Scintillator HCAL project overview Felix Sefkow HCAL Main Meeting June 30, 2008.

Slides:



Advertisements
Similar presentations
A preliminary analysis of the CALICE test beam data Dhiman Chakraborty, NIU for the CALICE Collaboration LCWS07, Hamburg, Germany May 29 - June 3, 2007.
Advertisements

Mathias Reinecke CALICE meeting Argonne EUDET module – Electronics Integration Contents -Next prototype : architecture -HCAL Base Unit (HBU)
Feb 20, 2009 CALICE meeting, Daegu, Korea QRL in Magnetic Field 1 QRLed Driver in Magnetic Field Jaroslav Zalesak Institute of Physics of the ASCR, Prague.
AHCAL – Electromechanical Integration EUDET annual meeting – Paris Oct M. Reinecke.
AHCAL Electronics. Status EUDET Prototype Mathias Reinecke for the DESY AHCAL developers EUDET Electronics/DAQ meeting London, June 9th, 2009.
Calorimetry: a new design 2004/Sep/15 K. Kawagoe / Kobe-U.
CALICE Meeting DESY ITEP&MEPhI status report on tile production and R&D activities Michael Danilov ITEP.
AHCAL Electronics. Status Commissioning and Integration Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 12th, 2010.
AHCAL – DIF Interface EUDET annual meeting – Paris Oct M. Reinecke.
AHCAL optimisation challenges towards a TDR Felix Sefkow ILD workshop Cracow, September 2013.
The Scintillator ECAL Beam Test at FNAL Adil Khan International Linear Collider Workshop 2010 LCWS10 & ILC10, Beijing, China CALICE Scintillator ECAL group.
The Scintillator ECAL Beam Test at FNAL K. Kotera, Shinshu-u, 1st October 2009 CALICE Scintillator ECAL group; Kobe University, Kyungpook University, the.
AHCAL updates: SPIROC and DIF Mathias Reinecke, Felix Sefkow CALICE/EUDET electronics meeting London, January 10, 2008.
Hadron Calorimeter Felix Sefkow EUDET Annual Meeting October 20, 2006.
AHCAL Electronics. Status and Outlook Mathias Reinecke CALICE collaboration meeting Cambridge, UK March 16th-19th, 2012.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
Future Beam Test Plans of the GLD Calorimeter Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
Montpellier, November 15, 2003 J. Cvach, TileHCAL and APD readout1 TileHCAL- fibre readout by APD APDs and preamplifiers Energy scan with DESY beam –Energy.
Scintillator tile-SiPM system development for CALICE Engineering AHCAL Prototype Michael Danilov, ITEP & CALICE LCWS10 Beijing March 2010 Outline New scintillator.
HCAL – Integration Plans Mathias ReineckeHCAL – Main meeting Introduction 2.HCAL Base Unit (HBU) - Update 3.Testboards 4.Light Calibration System.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
Pion Showers in Highly Granular Calorimeters Jaroslav Cvach on behalf of the CALICE Collaboration Institute of Physics of the ASCR, Na Slovance 2, CZ -
Detector Interface (DIF) Status CALICE meeting – DESYDec Mathias Reinecke.
R&D for a 2nd generation AHCAL prototype LCWS 2007 – DESY Hamburg Mathias Reinecke on behalf of the AHCAL partners.
GLD-CAL and MPPC Based on talks by T. Takeshita and H. K. Kawagoe / Kobe-U 2005-Sep-16 MPPC
Calorimetry and Muon Overview Felix Sefkow LCWS08 Chicago, November 15-20, 2008.
R&D status of the Scintillator- strip based ECAL for the ILD Oct LCWS14 Belgrade Satoru Uozumi (KNU) For the CALICE collaboration Scintillator strips.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers HCAL main meeting Hamburg, Dec. 10th, 2009.
HCAL future: 2 nd generation module and testbeam plans Felix Sefkow CALICE collaboration meeting Kobe, May 10-12, 2007.
Scintillator tile – SiPM development at ITEP Michael Danilov, ITEP CALICE Meeting, Casablanca, 23 Sep 2010.
V. Korbel, DESY1 Progress Report on the TESLA Tile HCAL Option To be filled soon.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
Systematics on ScECAL 1 st prototype DESY Apr , CALICE Satoru Uozumi for the CALICE collaboration NIM A, 763 (2014) 278.
Scintillator HCAL read-out and calibration Felix Sefkow TILC08 at Sendai, Japan March 4, 2008.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
The 2 nd SCECAL module for the Fermilab beam test - tentative idea - S. Uozumi (Shinshu) Jun GLDCAL meeting Next beam test will be held likely.
The CALICE scintillator tile HCAL project Felix Sefkow LCWS’06, Bangalore March 9-13, 2006.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
AHCAL Electronics. integration status and open issues Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.
AHCAL Electronics. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE Days DESY Hamburg, March 31st, 2009.
Performance of Scintillator-Strip Electromagnetic Calorimeter for the ILC experiment Satoru Uozumi (Kobe University) for the CALICE collaboration Mar 12.
Hadron Calorimeter Felix Sefkow EUDET Extended Steering Meeting September 11, 2006.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
AHCAL Integration. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE week Lyon IPNL, Sept. 16th – 18th, 2009.
ILC/EUDET developments at LAL Scientific council 23/9/05 B. Bouquet, J. Fleury, C. de La Taille, G. Martin-Chassard LAL Orsay.
Mathias Reinecke CALICE week - Manchester Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
Next generation HCAL prototype Felix Sefkow EUDET electronics meeting UCL, December 5, 2006.
HCAL Modules -First Ideas Mathias ReineckeHCAL – MPI meetingJan Motivation 2.Mechanical Constraints 3.HCAL Base Unit (HBU) 4.Light Calibration.
SiW ECAL Marcel Reinhard LLR – École polytechnique LCWS ‘08, Chicago.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers EUDET electronics and DAQ meeting Paris Palaiseau, Jan. 14th, 2010.
Future test beam options Felix Sefkow CALICE AHCAL main meeting DESY, June 16, 2009.
EUDET HCAL prototype; mechanics Felix Sefkow Work by K.Gadow, K.Kschioneck CALIC collaboration meeting Daegu, Korea, February 20, 2009.
LED notched fibre system short HBU0 party with QMB6
Felix Sefkow DESY LDC at Vienna November 17, 2005
Status of HBU, EBU and SM_HBU
CALICE meeting 2007 – Prague
CALICE scintillator HCAL
HCAL task status report
Towards a realistic Scintillator HCAL with SiPM read-out
HCAL Modules -First Ideas
ScECAL+AHCAL+TCMT Combined Beam FNAL
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
Scintillator HCAL: LOI issues
   Calorimetry et al.    SUMMARY 12 contributions Tile HCAL
CALICE meeting 2007 – Prague
Status of the EUDET Prototype
Scintillator HCal Prototype
Calice Tile-HCal and Tail-catcher/Muon Tracker
Presentation transcript:

Scintillator HCAL project overview Felix Sefkow HCAL Main Meeting June 30, 2008

Felix Sefkow HCAL main, June 30, 2008Project overview 2 Where we are, where we go: Analysis: status and opportunities Test beam at FNAL R&D, EUDET and beyond

Felix Sefkow HCAL main, June 30, 2008Project overview 3 From proof-of principle to reality

Felix Sefkow HCAL main, June 30, 2008Project overview 4 Validate shower models 1.Model uncertainties on PFLOW performance 2.Confront shower models with test beam data First results on global properties Next: fully exploit granularity for fine structure M.Thomson (Cambride) data □ LHEP △ QGSP-BERT

Felix Sefkow HCAL main, June 30, 2008Project overview 5 Validate PFLOW performance Test beam ‘jets’ would require magnet and tracker (future) Jet energy resolution depends on hadronic energy resolution and confusion High granularity, low occupancy: use event overlay techniques Two particle separation in test beam data and Monte Carlo: A. Raspereza CALICE preliminary

Felix Sefkow HCAL main, June 30, 2008Project overview 6 Calibration procedures Non-linearity correction: test with electron data MIP calibration: in test beam data, explore use of MIP segments in hadron showers Correct for temperature- induced variations –Use T-sensors and measured T dependences Use gain monitoring, adjust voltage Talks by Sebastian, Shojun,Trygve

