Introduction Graeme Orr, Atyrau, April 2011.

Slides:



Advertisements
Similar presentations
Managing Hardware and Software Assets
Advertisements

Ukraine, Кyiv, 2013 Presentation of LLC SERVICE-NS: Reliable and uninterrupted technical service of filling stations and petroleum storage depots, providing.
© ABB Oy 1 DOCPLCMODEL01 ABB Drives product lifecycle management model (PLM) June 2004.
Chapter 10 Material Handling.
3rd meeting COTS team April 25, 2007, Helsinki
Higher Business Management Budgets. What is a Budget? A document showing what the organisation predicts they are going to spend in the future Usually.
EG Medical Systems Maintenance BU MEDICAL SYSTEMS Service Department Scope  Service Department offers after sales service for products sold by EG Medical.
Introduction to Performance Contracting. What Is an ESCO? An Energy Services Company helps customers: –Upgrade facilities, including both: Energy efficiency.
DPS 304 : Purchasing /Procurement Activities
Online Backup. Introduction Company Data is paramount to every business. In relation to data backup, our slogan is as follows; "Backup is cheap but recovery.
1 COLD CALLING & NEW ACCOUNTS  Finding New Business is The biggest Challenge We Face in Sales  The Days of Showing up on the doorstep and getting a meeting.
THE CONTEXT OF LOGISTICS. Cycle of Supply and Demand Customers Other Inputs Other Outputs Operations Demand for Products Supply of Products passed to.
MVELASERVE The foremost provider of outsourced solutions Introduction of Mvelaserve.
Service and Training. Our engineers and Instructors are all highly qualified and possess many years of experience with top manufacturers. Surveys Studies.
IT Technical Support Policies and Procedures South Nottingham College.
UK WIR The UK Experience Christopher Royce Anglian Water Services.
1 The Nature of Costs Understanding is the Key to Control.
2005 Consumer-Directed Supports: An Introduction.
The Reality of the Struggle to Align the Business with I.T. Rosana F. Chaidez Large Company Technology Networking Conference June 17th – 18th, 2008.
Racco industrial consulting working according to investment law to prepare Engineering, Economic, Technology, Environmental Studies for industrial projects.
ABB LCC ECS - 1 © 2004  Industrial IT Power Management System Scope & Value Proposition Lead Competence Center Electrical Control Systems.
10-1 Multiple Question Approach  Situation  Problem  Implication  Need-payoff questions  Remember product not mentioned in SPIN!
Sourcing Agreement Between
Month Year Working together to achieve your desired outcomes, by delivering service excellence. Building Engineering Solutions for the optimisation of.
Introduction to SAP R/3.
Energy Performance Contracting Approach David Birr President Synchronous Energy Solutions.
LNG Technology.
“Biomass in our Schools” EPMA Presentation Presented by: April 10, 2013.
Understanding Feasibility Reports TCO 341 Dr. Codone Fall 2002.
ANALYSI Web: ANALYSIS LTD Gandijeva 76A Novi Beograd tel/fax:
1. 2 Organizational Structure OSX Ownership OSX Leasing OSX Shipbuilding Unit OSX Services Free Float Integrated offshore E&P equipment and services provider.
RAM Modelling in the Project Design Phase Friday 30 th April, 2010 Paul Websdane Reliability Modelling for Business Decisions Asset Management Council.
Value creation: problem and solution approaches Jan Holmström Industrial Engineering and Management Aalto University School of Science.
‘Developing the appraisal process in the wider context of the Sport and Fitness sector of Higher Education’. Welcome & Introductions.
June 20, 2012 Outsourcing Physical Plant Should I ???
Chapter 6 Sourcing. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the difference between.
Projects and procurement (lecture). Procurement Acquiring hardware, software, materials, services, spare parts, skills, workforce etc. which are necessary.
Stakeholders. DO NOW Page 71 Tata Nano Divides Opinion answer all questions at the top of page 72.
CHAPTER#08 MANAGEMENT OF TECHNICAL PROPOSALS AND SPECIFICATIONS Lecture No. 08 Course: Engineering Management 19 april 2013 MED DEPARTMENT, U.E.T TAXILA.
Commercial Matters Dublin Waste to Energy Project.
Life cycle services for automation products
J. Havskov and L. Ottem öller Key to sustainable networks: Manpower and skills more then equipment.
Unit (7) Why businesses make decisions? The decision that they make might include. - what to produces, where to locate the premises, what method of production.
Unit 1: What is economics all ABOUT? Chapters 1-6.
Veolia Water Solutions & Technologies
Leading State Inspector Ivan Rovkach Department of Nuclear and Radiation Safety Ministry of Emergency Situations of the Republic of Belarus(GOSATOMNADZOR)
GCSE Business Studies - Human Resources. Describe what is meant by ‘business ethics’? Ideas about what is morally correct or not, applied in a business.
Or the 4 Ps of marketing.  The marketing mix or 4 Ps of marketing: ◦ Price ◦ Product ◦ Promotion ◦ Place  Decisions about these are based on the results.
6 Essential Questions To Ask Your Scheduling App Provider Chances are you’ve heard of the many benefits that come with a good scheduling app and you are.
Testing Requirements in the Boiler House Requirements for regular testing will vary according to national regulations, and the type of equipment installed.
Growth through investment. Introduction to Bibby Line Group Started as a family- owned shipping business on 1807 Group now includes logistics, financial.
Scale and resource mix Learning Objectives Understand what is meant by productive efficiency Learning Outcomes  Describe the issues involved in choosing.
Level 2 Business Studies AS90843 Demonstrate understanding of the internal operations of a large business.
Manufacturing systems Brian Russell. Exam expectations Issues associated with Manufacturing are regularly tested in the written paper. Questions often.
Equipment and technological processes for manufacturing GaAs MMICs THE PRACTICALITIES OF BUYING AND USING PROCESSING EQUIPMENT TALK 15 1.
SHORT COMPANY PROFILE 2016.
Uniper Energy Services
Affordable Energy Production from Renewable Fuel
Initiating systems development
UNIT V QUALITY SYSTEMS.
Organization and structure
HEATING AND COOLING SERVICES Karalis mechanical provides air conditioning repair Springfield. The best potential solution for your home or business, you.
BU IS GIG Chemical, Oil & Gas
Across the entire value chain
Projects and procurement
Finance for Non-Financial Managers
Projects and procurement
GCSE Business Studies - Human Resources
FISKERSTRAND HOLDING AS
GCSE Business Studies - Human Resources
Presentation transcript:

