J. TAN, M. SORDET, L. SØBY, F. GUILLOT-VIGNOT, D. GERARD, M. LUDWIG, D. STEYAERT BE/BI Linac4 Instrumentation Review 18th October 2011.

Slides:



Advertisements
Similar presentations
LINAC4 and 3 MeV test stand at CERN
Advertisements

M.Gasior, CERN-AB-BIBase-Band Tune (BBQ) Measurement System 1 Base-Band Tune (BBQ) Measurement System Marek Gasior Beam Instrumentation Group, CERN.
C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
Bunch shape monitor for Linac-4 A.V.Feschenko Institute For Nuclear Research (INR), Moscow , Russia.
Update of EXT Stripline BPM Electronics with LCLS-style Digital BPM Processors Glen White, with slides by Steve Smith 15 December 2009 ATF2.
Linac4 BPM and Phase Pickup L. Søby08/ LINAC4 Beam Position, Phase and intensity Pick-ups.
Space Charge meeting – CERN – 09/10/2014
Bob Lill Undulator Systems – BPM April 20, 2006 Undulator Cavity BPM Status and Plans.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
High Resolution Cavity BPM for ILC final focal system (IP-BPM) ILC2007/LCWS 2007 BDS, 2007/6/1 The University of Tokyo, KEK, Tohoku Gakuin University,
ESS DTL beam commissioning
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
Tesla Meeting Frascati 27/05/03 C. Magne Cold BPM for TTF2 Tesla prototype - low beam impedance - cooling to 2K without strain - Low beam coupling impedance:
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
BPMs and HOM-BPMs for the XFEL Linac N. Baboi for the BPM and the HOM teams (DESY, CEA-Saclay, SLAC, FNAL, Cockroft/Daresbury) XFEL Linac Review Meeting,
Experience on design, prototyping and testing of cavity BPM for the European-XFEL > Motivation > Introduction > Principle of CBPMs > Mechanical properties.
M.Gasior, CERN-BE-BIBE-KT Innovation Day, 3 June Base Band Tune (BBQ) measurement systems - observing beam oscillations with sub-micrometre amplitudes.
Linac4 FBCT’s 18/ L4 BI BCT review Lars Søby On the behalf of: M. Andersen, D. Belohrad, L. Jensen, Franco Lenardon and J. C. Allica Santamaria.
Uli Raich CERN BE/BI Instrumentation for the new H - Source Test Bench Linac-4 Ion Source Review 2011 Uli Raich CERN BE/BI Linac 4 ion source review, CERN.
1 C. Simon CLIC Instrumentation workshop BPM C. Simon on behalf of the Saclay’s group CLIC Instrumentation workshop 2 nd - 3 rd June.
Beam diagnostics in the beamlines
The beam-based alignment and feedback systems, essential operations of the future colliders, use high resolution Beam Position Monitors (BPM). In the framework.
Beam Instrumentation for the HIE-ISOLDE linac Francesca Zocca ISOLDE Workshop and Users Meeting December CERN Instituto de Estructura de la.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Collimator BPM electronics – Results from the lab, SPS and LHC
Production and Installation Policy of IP-BPM ATF2 Project Meeting, 2006/12/18 Y. Honda, Y. Inoue, T. Hino, T. Nakamura.
CLIC09 Workshop October 2009Drive beam BPM’sLars Søby 1 Drive Beam BPM’s CLIC 09 work shop, CERN, of October 2009, Lars Søby.
Beam Test status and Plans of the ILC Main LINAC BPM
Beam position instabilities in the PSB injection line J. Tan, M. Bozzolan, L. Søby, B. Mikulec, G.P. Di Giovanni, O. E. Berrig, E. Benedetto BI Technical.
SLAC ESA T-474 ILC BPM energy spectrometer prototype Bino Maiheu University College London on behalf of T-474 Vancouver Linear Collider.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
Ch. Vuitton – BE/BI Presented by R. Veness – BE/BI 18th October
K.Hanke / TDR Meeting / 13 June 2006 Linac 4 Diagnostics L4: K. Hanke, M.Pasini (requirements, specifications, integration) AB/BI: U.Raich et al. (technical.
Outline Injection septum SMH42 Injection bumper Resources Conclusion LIU-ABT review 20/11/2015 Status PS injection septa2.
L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker.
Development of a High Resolution Cavity BPM for the CLIC Main Beam
LINAC4 emittance measurements BI Day Divonne, 24 th November 11/24/2011 B.Cheymol, E. Bravin, D. Gerard, U. Raich, F. Roncarolo BE/BI 1.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
INFN- Legnaro National Lab. Activity on ESS DTL Diagnostics: BPM & BCM
LCLS Digital BPM Processor for ATF2 Extraction Line BPMs Steve Smith 26 August 2009.
1CEA/ Saclay/ SACM CARE/SRF/WP11 Development of a new Beam Position Monitor for FLASH, XFEL and ILC Cryomodules Claire Simon, Michel Luong, Stéphane Chel,
In-pulse-average: Search for multiples of t rf and t DAQ which “coincide”: 1891 t DAQ = ns ~ =41 t rf Calculate sample mean over blocks of.
LEReC BPM Status P. Cernigla, R. Hulsart, R. Michnoff, Z. Sorrell June 2, 2016.
PXIE Beam Instrumentation Status Update Vic Scarpine Weekly PIP-II Meeting June 7, 2016.
CLIC Workshop 18 th -22 nd January 2016, CERN 1 Alfonso Benot Morell Manfred Wendt.
PIP-II Beam Instrumentation Vic Scarpine PIP-II Machine Advisory Committee Meeting March 2016.
Beam Diagnostics for the FAIR Proton LINAC RFQ Workshop at GSI
EUROTeV Diagnostics WP5
Experience with beam instrumentation at Linac4
Linac4 Beam Characteristics
402.5 MHz Debunching in the Ring
CLIC Workshop 2016: Main Beam Cavity BPM
BE-BI Software for LINAC4
Status of the BI Work Package in the LIU-PSB frame
LINAC 4 source & LEBT measurement results
CTF3 kicker activities at CIEMAT
Diagnostics for ThomX Nicolas HUBERT, Marie LABAT, Moussa EL-AJJOURI, D. PEDEAU, Synchrotron SOLEIL Iryna CHAIKOVSKA, N. DELERUE, LAL.
F.Marcellini, D.Alesini, A.Ghigo
Part2: Cavities and Structures
ERL BPM System Mike Billing, Mark Palmer
LINAC4 commissioning plans etc.
Bunch Tiltmeter Steve Smith SLAC Snowmass July 16, 2001 Update date
Advanced Research Electron Accelerator Laboratory
Part2: Cavities and Structures
MEBT1&2 design study for C-ADS
Physics Design on Injector I
Breakout Session SC3 – Undulator
HL-LHC HEL BPM.
Presentation transcript:

J. TAN, M. SORDET, L. SØBY, F. GUILLOT-VIGNOT, D. GERARD, M. LUDWIG, D. STEYAERT BE/BI Linac4 Instrumentation Review 18th October 2011

 BPM ◦ Layout ◦ Functional specs ◦ The monitor and low beta beams  STATUS ◦ Drawings and prototyping ◦ BPM test bench and Acquisition chain ◦ First BPM characteristics ◦ Todo list  Spare policy  Planning  Summary

Line # of Monitors Beam position Rel. Beam Int. Beam phase TOFComments ResolutionAccuracy L4D2 0.1mm0.3mm 1% wrt to peak current 0.5  1 per mille L4C7 L4P6 L4T to PSB 27 Observable 1: Beam position Observable 2: Relative beam intensity between two BPMs 3 MeV 50 MeV 102 MeV 160 MeV L4L ~ 12 mL4D ~18 mL4C ~22 mL4P ~14 m L4T- LT- LTB-BI ~ 178 m L4Z ~10 m Observable 3: Beam phase wrt RF reference Observable 4: Energy via TOF between two BPMs

 Shorted Stripline  Linear  Fair sensitivity  Compact  Reasonable price  Resonating   -dependent Shorted 45  Z 0 = 50 

Movable test bench BPM Transfer impedance changes with  and bunch length PU sensitivity changes with  These simulations confirm Shafer’s theorem (1994) The values obtained from the simulations will be implemented in the software Sensitivity at 352MHz 

 BPM ◦ Layout ◦ Functional specs ◦ The monitor and low beta beams  STATUS ◦ Drawings and prototyping ◦ BPM test bench and acquisition chain ◦ First BPM characteristics ◦ Todo list  Spare policy  Planning  Summary

L4L ~ 12 mL4D ~18 mL4C ~22 mL4P ~14 m L4T- LT- LTB-BI ~ 178 m L4Z ~10 m Beam aperture: 34 mm Electrode length: 72 mm Quad DTL Beam aperture: 34 mm Electrode length: 117 mm TRANSFER LINE Beam aperture: 100 mm Electrode length:140 mm CCDTL and PIMS Beam aperture: 39 mm Electrode length:117 mm 3 BPMs with welded feedthroughs onto the body 39 BPMs with feedthroughs mounted on CF flanges 3 BPMs with welded feedthroughs onto the body 39 BPMs with feedthroughs mounted on CF flanges

