+132.0m2 - 33.7m2 + 98.3m2 EC Operational Spares: Racks + shelves = 3.6m x 2.5m FPS drawings: 6m x 2.5m (move to 865 S-412?) Additional space attribution.

Slides:



Advertisements
Similar presentations
Lesson 9 Design & Construction of Food Premises & Equipment
Advertisements

Objective: Develop plans for kitchen cabinets.
Classroom 1. Mission San Luis Rey.
Heritage Hall/Rare Book Collection Renovations, 2012.
St. Charles Borromeo  Location: Kettering, OH  Grades: Pre-K – 8  Students: ≈ 510  Staff: 2 non-certified, job share  Schedule: fixed and flexible.
Space Reallocation Update October, Summary “Almost” on time “Almost” on time Definitely under budget Definitely under budget Thanks to all for their.
Remove shelving Reorganize cabinets to make leg holes for 3 pairs of students per side Repair holes and paint counters and cabinets Remove shelving Reorganize.
© El-Helw Guy Nickerson Voicu | ECE4884L01WS3 1 The Atlanta Day Shelter for Women and Children Technical Infrastructure Improvement Strategy Sarah El-Helw.
Information and Site Visit for tender: “supply and installation of furniture and related services” EIOPA/OP/50/2014 Frankfurt, 6 June 2014.
Housing and Equipment At some time in their teaching careers, most music educators will be called upon to offer suggestions and comments on a construction.
E122 E123 E124 E125 E126 E127 E128 E129 E130 E131 E135 E136 E137 E138 E136 Solar Support Centre Desks for 4 people + connection to Bruce’s Workbenches.
By Taylor Gardner  This is a proposal for a computer Network spanning 3 buildings. The equipment selected is for a typical network for a small to.
Managing a computerised PO Operating environment 1.
Thomas Baron - IT Gregory Godineau - GS Conference rooms service Issues with physical keys Requirements Solution Pilot and Deployment Alternatives.
The Oaks Public School Proposed Library refurbishment.
PH-DT Infrastructure Investments M.Capeans SPOB meeting CERN, 20/3/14.
NOTE: Availability NOT guaranteed. Please call ahead to verify building availability. Purchase and Lease Options Available. Visit our Online Showroom at.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Building the Info-structure for Advanced Blended Learning: Lewis and Clark as Foundation for Land Power University.
IMC PHASE III PROPOSAL Presented by IMC/LIBRARY/LEARNING RESOURCES DEPARTMENT Submitted on October 18, 2004.
Scholarship Needham Public Schools Proposed Needham High School Cafeteria & Classroom Expansion Presented to Board of Selectmen April 15, 2015.
CBPA Computer Lab Redesign Development of the Career and Placement Center Ted Strickland Department of Computer Information Systems March 21, 2005 DRAFT.
ACU LIBRARY Click to view the slides ….. B Level – Ground floor Circulation Reference Information Commons Library Staff Toilets.
SunTrust Tenant Improvements June 30, Background Current Situation Proposed Work Cost of Proposed Work Questions Presentation Outline.
Welcome to CP2011 Perugia, September 2011.
Elevator Installation, Window Replacement, HVAC, Sprinklers, Block wall skimcoating (resident rooms & 1 st through 4 th floor resident corridors). New.
ITS Tutoring Testing Staff Rm Library Storage Janitor Tiospaye Elev Tiospaye Workroom / Files IE Secretary Mfg E Lab HFE Lab Design Studio Design Studio.
ST. PETER CLAVER SCHOOL: THE NEW VISION! A FIVE YEAR VISION.
1 NEW FAIRFIELD FREE PUBLIC LIBRARY Renovation Project
1 1/13/2011 PHENIX WEEKLY PLANNING 1/13/2011 Don Lynch No Meeting Today Due to snow shortened work week, today’s planning meeting has been cancelled. Slides.
ALICE space in P2 ALICE TC (W.Riegler, A.Tauro) SPOB meeting –
B508 and 275 Magdalena Kowalska. b275 2 AEGIS laser lab ASACUSA test setup g-BAR? Storage of big parts, test stands? Test setups SSP, detector labs Electronics.
2 3 4 Office equipment can include:  Computers and computer peripherals  Telephone, facsimile  Photocopies  Presentations equipment  Furniture.
Space, labs & testing equipment Paolo Petagna Meeting on CO 2 Cooling CERN 04 February 2015.
Setting up the e-Learning area Abingdon Time to play Summer 2010.
Managing Project Funding Changes David Troxtell Program Management Office March 14, 2007.
POV Renovations November 14,2014. Repairing the East Wall.
SEB Room Allocation Plan. Civil Engineering Lab Technician Offices Additive Engineering Research Labs Open Plan High Bay Sample Preparation Lab Chemistry.
SDC Update June 5, SDC Update – June 2012 Investment Plans submitted to OCIO for approval – Core Network – Firewall – Storage OB2 Heat Reduction.
JulieStevens BA (Hons) Interior Design, FRSA.  Where do you work?  Think about that space Write down 3 things that come to mind  How does it make you.
Improvements to a recreation center near you Julia DelNero.
Extra Slides to Accompany: SEEM 94 Calibration to Single Family RBSA Data Analysis and proposed actions Regional Technical Forum May 21, 2013.
PSB Injection Overview + Specification changes ABT LIU Project Review Wim Weterings.
Your school is a learning centre, and there is lots to learn!
Welcome boys and girls to your Computer Lab!. Today we will be working on Learning about Computer Equipment.
TE-MPE-EM Design Office William Billereau 29/11/
Return to Home! Go To Next Slide! Return to Home! Go To Next Slide!
SCX5 – Proposed New Intermediate floor over existing CMS Rack Room J.Osborne CEMESTE 20 Feb 2008.
1 LHCb needs to space for upgrade activities and maintenance of the existing detector: detector R&D, detector module production, detector assembly, storage.
1. 2 PX ‘material’ shaft LHCb workshop Visitor area Control room SG8 Gas building Meeting room and offices Storage Access to UX.
Tips On Selecting Wire Shelving Racks
How to Build a LAN Last Update Copyright 2007 Kenneth M. Chipps PhD 1.
Rack Design Proposal as of 01/03/2013
Building 314 (and neighboring buildings): current situation
VISIT OUR WEBSITE- ox-printer-repair.
VISIT OUR WEBSITE-  vetti-printer-repairhttps:// vetti-printer-repair.
printer-copier-repair.
GM Dealer Equipment Program
Located on the first floor of Nitschke Hall Room 1010
One point Grid Method.
C.M. Scullion Associates Ltd
Floor Plan A horizontal section view of a structure taken about 4’ from floor level, It shows all exterior and interior walls, doors, windows, patios,
ВОМР Подмярка 19.2 Възможности за финансиране
Споразумение за партньорство
A Retrofit of existing site Process to Date
WELCOME.
Pillager Public School District Community Survey Results
Wates CBE Learning Operation defects: Snag sheet slide presentation
Objective: Develop plans for kitchen cabinets.
Discussion at 21 September 2016 IWG meeting
Presentation transcript:

+132.0m m m2 EC Operational Spares: Racks + shelves = 3.6m x 2.5m FPS drawings: 6m x 2.5m (move to 865 S-412?) Additional space attribution in B865 (not yet approved)

FPS Storage EC software lab EC Lab. BEC Lab. CEC Lab. AEC Power Lab. EC Storage Mechanical workshop Conference Room Printers/ Photocopiers CAD Ofice D D A EC Monitoring Room SLSecretariat SLGL SL Production Office 3 FSU SL CAD Office Present TE-ABT distribution in B865

EC software lab EC Lab. BEC Lab. CEC Lab. AEC Power Lab. EC Storage Mechanical workshop Conference Room Printers/ Photocopiers D D A EC Monitoring Room 19.9 SLSecretariat SLGL SL Production Office 3 FSU SL CAD Office Proposed TE-ABT distribution in B865 22

Proposed TE-ABT-EC reconfiguration in B865 CAD Office new HT Test Cages with temporary equipment test bench storage Operational equipment returns, repair and calibration Operational Spares

CAD Office 1 x STAFF (1 x STD) CAD Office 1 x STAFF CAD Office 3 x FSU 1 x TTE CAD Office 1 x STAFF 1 x STD 17.7 m216.9 m2 32 m m Cupboard wall to ceiling (sliding doors) Preferred Option, 7 people in 2-B06 would be very tight considering the frequent visits and discussions in the CAD office (especially Remy and Patrick)

35.2 CAD Office (Remy) 1 x STAFF (1 x STD) CAD Office (Wim) 1 x STAFF CAD Office (Stephane) (Yves) (Gregory) (Remi) 3 x FSU 1 x TTE CAD Office (Patrick) (Lorena) 1 x STAFF 1 x STD 17.7 m216.9 m2 32 m m Cupboard wall to ceiling (sliding doors) Preferred Option (with names), 7 people in 2-B06 would be very tight considering the frequent visits and discussions in the CAD office (especially Remy and Patrick)

CAD Office 1 x STAFF CAD Office 3 x FSU 1 x TTE 1 x STD CAD Office 2 x STAFF 16.9 m2 32 m m Cupboard wall to ceiling (sliding doors) Alternative Option, 7 people in 2-B06 would be too tight considering the frequent visits and discussions in the CAD office (especially Remy and Patrick)

35.2 CAD Office (Wim) 1 x STAFF CAD Office (Stephane) (Yves) (Gregory) (Remi) (Lorena) 3 x FSU 1 x TTE 1 x STD CAD Office (Patrick) (Remy) 2 x STAFF 16.9 m2 32 m m Cupboard wall to ceiling (sliding doors) Alternative Option (with names), 7 people in 2-B06 would be too tight considering the frequent visits and discussions in the CAD office (especially Remy and Patrick)

6m x 7.5m B355: LIU-PSB Montage a Blanc