Felix Sefkow HCAL main, June 30, 2008Project overview 7 Analysis opportunities Wonderful results - and there is so much more to do… precision: model uncertainties ~ exp errors 3d profiles, correlations, sub-structure software compensation (weighting), ultimate resolution temperature corrections applied PFLOW: 2 part sep: more distances, energies, MC –Pandora-Tbeam angular incidence, protons, low energies ECAL HCAL combined: E res and PFLOW new generation of PhD students, more institutes

Felix Sefkow HCAL main, June 30, 2008Project overview 8 Collaborating institutes Czech R.: Prague France: LAL Orsay Germany: DESY, Hamburg, Heidelberg, MPI Munich, Wuppertal Japan: Kobe, Shinshu Russia: JINR; ITEP, LPI, MEPHI Moscow UK: Cambridge, Imperial C, UCL,,Manchester, RAL US: Northern Illinois In preparation Canada: McGill Norway: Bergen Under discussion: Italy: INFN Rome I

Felix Sefkow HCAL main, June 30, 2008Project overview 9 HCAL software Reconstruction software and data base continuously improving –see talks by Niels and Andrea data should be analyzable outside DESY - already now! still a lot to do on spatial dimensions –tracking, alignment, shower centre, bias corrections,… integrate with sci ECAL: reco, sim, digit And later with DHCAL… Maintain link to optimization studies –Core software: as much as possible and reasonable

Felix Sefkow HCAL main, June 30, 2008Project overview 10 New Mokka model Revised, refined, realistic parameterization New degrees of freedom Detailed modelling of layer edges Non-pointing cracks in rφ and z possible End caps A. Lucaci, R. Diener (DESY)

Felix Sefkow HCAL main, June 30, 2008Project overview 11 Test beam at Fermilab Preparation is everything!

Felix Sefkow HCAL main, June 30, 2008Project overview 12 plans Experience from May and plans for July –Low energies and good statistics for technology comparison –See talk by Erika September: integration of SciECAL Early next year: possibly 2 nd all- scintillator run Later in 2009: expect first set of DHCAL layers from US K.Gadow

Felix Sefkow HCAL main, June 30, 2008Project overview 13 R&D on scintillators and sensors Progress with photo-sensors: new options (?) –See talks by Roman, Simon sensor on tile, with fibre: OK –Thinner scintillator possible with MRS-APD or MPPC sensor on tile, direct coupling: ? –in principle possible with blue-sensitive sensors (MPPC, + ?) –Light yield OK for 5mm tiles, but non-uniform –3mm tiles, non-uniformity compensation: needs larger area, new package –Strips: works in ECAL, LY and unif. OK but less advantageous for HCAL sensor on PCB: studied at NIU, T2K electronics –issues: optical stability, integration chain

Felix Sefkow HCAL main, June 30, 2008Project overview 14 EUDET prototypes The “integration prototype” –2 nd generation ASICs – electronics integration, c –calibration system, –compact mechanics 2nd generation ASICs: –On-chip zero-suppression, digitization and TDC SPIROC1: on the test bench since end 07  see Wei’s talk –some bugs (ADC ramp polarity, probe bus) and some mircales on analogue side –tests to expand on digital side with new test board SPIROC2: submitted in June, expected in October  Ludovic’s talk –"1st chip where everything works" –hopefully OK for EUDET, but possibly one more version needed 3rd generation (beyond EUDET): – individual channel trigger handling –signal to noise for low gain sensors

Felix Sefkow HCAL main, June 30, 2008Project overview 15 EUDET, cont. Calibration system:  talks by Sebastian, Ivo –two approaches: electrical and optical distribution –both make progress, both have open issues Electronics integration:  tall by Mathias –First layer board (HBU): layout waiting for tile dimensions –Work on digital interface started Prototyping sequence: –first proto: tile integration and readout chain  2008 –second proto: "real" readout board for cassette and end board  2009 goal: a "demonstrator module" - 2m long, 7mm thin possibility: new minical: 12 layers x 12x12 tiles Absorber mechanics:  talk by Kirsten –Detailed FEM calculations confirm design with minimal dead space and no gaps –1st step layer demonstrator, 2nd step 1:1 model

Felix Sefkow HCAL main, June 30, 2008Project overview 16 Far future: DevDet EU FP7 DevDet proposal submitted in Feb 08 –evaluated 12.5/15, but approval not very likely Even without funding: we know what we want and will apply again EUVIF: vertical integration facility HCAL project: –2nd generation prototype, compact –stainless steel absorber for tests with B>0 –scalable integration facilities Eudet to be extended -> 2010, next FP7 call 2010

Felix Sefkow HCAL main, June 30, 2008Project overview 17 Conclusion Test beam data: a treasure Ongoing data taking: needs your support EUDET and beyond: focussed R&D Enjoy the meeting!

