol, biodiesel and USW.. Obtaining electricity from MSW The current trend in the correct treatment of municipal solid waste generated.
1 Life Cycle Assessment A product-oriented method for sustainability analysis UNEP LCA Training Kit Module k – Uncertainty in LCA.
Understanding the Integrated Resource Plan (IRP 2010 Rev 2)
Multiscale energy models for designing energy systems with electric vehicles André Pina 16/06/2010.
Markus Kummer Executive Coordinator
ELEC4011 Ethics & Electrical Engineering Practice Hugh Outhred
An Integrated Governance Approach towards Inclusive Development
Presentation transcript:

Development of a community-based participatory network for integrated solid waste management By: Y.P. Cai, G.H. Huang, Q. Tan & G.C. Li EVSE, Faculty of Engineering University of Regina April, 2008

Content 1. Introduction 2. Methodology 3. A Hypothetical Case Study 4. Application 5. Expected results

1. Introduction (1) Increasing concerns over municipal solid waste… !!! The situation will be even worse due to: urbanization, population growth, economic development and change of life style…, especially in many developing countries.

1. Introduction (2) In order to deal with waste related problems… A number of concepts, processes, factors as well as their interactions should be considered. Multiple concepts and ideas

1. Introduction (3) Multiple processes and facilities Waste can be recycled, composted, incinerated, or landfilled.

1. Introduction (4) Multiple stakeholders and interest groups Different stakeholder have different opinions on solid waste problems Local community and residents  objection to waste treatment facilities Government  financial budget and environmental protection Managers  minimizing costs and maximizing benefits …

1. Introduction (5) Therefore, Identification of desirable waste-flow-allocation patterns under uncertainty has received considerable attention … Thus, several challenges will be faced by decision makers… How to make tradeoffs between various objectives? How to identify the most acceptable decision alternatives among various interest groups and stakeholders? How to examine the complex interactions between social development, environmental protection, and economic investment? How to communicate the uncertain and conflicting information from different stakeholders into the process of decision making? How to identify optimal schemes for waste transport and treatment, as well as capacity expansion patterns for relevant facilities within a short- or long-term? How to locate waste treatment facilities in a community of a large-scale region?

2. Methodology (1) Thus, identify science-based schemes for solid waste management under uncertainty is desired… i.e., low economic cost, low environmental impacts high social acceptability high sustainability flexible, applicable and robust… For dealing with such problems, optimization models are effective…

Previously, dealing with waste management system in deterministic manner LP MIP DP -- Linear programming ( LP ) -- Mixed integer programming ( MIP ) -- Dynamic programming ( DP ) 2. Methodology (2) They cannot: (a) reflect uncertainty, (b) handle interactions between parameters, and (c) be applicable to real-world cases

Also, dealing with waste management system under uncertainty 2. Methodology (3) -- Fuzzy linear programming (FLP) -- Stochastic linear programming (SLP) -- Interval linear Programming (ILP) And their hybrid, e.g.,: -- Interval integer programming (IIP) -- Interval fuzzy linear programming (IFLP) -- Fuzzy integer programming (FIP) Till now, there are more hybrid methods…

● direct communication of uncertainties ● reflection of different uncertainty types ● reasonable computational requirements ● flexibility of results interpretation ● generation of decision alternatives ● applicable to practical problems 2. Methodology (4) A number of advantages can be identified with such inexact programming However, an individual deterministic/inexact modeling method can hardly deal with waste related problems in a systematic manner, can hardly take public opinions into consideration, especially in various communities of a region…

2. Methodology (5) Thus, major theme of this research focus on: ● An inexact fuzzy stochastic programming model ● Multi-criteria decision analysis ● Public participation and community involvement ● Policy analysis An integrated framework can be established for effectively addressing problems related to solid waste in communities…

2. Methodology (6) General framework…

2. Methodology (7) 2.1. An inexact programming model: OOrOOr Relevant parameters ( fuzzy- stochastic distribution )

2. Methodology (8) 2.2. MCDA methods: SAW (simple additive weighting) ELECTRE (elimination and choice translating reality) TOPSIS (technique ordered preference by similarity to the ideal solution)

2. Methodology (9) 2.3. Public participation and community involvement :

2. Methodology (10) 2.4. Policy analysis: comprehensive questionnaire survey

3. A Hypothetical Case Study Residue Landfill W-T-E Facility Community 2 Community 1 Community 33 MSW

4. Application in the future study Community 1

5. Expected Result... Plan of capacity expansion Capacity (t/wk) Existing Landfill Composting facility Recycling facility [45 49] [ ] [ ] [ ] [ ] [ ]

Plan of waste flow allocation

Thank you very much