11/10/2006Ron Settles MPI-Munich/DESY 11th WP phonemeeting 11 October 2006 1 LCTPC/LPWP-11th phonemeeting –Date 11 October 2006 –Time 7:00 west coast 10:00.

Slides:



Advertisements
Similar presentations
Ties Behnke, LP, EUDET, Germany etc: Status Report. 1 The LP-TPC Fieldcage Project Goal: design, develop and build a field cage for a “Large Prototype”
Advertisements

Amsterdam, March 31, 2003 P. Colas - European R&D for gaseous trackers 1 European gaseous tracking hardware HistoryHistory GEM and MicromegasGEM and Micromegas.
D. Peterson, “Gaseous Tracking”, Review of US Program for Detector R&D for the ILC, Argonne Nat. Lab., Gaseous Tracking Daniel Peterson, Cornell.
1 Pixel readout for a LC TPC LCWA 2009 – Detectors Tracking session 30 September 2009 Jan Timmermans On behalf of the Bonn/CERN/Freiburg/Nikhef/Saclay.
D. Peterson, “Development of a TPC for the ILC”, NSF Site Visit, 18-April of 24 Development of a TPC for the ILC Dan Peterson L. Fields R. S. Galik.
D. Peterson, Cornell Univ., “Round table” 23-Jan-2003 Cornell Linear Collider Detector Research Cornell Interests: The Cornell group proposes to contribute.
28/10/2004 Ron Settles MPI-Munich/DESY Desy Physics Review Committee Meeting October LC-TPC R&D (Goals, Status, Plans) Ron Settles MPI-Munich/DESY.
Carleton University A. Bellerive, K. Boudjemline, R. Carnegie, A. Kochermin, J. Miyamoto, E. Neuheimer, E. Rollin & K. Sachs University of Montreal J.-P.
LC TPC R&D Results Cornell WS July Selected LC TPC R&D Results (DESY RPC) for the Cornell WS July 2003 The LC TPC R&D Groups of the PRC R&D-01/03.
IHEP, Bejing 9th ACFA ILC Physics and Detector Workshop & ILC GDE Meeting The preliminary results of MPGD-based TPC performance at KEK beam.
Gaseous Tracking (TPC) Summary LCWT09 Nov. 5, 2009 LAL, Orsay Takeshi MATSUDA DESY/FLC 1.
Test beams for Introduction and plan for discussion EUDET contract to end Dec ‘Mombusho’ to end…. Canada funding secure till April 2012.
13/09/2006Ron Settles MPI-Munich/DESY 9th WP phonemeeting 13 September LCTPC/LPWP-9th phonemeeting –Date 13 September 2006 –Time 7:00 west coast.
Marseille – January 17 th, TPCs for High Energy Physics David Attié Max Chefdeville,Paul Colas, Arnaud Giganon, Marco Zito,
ILD Large Prototype TPC tests with Micromegas D. Attié, A. Bellerive, P. Colas, E. Delagnes, M. Dixit, I. Giamatoris, A. Giganon J.-P. Martin, M. Riallot,
Large Area Endplate Prototype for the LC TPC 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes, S.
21/12/2006 Ron Settles MPI-Munich TUM Dec ILC, LCTPC Design Issues: R&D Planning 1 Status of the ILC, issues for the LCTPC design and their feedback.
27/11/2006 Ron Settles MPI-Munich Tsinghua Nov LCTPC Design Issues: R&D Planning 1 Issues for the LCTPC design and their feedback to the R&D program.
Snowmass, August, 2005P. Colas - Micromegas TPC beam tests1 A.M. Bacala, A. Bellerive, K. Boudjemline, P. Colas, M. Dixit, K. Fujii, A. Giganon, I. Giomataris,
Stanford, Mar 21, 2005P. Colas - Micromegas TPC1 Results from a Micromegas TPC Cosmic Ray Test Berkeley-Orsay-Saclay Progress Report Reminder: the Berkeley-Orsay-
1 Tests of Carleton and MPI TPC's with a resistive foil and a Micromegas readout at the KEK PS beam Vincent Lepeltier LAL Orsay ECFA Vienna, November 14-18th.
TPC in ILD ILC/ECFA - Warsaw 11 June 2008 Jan Timmermans NIKHEF.
09/11/2006 Ron Settles MPI-Munich/DESY Valencia ECFA WS Nov LCTPC Design Issues: R&D Planning 1 Issues for the LCTPC design and their feedback.
FIRST TEST RESULTS FROM A MICROMEGAS LARGE TPC PROTOTYPE P. Colas (CEA Saclay), on behalf of the LC-TPC collaboration Micromegas with resistive anode:
23/08/2005 Ron Settles MPI-Munich/DESY Snowmass2005 TPC Large Prototype1 TPC R&D, Tasks towards the Design of the ILC TPC LC TPC R&D Groups OUTLINE of.
Beijing, Feb.6, 2007 P. Colas - Micromegas TPC 1 Micromegas TPC studies in a 5 Tesla magnetic field with a resistive readout D. Attié, A. Bellerive, K.