Backup slides

Felix Sefkow HCAL main, June 30, 2008Project overview 19 Tile sensor systems with WLS fibre Present test beam system – 5mm thick tile with fibre, MEPHI/ PULSAR SiPM, 15 pixels/MIP Several new options: reduce to 3 mm thick tiles –Hamamatsu MPPC-1600 –MRS APDs (CPTA) M.Danilov (ITEP)

Felix Sefkow HCAL main, June 30, 2008Project overview 20 Tile sensor direct coupling Possible with blue-sensitive sensors – Hamamatsu MPPC 1600 (400) Obtain about 7 (11) px/MIP from 5 mm tiles; low noise –  increase area Need to restore uniformity –Some add al light cost Other proven option: strips –CALICE SciW ECAL 1600 px Tile 30x30x5 mm3 D.Jeans (Kobe) V.Zutshi (NIU) N.D’Ascenzo (DESY)

Felix Sefkow HCAL main, June 30, 2008Project overview 21 Tile PCB coupling Scintillator photo-sensor system has to match electronics PCB tolerances Several options –Mega-tiles (easier assembly, but some optical cross-talk –New: idea “lego” tiles with alignment pins 30x30x3mm 3 Other option: surface-mounted sensors on PCB –Different integration chain V.Rusinov (ITEP) P.Rubinov (FNAL) SiPMs

Felix Sefkow HCAL main, June 30, 2008Project overview 22 Integrated layer design Sector wall Reflector Foil 100µm Polyimide Foil 100µm PCB 800µm Bolt with inner M3 thread welded to bottom plate SiPM Tile 3mm HBU Interface 500µm gap Bottom Plate 600µm ASIC TQFP-100 1mm high Top Plate 600µm steel Component Area: 900µm high HBU height: 6.1mm (4.9mm without covers => absorber) Absorber Plates (steel) Spacer 1.7mm Top Plate fixing DESY integrated M.Reinecke (DESY)

Felix Sefkow HCAL main, June 30, 2008Project overview 23 Optical calibration system SiPMs, MPPCs are self- calibrating –Ph.e. peak distance ~ gain Embedded LEDs – electronic signal distribution –tested, no cross-talk to sensors seen –To be optimized: dynamic range, LED uniformity Alternative: central driver and optical signal distribution M.Reinecke (DESY) S.Weber (Wuppertal) I.Polak (Prague)

Felix Sefkow HCAL main, June 30, 2008Project overview 24 New ASIC on the test benches Auto-triggering and time measurements ADC and TDC integrated Power pulsing, low (continuous) power DAC L.Raux (LAL) R.Fabbri (DESY)

Felix Sefkow HCAL main, June 30, 2008Project overview 25 Barrel HCAL architecture AHCAL Slab 6 HBUs in a row HBU HCAL Base Unit 12 x 12 tiles SPIROC 4 on a HBU HEB HCAL Endcap Board Hosts mezzanine modules: DIF, CALIB and POWER HLD HCAL Layer Distributor 1/16 of barrel half Power: 40 µW / channel Heat: T grad. 0.3K/2m Time constant: 6 d P.Goettlicher (DESY) Front end ASICs embedded Interfaces accessible

Felix Sefkow HCAL main, June 30, 2008Project overview 26 Details Interface Prototype M.Reinecke (DESY)

Felix Sefkow HCAL main, June 30, 2008Project overview 27 Mechanical structure Aggressive design: 3mm walls No additional spacers FEM calculation with sector details for full barrel –Max displacement 2mm, stress –Integration with cryostat and ECAL K.Kschioneck (DESY)