RPC Trigger Electronics Review Subjects: Link System Low Voltage Link System Upgrade Krzysztof Doroba, University of Warsaw Krzysztof Doroba, RPC TRigger Review,
Low Voltage Low Voltage for Link Board System 68 A A3486S+1A3486=10 MAO’s 21 Easy Crates Performance/Problems Painfull breaking period of CAEN products - factory recalls due to design imperfections 4 A3016 not delivered yet 2 MAOs and 3 A3016 failed during operation (fixed) Krzysztof Doroba, RPC TRigger Review,
Low Voltage and Upscope Power Supply for VM Trigger Crates - already covered by Wojtek Okliński talk RPC System Upgrade: re-addinng re4 for η<1.6 extend acceptance up to η=2.1 Krzysztof Doroba, RPC TRigger Review,
Reduced RE system | | < 1.6 ME3 1.6 ME4/1 restored MB1 MB2 MB3 MB4 RPC Muon Chamber Geometry Today ME1 ME2
ME4/1 restored MB1 MB2 MB3 MB4 ME1 ME2 ME3 Geometry After Upscope RPC Upgraded RE system | | < 2.1
RPC Trigger Upgrade Krzysztof Doroba, RPC TRigger Review, RPC Trigger System Upgrade Trigger (USC55) part - covered by Wojtek Okliński Link System (UXC55) part more linkboards (MLB,SLB,CB) more linkboard boxes (LBBox) more LV PS extra cabling
Link system (1) MLBSLBCBLBB re1,2< re3< Total Endcap Total Barrel Total < Staged Link system Krzysztof Doroba, RPC TRigger Review,
MLBSLBCBLBBox re1>1.672*12* re2> re3> re4> total> MLBSLBCBLBBox re4< re-adding re4 for |η|<1.6 Extending re1,re2,re3,re4 up to |η|<2.1 Link system (2) * *MLB, CB and LBB for re1/1 are of the special type
Link system (3) LBB boards MLBSLBCBTotal Total (+spares) produced upgrade hi eta (w/o re1/1, re4) upgrade re4, < upgrade re1/ LV LBBA3016A3486 installed system upgrade re4, re1/ upgrade re1/11282 Krzysztof Doroba, RPC TRigger Review, Low Voltage system upgrade:
LB System Cables LB system for RE4 needs new cabling (from LBB to USC) and room for crates RE1/1 requires no new cabling, LBBoxes installed RE1/1 requires room for Power Supplies Krzysztof Doroba, RPC TRigger Review, Questions: room for RE1/1 LV PS at YE+1,YE-1?