17 October 2003TPC ALEPH TPC Ron Settles, MPI-Munich/DESY1 The Aleph Time Projection Chamber Ron Settles, MPI-Munich/DESY TPC
ILC TPC resolution studies with charge dispersion in MPGDs with a resistive anode Madhu Dixit Carleton University & TRIUMF IPNS KEK 14/05/2005.
25/10/2006Ron Settles MPI-Munich/DESY 12th WP phonemeeting 25 October LCTPC/LPWP-12th phonemeeting –Date 25 October 2006 –Time 7:00 west coast 10:00.
10 Nov Ron Settles MPI-Munich LCTPC advanced-endcap studies for the LOI1 Continuation of LCTPC “advanced- endcap” planning for the ILD LOI ILD Logo.
30/08/2006Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August LCTPC/LPWP-8th phonemeeting –Date 30 August 2006 –Time 7:00 west coast 10:00.
Tracking Group Summary Bruce `Lefty’ Schumm UC Santa Cruz Arlington Linear Collider Workshop January 9-11, 2003.
IHEP, Beijing 9th ACFA ILC Physics and Detector Workshop & ILC GDE Meeting The preliminary results of MPGD-based TPC performance at KEK beam.
2/9/04 1 LBNL LC-TPC Activities ● International LC-TPC R&D ● Physics and Detector Simulations ● Micromegas-based TPC R&D ● US-Japan TPC R&D Proposal ●
A New GEM Module for a Large Prototype TPC: Status and Plans By Stefano Caiazza On behalf of the FLC DESY.
TPC Integration P. Colas (thanks to D. Attié, M. Carty, M. Riallot, LC-TPC…) TPC layout(s) Services Power dissipation Endplate thickness and cost Mechanical.
ILC Detector R&D in Japan Hitoshi Yamamoto Tohoku University.
Takeshi Matsuda LC TPC Collaboration March 5, 2008 TPC Endcap Materials.
Towards a 7-module Micromegas Large TPC prototype 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes,
Lucie Linssen, PH senior staff meeting 23 Nov ’05 slide 1 EUDET Links: Public EUDET pages: Internal EUDET pages:
21/10/2007 Ron Settles MPI-Munich/DESY LCTPC Collaboration Meeting Fermilab 21 October MOA and Addendum General idea: 1. Short (“loose”) MOA giving.
1 Status ‘Si readout’ TPC at NIKHEF NIKHEFMaximilien Chefdeville Auke-Pieter Colijn Alessandro Fornaini Harry van der Graaf Peter Kluit Jan Timmermans.
R&D by LCTPC collaboration Last week: DESY PRC review: Status report:
Micromegas (Ingrid)+TimePix 8-chip modules
11/09/2008 Ron Settles MPI-Munich/DESY LCTPC planning for the LOI1 LCTPC issues for the ILD LOI ILD Logo goes here.
5 February 2007 Ron Settles MPI-Munich/Desy Beijing BILCW07 Tracking Review LCTPC Design, R&D Issues1 TPC R&D for an ILC Detector Beijing Tracking Review.
02/08/2006Ron Settles MPI-Munich/DESY 6th WP phonemeeting 02 August LCTPC/LPWP-6th phonemeeting –Date 2 August 2006 –Time 7:00 west coast 10:00.
Astrophysics Detector Workshop – Nice – November 18 th, David Attié — on behalf of the LC-TPC Collaboration — Beam test of the.
1 TPC Large Prototype (LP) Beam Tests Jan Timmermans NIKHEF/DESY (for LCTPC Collaboration) ALCPG 2011, Eugene.
Gaseous Tracker R&D ILC Detector Test Beam Workshop Fermi National Accelerator Laboratory January 17-19, Madhu Dixit Carleton University & TRIUMF.
4-5 January 2006Jan Timmermans - Introduction1 EUDET JRA2 Brainstorming meeting 4-5 January 2006 Jan Timmermans NIKHEF.
Ron Settles MPI-Munich LCTPC integration model
Large Area Endplate Prototype for the LC TPC
ILC Detector R&D in Japan
Micromegas module for ILC-TPC
Toward the final design of a TPC for the ILD detector
Recents Analysis Results From Micromegas TPC
OUTLINE of TALK Overview of the question Framework, TPC R&D status
Carleton/Montreal/Victoria
WP-conveners 3rd phone meeting
OUTLINE of TALK Overview Motivation, LC-TPC R&D Status
Issues for the LC-TPC design and their feedback to the R&D program
WP-conveners 2nd phone meeting
TPC Paul Colas Technical meeting, Lyon.
LCTPC remarks for closed session
TPC Development at Cornell
Ron Settles MPI-Munich ALCPG09 Testbeam Session
Ron Settles MPI-Munich/DESY TPC Collaboration
EUDET Extended SC meeting 31 August 2009
WP-conveners 1st phone meeting
Presentation transcript:

11/10/2006Ron Settles MPI-Munich/DESY 11th WP phonemeeting 11 October LCTPC/LPWP-11th phonemeeting –Date 11 October 2006 –Time 7:00 west coast 10:00 east coast 16:00 central Europe 23:00 Japan – To join, Phone code 52872#

11/10/2006Ron Settles MPI-Munich/DESY 11th WP phonemeeting 11 October Agenda for 11th WP phonemeeting (in future the meetings will be managed via AGENDA -1.News a. b.Formation of the LCTPC/LP Collaboration c.WWS-R&D-panel tracking review at Beijing -2.WP meeting WP meeting, other contributions (whoever is ready) -3.Future meetings -Eudetmeeting at MPI October -Valencia European WS 6-10 November -Beijing Asian WS February 3-7 February

11/10/2006Ron Settles MPI-Munich/DESY 11th WP phonemeeting 11 October AGENDA -1a.

11/10/2006Ron Settles MPI-Munich/DESY 11th WP phonemeeting 11 October AGENDA -1b.Formation of the LCTPC/LP collaboration -The proposed structure is shown on the next foil #5. -The Collaboration-Board (CB) of group representatives is complete for the groups on foil # 6 -Names of both CB and TB are shown on foils #7,8. -A proposal by the interim-SP for the next steps was sent to the CB and TB, a first meeting held on and a second collaboration phonemeeting held on It was decided at the first collaboration phonemmeeting that each region should independently select a Regional Coordinator, (RC) via vote by that region’s CB members, to replace the interim SPs, and that the 3 Regional Coordinators would choose a chairperson who is the sole Spokesperson. The status is: --America: RC is Dean Karlen --Asia: the search committee, Keisuke Fujii and Angelina Bacala, establised the RC candidates who were be voted on by the Asia CB members. Result: RC is Takeshi Matsuda --Europe: the search committee, Vincent Lepeltier and Klaus Desch, will find the RC candidates who will be voted on by the European CB members.

11/10/2006Ron Settles MPI-Munich/DESY 11th WP phonemeeting 11 October Formation of the LCTPC/LP collaboration The revised structure is to have: 1)Three coordinators, one chosen by each region. These regional coordinators (RC) will work with the following two boards: 2)The collaboration board (CB), consisting of one representative from each group or set of groups (the group leader, principle investigator or other chosen member). Each CB member looks after the resources for its group(s) (money and people). 3)The technical board (TB), consisting of the existing workpackage (WP) conveners. The TB will ensure the technical integrity of their WP and compatibility with other WPs while maintaining close contact with the collaboration. The groups and names of CB and TB members are listed in the next 3 slides.

