The David W. York Award JEA South Grid Reuse System Tom Bartol, P.E.

Slides:



Advertisements
Similar presentations
Decentralised Wastewater Management
Advertisements

LEE COUNTY UTILITIES DIVISION Integrated Water Resources Master Plan
Funding for Municipal Infrastructure Ruth Noemí Colón Acting Secretary of State George Stafford Deputy Secretary of State Public Finance and Management.
Water Services Department Arizona Mexico Commission Bi-National Meeting March 9-11, 2008 David Cavazos Deputy City Manager Water Services Department Arizona.
JULY BUDGET WORKSHOP NO FISCAL YEAR ENTERPRISE FUNDS Innovation will serve to keep the plan in the forefront of all that we do. Our actions.
Cuba’s Future Development Needs, Funding Models, and Alternatives. A Perspective of the Operation of a Cuban Water & Sewer Utility. Eduardo Vega-Llort,
IBM Smarter Cities Challenge City of Tucson Award Recipient for 2013 November 14, 2012.
Dean Marriott Environmental Services Director Janet Gillaspie Oregon ACWA Executive Director.
1 Nassau County NY United Water Partnership The US Conference of Mayors Mayors Water Council April 30 – May 1, 2015 Rob Walker Chief Deputy County Executive,
The Status of Water Services in County Galway A presentation to the Joint Committee on Environment, Transport, Culture and Gaeltacht 27 th September 2011.
Utility Asset Management Application on Pump Stations Jens Sapin, P.E. Environmental Services - Facility Compliance and Incident Response Utility Asset.
Safe Use of Wastewater in Agriculture UN-Water at IFAT 2012 Water reuse in Agriculture in the Arab region Situation, needs and challenges Eng. Khaldon.
City of Savannah Water, the Lifeline of the Community.
Rule 62-40, F.A.C. – What is it? The Water Resource Implementation Rule (State Water Policy). Required by Sec , F.S. Goals, objectives and guidance.
Sithe Global Power, LLC Toquop Energy Project. A 750 MW Coal fired electric generating plant Located 12 miles northwest of Mesquite, NV in Lincoln County.
Michael Tamblin, P.E., BCEE Stearns & Wheler, LLC Protecting and Enhancing the Ramapo Watershed – A Designated Sole Source Aquifer Supplying New York and.
The Need for Electric Transmission Improvements in Dane County.
VOLUSIA COUNTY PUBLIC WORKS DEPARTMENT WATER RESOURCES & UTILITIES DIVISION Mike Ulrich, Director Mike Ulrich, Director.
B-WSFWP-1 Water Supply Facilities Work Plan (WSFWP) Adoption Hearing May 19, B-WSFWP-1 Water Supply Facilities Work Plan (WSFWP) Adoption.
NARUC Summer Committee Meetings Committee on Water Water Supply Planning: East, West, North and South July 17,2007.
City of Fort Collins Wind Power Program March 24, 2004 John Phelan, PE Energy Services Engineer.
South County Reclaimed Water Partnership South County Reclaimed Water Partnership Palm Beach County Water Utilities Department Brian Shields,
every five years water and sewerage companies submit their investment plans to the industry regulator Ofwat this is known as the ‘Price Review’ the next.
City of Renton, WA Water Use Efficiency Margaret Ales PNWS – AWWA CONFERENCE MAY 1, 2008 Copyright © 2008 by R. W. Beck, Inc. All Rights Reserved. Opportunities,
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Withlacoochee Regional Water Supply Authority Water Supply Plan Update - Progress Report #3 May 15 – June 18.
Florida Biosolids: A Renewable Resource For A Sustainable Florida Amir A. Varshovi, Ph.D. GreenTechnologies, LLC Gainesville, FL A Presentation to: Sierra.
Rulemaking for Central Florida Coordination Area Coordinated Rulemaking by the South Florida, St. Johns River and Southwest Florida Water Management Districts.
Water Use and Groundwater. Supply is Dwindling, Demand is increasing population growth industrial development expansion of irrigated agriculture. Irrigation.
League of Cities and Towns August , 2015 Ensuring a Secure Water Future.
Slide 1 Fort Detrick Sustainability Planning Workshop #1 – Out Brief 1 Jul 08.
South Orange Coastal Ocean Desalination (SOCOD) Project Dana Point/Doheny Beach, California November 2010 Status.
Investing In Our Future. Statement from Mayor Tom Murphy “The Gillette Regional Water Supply Project is essential for quality of life and economic development.
Transmission Issues & Renewables Perspectives of a Wind Developer.
Texas Innovation Water 2010 Seawater Desalination What is the benefit to the State from implementing the Brownsville Seawater Demonstration Project?
Maximizing Water Supply Sustainability for the Goleta Valley Ryan Drake Water Supply and Conservation Manager 2015 Central Coast Sustainability Summit.
1 Commodity Cost Adjustment Clauses Steve L. Klick Manager-Rates and Regulation Pennsylvania American Water NARUC Staff Committee on Accounting and Finance.
1 NORTH VALLEY REGIONAL WATER AND WASTEWATER PROJECTS MEETING OF THE NEW MEXICO-TEXAS WATER COMMISSION May 19, 2005.
POTABLE REUSE THE ALTERNATIVE WATER SUPPLY. Florida Section WateReuse Association November 9, 2015 Chuck Drake, PG.
Water-Global Issue 884 million people around the world lack access to clean drinking water.
EXPANSION OF BRUNSWICK COUNTY’S NORTHWEST WATER TREATMENT PLANT Public Utilities.
Using New Jersey’s State Revolving Fund to Reduce Combined Sewage Flooding in Camden City Andrew Kricun, P.E., BCEE Executive Director / Chief Engineer.
CALIFORNIA ENERGY COMMISSION Why Peak Demand Offset Measures Are Necessary When There Is “Enough” Energy Lorraine White Advisory to Vice Chair Pfannenstiel.
Stone Brewing, Co. Brewing for Quality during a Drought! Urban Water Institute Spring Water Conference February 11, 2016.
Building New and Sustainable Water Resources for Los Angeles Urban Water Institute Spring Conference February 2016 February 2016 Martin L. Adams, P.E.
Water Supply Facilities Work Plan Amendment. Overview Background Statutory Requirements Meeting the Requirements Identified Issues Timetable.
- DISCOVER THE DIFFERENCE - Florida’s Natural Energy - DISCOVER THE DIFFERENCE -
Began funding reclaimed projects in projects funded 325 projects completed $435M leveraged $1 Billion 970 miles of pipelines 248 MGD reuse capacity.
Transportation Possible Goal Provide convenient alternative transportation options to dramatically reduce our City’s fuel consumption. Example Actions.
NAS JACKSONVILLE WASTEWATER REUSE PROJECT
What are they and how are they calculated? May 2015.
DEPARTMENT OF LAND RESOURCE MANAGEMENT  Waste Stabilization Ponds – 56 communities, Darwin (+CAS), Palmerston, Katherine, Tennant Creek,
Town of Davie Utilities Department Renuka M. Bajnath John McGeary.
Miami-Dade Water & Sewer Department Miami-Dade Water and Sewer Department |  1   Reuse, Every Drop Has Value Seminar FPL JPA.
JEA’s Initiatives and Capital Improvements Program
Progressing a Single Water Utility Approach
Davie Green Water Project
Rehabilitation Program impact on Sewer Management
Florida and Reclaimed Water
Reuse and Wastewater Disposal
Parkland/Brookdale Interceptor Replacement
Smart Cities Uroš Merljak.
Strategic Energy Plan.
Background Broward County currently operates a 10 MGD reuse facility located at the North Regional Wastewater Treatment Plant. Customers include commercial,
New England Economic Partnership James Daly Vice President Energy Supply Energy Market Perspectives Reliable Energy, Competitive Prices and.
City of Sunrise Wastewater Reuse Program
Tennessee Valley Authority – Energy Initiatives and Challenges
Water Supply Planning for the Twin Cities Metropolitan Area
Kerry Kates, P.E. Florida Fruit & Vegetable Association
August 30, 2019 Robert Beltran, PE , BCEE
Presentation transcript:

