Daya Bay Neutrino Experiment Huang Xingtao Shandong University, Jinan, China On Behalf of the Daya Bay Collaboration.

Slides:



Advertisements
Similar presentations
Search for  13 at Daya Bay On behalf of the Daya Bay Collaboration Deb Mohapatra Virginia Tech.
Advertisements

Results from Daya Bay Xin Qian On behalf of Daya Bay Collaboration Xin Qian, BNL1.
6/6/2003Jonathan Link, Columbia U. NuFact03 Future Measurement of sin 2 2  13 at Nuclear Reactors Jonathan Link Columbia University June 6, 2003 ′03.
Prototype of the Daya Bay Neutrino Detector Wang Zhimin IHEP, Daya Bay.
Daya Bay Neutrino Experiment
Daya Bay and Other Reactor Neutrino Oscillation Experiments
Reactor & Accelerator Thanks to Bob McKeown for many of the slides.
Daya Bay Reactor Neutrino Experiment
12 December 2003APS Neutrino StudyE. Blucher APS Neutrino Study: Reactor Working Group What can we learn from reactor experiments? Future reactor experiments.
Measuring  13 with Reactors Stuart Freedman University of California at Berkeley SLAC Seminar September 29, 2003.
Measuring sin 2 2  13 with the Daya Bay nuclear power reactors Yifang Wang Institute of High Energy Physics.
CurrentYufengXin sin 2 2θ 12 4%0.7%0.5% Δm %0.6%0.4% Δm %0.4%0.3% Impacts on neutrinoless beta decay, future unitarity tests of PMNS matrix,
Observation of Electron Anti-neutrino Disappearance in Daya Bay and RENO experiments.
1 The Daya Bay Reactor Electron Anti-neutrino Oscillation Experiment Jianglai Liu (for the Daya Bay Collaboration) California Institute of Technology APS.
Jun Cao Institute of High Energy Physics, Beijing Daya Bay Neutrino Experiment 3rd International Conference on Flavor Physics, Oct. 3-8, 2005 National.
Daya Bay Reactor Neutrino Experiment Jun Cao On behalf of the Daya Bay Collaboration Institute of High Energy Physics XIII International.
Physics Symposium: Steve Kettell10/2/20071 The Daya Bay Reactor Antineutrino Experiment Steve Kettell BNL 1)Why Daya Bay? 2)Status/BNL involvement.
Reactor Neutrino Experiments Jun Cao Institute of High Energy Physics Lepton-Photon 2007, Daegu, Aug , 2007.
S. Kettell WIN09 9/13/09 Daya Bay Experiment Steve Kettell BNL On Behalf of the Daya Bay Collaboration.
Caren Hagner CSTS Saclay Present And Near Future of θ 13 & CPV in Neutrino Experiments Caren Hagner Universität Hamburg Neutrino Mixing and.
Eun-Ju Jeon Sejong Univ. Sept. 09, 2010 Status of RENO Experiment Neutrino Oscillation Workshop (NOW 2010) September 4-11, 2010, Otranto, Lecce, Italy.
Measuring sin 2 2  13 at the Daya Bay Reactor Neutrino Experiment Christopher Mauger (for the Daya Bay Collaboration) W. K. Kellogg Radiation Laboratory.
1 2nd Sino-French Workshop on the Dark Universe Changgen Yang Institute of High Energy Physics, Beijing for the Daya Bay Collaboration Daya Bay Reactor.
Cheng-Ju S. Lin Lawrence Berkeley National Lab (On Behalf of the Daya Bay Collaboration) 17 July 2010 Status of the Daya Bay Neutrino Oscillation Experiment.
Christopher White Illinois Institute of Technology and Lawrence Berkeley National Laboratory Neutrino Christchurch, New Zealand 26 May 2008 Asian.
SYSTEMATICS (preliminary consideration) V. Sinev for Kurchatov Institute Neutrino group.
A detector design for the Daya Bay reactor neutrino experiment Yifang Wang Institute of High Energy Physics, Beijing Jan. 18, 2004.
1 Antineutrino Detector of Dayabay Reactor Neutrino Experiment Yuekun Heng, IHEP, Beijing On Behalf of the DayaBay Collaboration.
Karsten M. Heeger US Reactor  13 Meeting, March 15, 2004 Comparison of Reactor Sites and  13 Experiments Karsten Heeger LBNL.
Karsten Heeger, Univ. of WisconsinDNP2006, Nashville, October 28, 2006 A High-Precision Measurement of sin 2 2  13 with the Daya Bay Reactor Antineutrino.
Measuring sin 2 2  13 with the Daya Bay nuclear power reactors Yifang Wang Institute of High Energy Physics.
The Daya Bay Experiment to Measure  13 Herbert Steiner UC Berkeley & LBNL On behalf of the Daya Bay Collaboration Presented at the Erice School/Workshop.