Modular commissioning of RFQ, MEBT and DTL tank1 Transverse : profiles, emittances, halo, position Longitudinal : transmission, av. energy, halo,  E/E, bunch phase spread Three BPMs Beam aperture: 67 mm Electrode length: 60 mm

Body Electrode Feedthrough detail Mounted unit with Welded feedthroughs Feedthrough

Issues During e - bombardment welding Three feedthroughs affected by : Manufacturer’s procedure:  glass-ceramic seal  No sand blasting  Ultrasonic cleaning +acetone rinsing before Scanning electron microscopy Standard 304 grade stainless steel Surface not inlayed with dust particles Traces of Si, Na, Mg, Ca Welded feedthroughs Sparks Material spray Multi-pass welding needed

 Wire technique w/ standing waves  Optical sensor for mechanical centering :  0.01mm  352MHz sine wave with a N.A.  Data acq by steps of 0.1mm Commissioning issues  Black anodized coating =poor grounding.  Solution : Improve grounding. Done  Wire not terminated = Antenna  Solution : terminate the wire by a short circuit. Done  Optical rail : C-shape & 25mm cross section yield a lack of stiffness and 1mm electrical offset  Solution : Swap to a full frame of 34mm cross section. Pending action.

FEATURES Input Low pass Down-mixing with LO Variable gain with switchable attenuators Band-pass BPM Calibration LO U D L R ADCADC

I R Q R –I R -Q R V R, ADC V L, ADC time MHz Carrier Signal T carrier =45.42ns I L Q L –I L -Q L Clock jitter ~10ps M R -M L M R +M L +M U +M D  x =  beam -  LO I = M R +M L +M U +M D TOF =  PU2 -  PU1

 Beam aperture= 67mm  Electrode length = 60mm THEORYH planeV plane Slope [mm]  =  =0.56 Elec. Offset [mm]  =  =0.13 Coupling w/ adjacent electrodes 7.3%

352MHz signal injected via the wire Measured voltages amplitudes from electrodes : ~65mV From the simulations, this is equivalent to a signal induced by a nominal beam of 1.14x10 9 H - 98  longitudinal phase (nearly debunched beam) Position (averaged over pulse length 740  s  ~32k positions) Precision= 0.1mm Resolution = 0.1mm Resolution with few samples : to be done RF phase wrt LO Precision =  1  (room for improvement)

 Understand welding issues  Improve stiffness of lab test bench  Transfer impedance and characteristic impedance  Resolution with short pulses  Improve ADC clock jitter : the goal is ~200fs  Commissioning of BPM calibration procedure  Software : algorithm for I, Q, -I-Q determination  Measurement with a pair of BPMs  TOF  Relative beam intensity  Signal processing : Choose between  SIS3302 (16bits – 13.4ENOB) : 6400CHF per board x25  FMC (14bits – 11.7ENOB) : Status ? 25 boards. Unknown final price

 BPM ◦ Layout ◦ Functional specs ◦ The monitor and low beta beams  STATUS ◦ Drawings and prototyping ◦ BPM test bench and Acquisition chain ◦ First BPM characteristics ◦ Todo list  Spare policy  Planning  Summary

 Monitors ◦ Movable Test Bench : 3 +2 spares for lab commissioning ◦ Linac : spares (one per version) ◦ Transfer line : spares ◦ TOTAL : 55 BPMs  Acquisition chain ◦ Front end board : spares ◦ ADC or FMC : spares

Start of Machine Installation Start of TL construction & Installation LS1 Start of Machine Commissioning

 Very encouraging results yet still a lot of work ahead of us.  Ready for the Movable Test Bench commissioning  Planning in phase with Linac4 installation and LS1  Budget sligthly underestimated : overrun by ~200kCHF

 …Questions ?

Movable test bench 3-12MeV DTL 50MeV CCDTL 102MeV PIMS 160MeV New TL -> LT.BHZ20 160MeV Old TL -> PSB 160MeV Number of BPMs Beam Ap. [mm] 6734 / Long. Phase [  rms] 6.4 / RMS length [ps] 50 / Bunch spacing : 2.84 ns

 Nominal beam phase width evolution (1RMS)  Simulations with CST Particle Studio ◦ Multi-bunch ◦ Space charge effect ◦ Low  MEBTLinac4PSB strip. foil Sigma [ps] Rel. beta

Power flow module Electric field module External diameter of the RF feedthrough is important

gap 0.5mm Body Electrode Capacitive effect : 9pF C