The David W. York Award JEA South Grid Reuse System Tom Bartol, P.E.

JEA South Reuse Grid Wins 2015 David W. York Award! Co-winner for largest (>15MGD) category Florida’s most prestigious reuse award

Background JEA given responsibility for City of Jacksonville’s water and sewer program in 1997 System suffering from lack of resources – Required significant investment in capital to address deficiencies To date, JEA has invested almost $600M in system – Including over $85M in reclaimed water system

Background/Challenges JEA Began its reclaimed water program in 1999 Reuse Challenges: – Wastewater system already mature – Plants designed only for surface discharge – Service areas built out – New development occurring far from treatment plants Regional hydrogeology prevents some popular reuse solutions like rapid infiltration basins

Background/Solutions Filtration and high level disinfection systems were added to existing plants Significant transmission system needed to transport reuse water to development areas – Fortunately, JEA is a water/sewer/ELECTRIC utility – Able to use electrical transmission corridors to run reuse mains w/ substantial savings

So JEA built a 26 mile transmission system constructed to send reuse from Arlington East WRF to Northern St. Johns Co. Served Bulk Commercial Customers along the way – Golf Courses – UNF – Deerwood Park

Best Laid Plans….. By 2007, JEA was primed to reap the benefits of an exploding real estate market in Northern St. Johns County And then….

Where is the South Grid now? Infrastructure now in place as development renews South Grid made up of 4 interconnected plants 7.1 MGD in Reuse Total of over 6000 commercial and residential connections

So How Far Have We Come? JEA’s Reuse System in 2000

TODAY’S RECLAIMED WATER SYSTEM WELL POSITIONED TO SERVE GROWTH Miles of North/South Transmission Pipe  All Major St. Johns Co. DRI’s piped for reuse  Adding over customers/yr.  Growth Escalating

Benefits of JEA’s Reuse System Growth of JEA’s reuse system provides dual benefits: – Offsetting withdrawals from the Floridan Aquifer – Reducing discharges to the St. Johns River In conjunction with treatment upgrades, discharge of TN to the St. Johns has been reduced from1400 Tons Tn/yr. to 600 Tons TN/yr

JEA’s Discharge of Tn to River vs. Population

SJRWMD assistance often needed to get larger users to connect Developer resistance Duval County Ordinance requires connection if available Adjoining counties based on development conditions Condition of potable water service within “Reclaimed Water Service Areas”. Maturity continuum issues Private wells 13 Building Community Reclaimed Water Challenges Getting (and Keeping) Those Connections

Summary/Takeaways As a community-owned, not-for-profit utility, JEA is committed to meeting its customers’ reuse needs in a manner that is environmentally and economically sustainable. JEA has invested over $85 million to build one of the largest interconnected reclaimed water systems in the state. The continuing development of JEA’s reclaimed water system has allowed JEA to serve the needs of growing communities while: – Minimizing withdrawals from the Floridan Aquifer and promoting efficient use of fresh groundwater – Reducing the discharge of nutrients from JEA’s wastewater plants to the St. Johns River.