11/10/2006Ron Settles MPI-Munich/DESY 11th WP phonemeeting 11 October LCTPC/LP Groups (19Sept06) Americas Carleton Montreal Victoria Cornell Indiana LBNL Purdue (observer)Europe LAL Orsay IPN Orsay CEA Saclay AachenBonnDESY U Hamburg FreiburgMPI-Munich TU Munich (observer) RostockSiegenNIKHEFNovosibirskLundCERNAsiaTsinghuaCDC:HiroshimaKEK Kinki U SagaKogakuin Tokyo UA&T U Tokyo U Tsukuba Minadano SU-IIT Other groupsMIT MIT (LCRD) Temple/Wayne State (UCLC) YaleKarlsruhe UMM Krakow Bucharest

11/10/2006Ron Settles MPI-Munich/DESY 11th WP phonemeeting 11 October The CB members are: ================== --Americas- Carleton: Madhu Dixit Montreal: Jean-Pierre Martin Victoria: Dean Karlen Cornell: Dan Peterson Indiana: Rick Van Kooten LBNL: Mike Ronan --Asia- Tsinghua: Yuanning Gao For the following CDC groups: Akira Sugiyama Hiroshima KEK Kinki Saga Kogakuin Tokyo U A&T U Tokyo Tsukuba Mindanao

11/10/2006Ron Settles MPI-Munich/DESY 11th WP phonemeeting 11 October Europe- LAL Orsay/IPN Orsay: Vincent Lepeltier CEA Sacly: Paul Colas Aachen: Stefan Roth Bonn: Klaus Desch Desy/UHamburg: Ties Behnke Eudet: Joachim Mnich Freiburg: Andreas Bamberger MPI-Munich: Ariane Frey Rostock: Henning Schroeder (deputy: Alexander Kaukher) Siegen: Ivor Fleck Nikhef: Jan Timmermans Novosibirsk: Alexei Buzulutskov St.Peterburg: Anatoliy Krivchitch Lund: Leif Jonsson CERN: Michael Hauschild (deputy: Lucie Linsen) --Groups with Observer status- TU Munich: Bernhard Ketzer Purdue: Ian Shipsey --Since replies are still missing from: MIT Yale Karlsruhe Krakow Bucharest, these groups are included as “observer groups” at the moment

11/10/2006Ron Settles MPI-Munich/DESY 11th WP phonemeeting 11 October The TB members are: ================== 1) Workpackage Mechanics Ron Settles a) LP design (incl. endplate structure) Dan Peterson b) Fieldcage, laser Ties Behnke c) GEM panels for endplate Akira Sugiyama d) Micromegas panels for endplate Paul Colas e) Pixel panels for endplate Jan Timmermans f) Resistive foil for endplate Madhu Dixit 2) Workpackage Electronics Leif Jonsson a)"Standard" RO/DAQ sytem for LP Leif Jonsson+Postdoc b) CMOS RO electronics Harry van der Graaf c) Electronics for LCTPC Luciano Musa 3) Workpackage Software Peter Wienemann a) LP SW, simul./reconstr.framework Peter Wienemann b) TPC simulation, backgrounds Stefan Roth c) Full detector simulation Keisuke Fujii 4) Workpackage Calibration Dean Karlen a) Field map Lucie Linssen b) Alignment Takeshi Matsuda c) Distortion correction Dean Karlen d) Radiation hardness of materials Anatoliy Krivchitch e) LP Gas/HV Eudet Postdoc

11/10/2006Ron Settles MPI-Munich/DESY 11th WP phonemeeting 11 October AGENDA -1c.Tracking review at Beijing: ………some info………

11/10/2006Ron Settles MPI-Munich/DESY 11th WP phonemeeting 11 October AGENDA -2. WP meeting (Martin GemLP)

11/10/2006Ron Settles MPI-Munich/DESY 11th WP phonemeeting 11 October AGENDA -2. WP meeting (Martin-GemLP w/gate)

11/10/2006Ron Settles MPI-Munich/DESY 11th WP phonemeeting 11 October AGENDA -2. WP meeting (Martin-MicromegasLP)

