MS Activities during TS#3 Courtesy of JC, Kajetan, Arek, Jacek, Yan, Richard and Pierre.

Slides:



Advertisements
Similar presentations
Development Life Cycle using Visual Studio Team Edition for DB Professionals Richard Fennell Engineering Director SQLBits II Birmingham 1 st March 2008.
Advertisements

SUS Feature Pack for SMS Michel Jouvin LAL / IN2P3
Upgrading Best Practices. Type of upgrade Hotfix Security fix Service pack New release.
“LHC Controls for Sector Test” Planning SPS Extraction Kicker and Septa LHC Injection Kicker and other equipment (beam stoppers, dumps,...) Etienne CARLIER.
1 SDMX Reference Infrastructure (SDMX-RI) Work in progress, status and plans Bengt-Åke Lindblad, Adam Wroński Eurostat Eurostat Unit B3 – IT and standards.
1 15 April 2010: Post Mortem Analysis by M.Zerlauth Automatic POWERING EVENT Analysis Adam, Arek, Gert-Jan, Ivan, Knud, Hubert, Markus, Nikolai, Nikolay,
Adding scalability to legacy PHP web applications Overview Mario A. Valdez-Ramirez.
Safe Machine Parameters General Machine Timing Cross-Check Safe Machine Parameters General Machine Timing Cross-Check 9 th May v3.
 M.A - BIS Workshop – 4th of February 2015 BIS software layers at CERN Maxime Audrain BIS workshop for CERN and ESS, 3-4 of February 2015 On behalf of.
BE-CO work for the TS Nov 8 Nov 11P.Charrue - BE/CO - LBOC1.
Injection Test Meeting Tuesday 26th August Controls Issues/Results Injection Kickers Etienne CARLIER AB/BT.
Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
EGEMS A Dedicated Web Based System for Ground Water Data Processing Analysis and Storage.
TE-MPE-TM 02/08/2012, TE-MPE-MS section RENOVATION OF SPS MAGNET INTERLOCK SYSTEM 1 CURRENT SITUATION CONSOLIDATION PROPOSALS Y.Bastian, P.Dahlen, R.Mompo,
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
Pro Exchange SPAM Filter An Exchange 2000 based spam filtering solution.
Advanced Deployment Topics – MSI Enhancements Om Sharma Program Manager, Windows Installer Microsoft Corporation.
© 2006, Cognizant Technology Solutions. All Rights Reserved. The information contained herein is subject to change without notice. Automation – How to.
CERN Machine Protection – A Future Safety System? Introduction 1 SMP = Safe Machine Parameters System which receives accelerator.
TE-MPE-TM 09/08/2012, TE-MPE-MS section WIC: Overview of on-going projects + Outlook to LS1 activities: - Short introduction to WIC systems - Booster renovation.
Development Strategies for Web Applications Jonathan Babbage National Superconducting Cyclotron Laboratory.
XA R7.8 Link Manager Belinda Daub Sr. Technical Consultant 1.
The huge amount of resources available in the Grids, and the necessity to have the most up-to-date experimental software deployed in all the sites within.
Tuesday 3 rd May 7:30 Access in the SPS to replace injection kicker magnet terminating resistor after radiation cool down overnight 9:45 probes injected.
DB2 Universal Database Confidential | July 2012 | India Software Lab Click to add text © 2012 IBM Corporation An End to End Windows Automation Framework.
B. Todd et al. 25 th August 2009 Observations Since v1.
Post Mortem Collimators and Movable Objects Michel Jonker Post Mortem Workshop Cern, 16 & 17 January 2007.
LHC BLM Software revue June BLM Software components Handled by BI Software section –Expert GUIs  Not discussed today –Real-Time software  Topic.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
1 Beam Dumping System MPP review 12/06/2015 Jan Uythoven for the ABT team.
Eva Barbara Holzer MPP, CERN July 31, Eva Barbara Holzer, CERN MPP CERN, July 31, 2009 PROCEDURES FOR CHANGES TO BLM SYSTEM SETTINGS DURING LHC.
Online System Status LHCb Week Beat Jost / Cern 9 June 2015.
Beam Instruments PSB + Transfer Lines B. Mikulec, J-F. Comblin.
BWS PS and SPS problem report J. Emery
Review of MPE activities during LS1 and outlook for LS2/LS3 View from BE/CO V.Baggiolini, M.Vanden Eynden On behalf of the BE/CO APS, DA, DO and FE Sections.
Weekly Report By: Devin Trejo Week of July 13, 2015-> July 19, 2015.
Automated tests CustomWare.Net. Goals Quality Finding problems before delivering Stability Upgrade projects Downgrade Refactoring Deacreasing of manual.
1 15 April 2010: Post Mortem Analysis by M.Zerlauth Automated analysis of Powering Events – Progress update.
TE-MPE-TM 27/06/2012, TE-MPE-MS section SPS RENOVATION Final design and status 1 R.Mompo, P.Dahlen, Y.Bastian, I.Romera, M.Zerlauth.
LHC ACCESS SYSTEM 1 EDMS: January 2008 Global Tests of the LHC Access system Outcome P. Ninin, T. Petterson, S Grau, T. Ladzinski 18 th January.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
YETS status report TCM Francesco castronuovo.
CERN - IT Department CH-1211 Genève 23 Switzerland Operations procedures CERN Site Report Grid operations workshop Stockholm 13 June 2007.
MPP 4 th March - 1v0 CERN MPP CERN MPP SMP Team 3.
 The AccTesting Framework - Overview & Visions Kajetan Fuchsberger TE-MPE TM, On behalf of the TE-MPE-MS Software Team: M.Audrain, J.-C. Garnier,
MPE Workshop for LS1 Summary of Global Activities Thanks to Speakers Arjan Verweij Hugues Thiesen Zinur Charifoulline Kajetan Fuchsberger.
TE/TM 30 th March - 0v1 CERN MPP SMP 3v0 - Introduction 3 *fast *safe *reliable *available generates flags & values.
E. Hatziangeli – LHC Beam Commissioning meeting - 3 rd March 2009.
 Automation Strategies for LHC System Tests and Re-Commissioning after LS1 Kajetan Fuchsberger TE-MPE LS1 Workshop On behalf of the TE-MPE-MS Software.
MPE Workshop 14/12/2010 Post Mortem Project Status and Plans Arkadiusz Gorzawski (on behalf of the PMA team)
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
EzLogin Premium Extension Overview EzLogin Premium lets your customer login with any of the below social accounts in your webstore  Facebook  Twitter.
 TE-MPE-PE Clean code workshop – R.Heil, M.Koza, K.Krol Introduction to the MPE software process Raphaela Heil TE-MPE-PE Clean code workshop - 9 th July.
AWAKE p+ beam line HWC C. Bracco, J. Schmidt Acknowledgment: MCS, EPC, MPE, SPS-OP, BI, ABP (survey),STI, EA, ACE, RP.
H2LC The Hitchhiker's guide to LSA Core Rule #1 Don’t panic.
R. Denz, A. Gomez Alonso, AT-MEL-PM
Injectors BLM system: PS Ring installation at EYETS
LHC Beam Dumping System Reliability Run Summary
EC Activities Status for the LIU
Castor services at the Tier-0
PS Booster Hardware Tests & Cold Check-out planning 16th of March 2017
J. Uythoven for the MPE-MI & MS Teams
Capacitive pick-up on MKP: why, when, who, resources, others
WIC deployment and commissioning in HIE-ISOLDE
FMSCUG 1803.
Tuesday TOTEM and transverse loss map (1) OK
Interlocking of CNGS (and other high intensity beams) at the SPS
1v1.
The LHC Beam Interlock System
SPS Injection BIS - Draft requirements
Presentation transcript:

MS Activities during TS#3 Courtesy of JC, Kajetan, Arek, Jacek, Yan, Richard and Pierre

Warm Magnet Interlocks Final validation test of SPS spares for main magnet interlocks Installation of several dosimeters for radiation profile in SPS tunnel (in prospect of future WIC installation) Confirmation of cabling layout and patch location for SPS renovation project with EN/EL

Software upgrades for MPE SectionDescriptionRisk of doing the change Risk to OP (0-5) Affected systems/functional ity Risk MitigationRisk of not doing itResponsi ble How to do testing When MSNew version of PMA server + GUI (new SMP IPOC, Beam Power Loss, Fill Statistics module) Minor risk that refactored Fill Statistics module will not work correctly anymore. 1PMA server, PM Database Usual extensive testing of new module in DEV server. 'Dry-dumps' after deployment. Discrepancy of information between PLAYBACK and ONLINE server for Fill Statistics, missing new functionality of new modules if not deployed. R.Gorbon osov, J.Suchow ski, A.Gorzaw ski, M.Zerlaut h Usual extensive testing of new module in DEV server. 'Dry- dumps' after deployment. Dependent of the Logging API release, so asap after this one MSNew version of cern.pm.data to add a feature to retrieve the SessionConfirmationInfo from a SessionInfoData, and to store the analysis flags of session handles. None1PMA server, newly stored PM data Test with development servers before deployment in production. Possible rollback Missing information from Session Data JC Garnier, R Gorbonos ov Testing with the pm- playback-gui and pm- online-gui in dev MSPCInterlock to take into account Collision beam process split Minor defects possible as coverage not optimal yet 2LHC SISMaskable interlockNo management of splitted collision beam process K. Fuchsber ger Validation with operators MSNew SMP GUI PRO release to follow the changes made to the HW (expert functionality) Operation should not be affected as the change is made to an expert functionality. 0SMP GUI application need to be rebooted roll-backnot synchronized with the SMP hardware, new functionality not provided to experts. M. Audrain Validation of the expert functionality change during the TS

NEW PM MODULES New PM analysis modules and Viewers for SMP and Beam Power Loss analysis

PcInterlock upgrade Refactoring and GUI improvements Possibility to split collision beam process (independent for IR1/2/5 and IR8)