Introduction Graeme Orr, Atyrau, April 2011

Contents VWS - a short introduction Presentation Questions

Veolia Water Solutions & Technologies (VWS) The world leader in water treatment water treatment specialist for industry and municipalities design & build of complete installations design and implementation of technological solutions the technology division of Veolia Water 130 subsidiaries in 57 countries 9,500 employees €2.5billion revenue in 2009

VWS Westgarth Design & Build of turnkey water treatment systems: Offshore Injection Water sulphate removal plant (SRP) Produced Water Treatment both on and offshore applications Sea Water Reverse Osmosis (SWRO) municipal/industrial applications V-Care (VWS Westgarth Upstream Services brand) services, maintenance, spares & monitoring

Graeme Orr, Atyrau, April 2011 How the correct selection of after sales service provider can impact process reliability and upstream production Graeme Orr, Atyrau, April 2011

The Situation Your organisation has just invested a large amount of money on new equipment Your supplier has just given you the manuals. And gone home, leaving you to operate

Some manuals are better than others But now it needs to work, and repay your investment

So who will now take care of your plant? This guy? Good job!

So who will now take care of your plant? Maybe this one? With the correct spare parts of course!

The Point You need to choose your service provider carefully, and do not want to take risks with your expensive new plant

The Solution The best people to support you in making your plant perform are those that designed and built it If your supplier cannot do this, is it a wise decision to buy from them? Ask your purchasing department exactly why they are a little bit cheaper “The quality of equipment is remembered long after the purchase price is forgotten” “Expert assistance is much lower cost than repair”

A Typical Service Package A good supplier should be able to offer a range of services to ensure a productive and reliable plant: commissioning operation upgrades spares training chemicals data acquisition & review technical support Can your supplier offer this? Why not?

The V-CareTM Family V-CareTM Services V-CareTM Onshore Services V-CareTM Maintenance V-CareTM Offshore Services V-CareTM Services HydrexTM Chemicals V-CareTM Engineering Services Set the benchmark that others have to aspire to Put the clients interests to the fore - demonstrate the benefits + continually develop the service offering We are the experts - offer the client what they need, not what they think they need. Clients are beginning to realise SRP is not a black box and ignoring the Health of the plant will impact on availability, reliability and cost of operating the plant i.e. South Arne and FPSO Brasil. Two types of client at the moment those actively seeking Healthcare those who don not think they require healthcare V-CareTM Spares Management V-CareTM Training Services

Example: V-CareTM Remote Monitoring

Case Study 1 – South Arne Platform Oil production platform in the central North Sea Sulphate removal system designed and built by VWS Westgarth Commissioning completed May 2002 Client takes over plant Performance deteriorates Client invites VWS Westgarth back under contract to restore performance V-CareTM contract begins January 2003

Case Study 1 – South Arne Veolia leave Platform V-CareTM put in place Water injection efficiency improved from 63% to 72% from 2002 to 2003 Plant availability stable at 99.6% for 2003

Case Study 2 – Platform ‘A’ Large tension leg platform located offshore Brazil 280,000BPD sulphate removal plant designed and built by VWS Westgarth Commissioning completed December 2009 V-CareTM contract started immediately

Case Study 2 – Platform ‘A’ The efficiency of the SRU has increased The volume of water injected reflects the reliability of the system and the improvements carried out

Case Study 3 – Platform ‘B’ Large tension leg platform located offshore Brazil 300,000BPD sulphate removal plant designed and built by VWS Westgarth Commissioning completed November 2008 No V-CareTM contract Platform ‘A’ is still in the fabrication yard in the background

Case Study 3 – Platform ‘B’ Veolia left the platform after commissioning From this time, the efficiency of the SRU has been reducing and the volume of water injected has been decreasing

Case Study 4 – FPSO FPSO (Floating Production, Storage & Offloading) facility, located offshore Brazil 250,000BPD sulphate removal plant designed and built by VWS Westgarth Commissioned December 2009 V-CareTM contract begun June 2010

Case Study 4 – FPSO Since June 2010: VWS Westgarth offshore engineers have been giving training to the operators and supervising the SRU operation Following VWS Westgarth technical assistance, the overall deviation of water injected against target has decreased from 23.9% to 6.5%

Case Study 4 – FPSO SRU above benchmark (86.3%) since June 2010

Conclusions From our own experience in providing V-CareTM support we can conclude that: complex process plant must be managed carefully to optimise performance, it is not ‘fit and forget’ the supplier/designer should be able to offer after sales support and has an interest in making sure the plant works well a strong supplier/owner partnership has mutual benefits the lowest cost supplier is usually not the best one, when calculating taking whole life cost factors loss of production is always many times more costly than taking proper care of plant

Thank You Спасибо