11/10/2006Ron Settles MPI-Munich/DESY 11th WP phonemeeting 11 October AGENDA -2. WP meeting (Martin-MicromegasLP w/gate)

11/10/2006Ron Settles MPI-Munich/DESY 11th WP phonemeeting 11 October AGENDA -2. WP meeting (Martin-LPelectro)

11/10/2006Ron Settles MPI-Munich/DESY 11th WP phonemeeting 11 October AGENDA -2. WP meeting (Yannis idea)

11/10/2006Ron Settles MPI-Munich/DESY 11th WP phonemeeting 11 October AGENDA -2. WP meeting (Leif & Dan on connectors, Peter on the field cage -> see the meeting summary).

11/10/2006Ron Settles MPI-Munich/DESY 11th WP phonemeeting 11 October AGENDA -3.Future meetings There are (in addition to bi-weekly phonemeetings): -Eudet annual meeting MPI-Munich (18-20 October 2006) with website: The LCTPC CB/TB meeting will be at 10:30 on Wednesday 18 Oct., before the start of the Eudet one at 14:00. -European LC workshop Valencia (6-10 November 2006), see -Asian LC workshop Beijing (4-7 February 2007) Website:

11/10/2006Ron Settles MPI-Munich/DESY 11th WP phonemeeting 11 October AGENDA -4.AOB

11/10/2006Ron Settles MPI-Munich/DESY 11th WP phonemeeting 11 October Back up slides, for reference Back up slides, for reference

11/10/2006Ron Settles MPI-Munich/DESY 11th WP phonemeeting 11 October Akira Sugiyama – GLD DOD

11/10/2006Ron Settles MPI-Munich/DESY 11th WP phonemeeting 11 October

11/10/2006Ron Settles MPI-Munich/DESY 11th WP phonemeeting 11 October RS study - LDC DOD - together with Joel Pouthas Philippe Rosier (IPN Orsay)

11/10/2006Ron Settles MPI-Munich/DESY 11th WP phonemeeting 11 October

11/10/2006Ron Settles MPI-Munich/DESY 11th WP phonemeeting 11 October

11/10/2006Ron Settles MPI-Munich/DESY 11th WP phonemeeting 11 October

11/10/2006Ron Settles MPI-Munich/DESY 11th WP phonemeeting 11 October

11/10/2006Ron Settles MPI-Munich/DESY 11th WP phonemeeting 11 October Aleph Endplate

11/10/2006Ron Settles MPI-Munich/DESY 11th WP phonemeeting 11 October

11/10/2006Ron Settles MPI-Munich/DESY 11th WP phonemeeting 11 October

11/10/2006Ron Settles MPI-Munich/DESY 11th WP phonemeeting 11 October

11/10/2006Ron Settles MPI-Munich/DESY 11th WP phonemeeting 11 October

11/10/2006Ron Settles MPI-Munich/DESY 11th WP phonemeeting 11 October Some features Zigzag structure prevented loss of tracks > θ~22° Sectors mounted from inside using a “handling tool” to minimize the dead space between sectors. This straight-forward operation which was performed at least 30 times during the lifetime of Aleph. Alu sandwich structure stiff, lightweight to - contain 7mb overpressure - provide forced-air thermal insulation between electronics and TPC volume Water cooling of 1kW electronics/side in addition - 22K channels per side Combination water/air cooling blocked all heat to TPC Overall thickness ~ 25%Xo (average) w/o cables Bending of endplate -20 micrometers due to 7mb overpressure - 5 micrometers due to wire tension

11/10/2006Ron Settles MPI-Munich/DESY 11th WP phonemeeting 11 October R&D Planning 1) Demonstration phase –Continue work with small prototypes on mapping out parameter space, understanding resolution, etc, to prove feasibility of an MPGD TPC. For CMOS/Si-based ideas this will include a basic proof-of-principle. 2) Consolidation phase –Build and operate the LP, large prototype, (Ø ≥ 75cm, drift ≥ 100cm), with EUDET infrastructure as pedestal, to test manufacturing techniques for MPGD endplates, fieldcage and electronics. Design is starting---building and testing will take another ~ 3 years. 3) Design phase –After phase 2, the decision as to which endplate technology to use for the LC TPC would be taken and final design started.