Kr2Det: TWO - DETECTOR REACTOR NEUTRINO OSCILLATION EXPERIMENT AT KRASNOYARSK UNDERGROUND SITE L. Mikaelyan for KURCHATOV INSTITUTE NEUTRINO GROUP.
L. Oberauer, Paris, June 2004   Measurements at Reactors Neutrino 2004 CdF, Paris, June chasing the missing mixing angle.
PHENO 2010 Christopher White, IIT 1 The Daya Bay Reactor Antineutrino Experiment Christopher White 1.
The Daya Bay Reactor Neutrino Experiment Jonathan Link Virginia Polytechnic Institute & State University on behalf of the Daya Bay Collaboration Neutrino.
,,,,, The Daya Bay Reactor Neutrino Experiment Liangjian Wen On behalf of the Daya Bay Collaboration Institute of High Energy Physics Daya Bay Detectors.
1 US Cost & Schedule Summary W. R. Edwards US Project Manager CD-2/3a Review January 8, 2008 BNL.
1 Precise measurement of reactor antineutrino oscillations at Daya Bay Vít Vorobel (on behalf of the Daya Bay Collaboration) Charles University in Prague.
The Daya Bay Reactor Neutrino Experiment R. D. McKeown Caltech On Behalf of the Daya Bay Collaboration CIPANP 2009.
Search for  13 at Daya Bay On behalf of the Daya Bay Collaboration Deb Mohapatra Virginia Tech.
Measuring sin 2 2  13 with the Daya Bay nuclear power reactors Yifang Wang for Daya Bay collaboration Institute of High Energy Physics.
Karsten Heeger, Univ. of WisconsinAPS April Meeting, Jacksonville, April 16, 2007 Search for the Neutrino Mixing Angle  13 with non-accelerator experiments.
9/14/2007TAUP 2007, Sendai1 The Daya Bay Reactor Neutrino Experiment Shaomin Chen (for the Daya Bay collaboration) Tsinghua University, Beijing, China.
Karsten Heeger Beijing, January 18, 2003 Design Considerations for a  13 Reactor Neutrino Experiment with Multiple Detectors Karsten M. Heeger Lawrence.
Future Reactor Neutrino Physics Soo-Bong Kim (KNRC, Seoul National University) “International Workshop on RENO-50, June 13-14, 2013”
Double Chooz Near Detector Guillaume MENTION CEA Saclay, DAPNIA/SPP Workshop AAP 2007 Friday, December 14 th, 2007
DOE HEP Review: Steve Kettell4/17/20071 Daya Bay Steve Kettell BNL 1)Motivation 2)Daya Bay Experiment 3)Daya Bay Project 4)BNL involvement.
Daya Bay Reactor Neutrino Experiment On behalf of the DayaBay collaboration Virginia Polytechnic Institute and State University Joseph ykHor YuenKeung,
Measuring  13 with Reactors Stuart Freedman HEPAP July 24, 2003 Bethesda Reactor Detector 1Detector 2 d2d2 d1d1.
1 Muon Veto System and Expected Backgrounds at Dayabay Hongshan (Kevin) Zhang, BNL DayaBay Collaboration DNP08, Oakland.
  Measurement with Double Chooz IDM chasing the missing mixing angle e  x.
Karsten Heeger, Univ. of Wisconsin Yale University, March 1, 2010  13 from Global Fits current best limit sin 2 2θ 13 < CL Fogli, et al., arXiv:0905:3549.
1 Work report ( ) Haoqi Lu IHEP Neutrino group
1 Daya Bay Reactor Neutrino Oscillation Experiment Jen-Chieh Peng International Workshop on “Double Beta Decay and Neutrinos” Osaka, Japan, June 11-13,
Results on  13 Neutrino Oscillations from Reactor Experiments Soo-Bong Kim (KNRC, Seoul National University) “INPC 2013, Firenze, June 2-7, 2013”
Double Chooz Experiment Status Jelena Maricic, Drexel University (for the Double Chooz Collaboration) September, 27 th, SNAC11.
Daya Bay Neutrino Experiment and the Future Yifang Wang Institute of High Energy Physics.
2nd Sino-French Workshop on the Dark Universe Changgen Yang Institute of High Energy Physics, Beijing for the Daya Bay Collaboration Daya Bay Reactor Neutrino.
核科学与技术学院 School of Nuclear Science and Technology Results from Daya Bay Neutrino Experiment Qingmin Zhang for Daya Bay Collaboration IPA 2014 Aug ,
Daya Bay: Results and Future
The Double Chooz reactor neutrino experiment
NEUTRINO OSCILLATION MEASUREMENTS WITH REACTORS
The Daya Bay Reactor Neutrino Experiment
Recent results from Daya Bay reactor neutrino Experiment
Simulation for DayaBay Detectors
Daya Bay Reactor Neutrino Experiment
The Daya Bay Reactor Neutrino Experiment
Daya Bay Neutrino Experiment
Daya Bay Neutrino Experiment
Presentation transcript:

Daya Bay Neutrino Experiment Huang Xingtao Shandong University, Jinan, China On Behalf of the Daya Bay Collaboration

2 Neutrino Oscillation Parameterize the PMNS matrix as: Solar, reactorreactor and accelerator 0  Atmospheric, accelerator  23 ~ 45°  12 ~ 32°  13 = ?  13 is the gateway of CP violation in lepton sector! Weak eigenstate( )  mass eigenstate ( )  Pontecorvo-Maki-Nakagawa-Sakata (PMNS) Matrix

3 experimental knowledge on  13 Direct search (PRD 62, ) Global fit (arXiv: v2)

4 Big competition Angra, Brazil R&D phase Diablo Canyon, USA Braidwood, USA Double Chooz, France sin 2 2  13 ~0.03 Krasnoyarsk, Russia KASKA, Japan Daya Bay, China sin 2 2  13 ~0.01 RENO, Korea sin 2 2  13 ~ proposals 4 cancelled 4 in progress Advantages of Daya Bay: 1)very high antineutrino flux; 2) mountains to suppress cosmic-ray-induced backgrounds

5 Ling Ao II NPP: 2  2.9 GWth Ready by Ling Ao NPP: 2  2.9 GW th Daya Bay NPP: 2  2.9 GW th 1 GW th generates 2 ×  e per sec 55 km 45 km Daya Bay nuclear power plant 12th most powerful in the world (11.6 GW) Top five most powerful by 2011 (17.4 GW) Adjacent to mountain, easy to construct tunnels to reach underground labs with sufficient overburden to suppress cosmic rays

6 Detection of  e Coincidence of prompt positron and delayed neutron signals helps suppress background events Inverse  -decay in Gd-doped liquid scintillator: Delayed Energy Signal Prompt Energy Signal. 1 MeV8 MeV 6 MeV10 MeV E e+ (“prompt”)  [1,8] MeV E n-cap (“delayed”)  [6,10] MeV t delayed -t prompt  [0.3,200]  s n-p n-Gd

7 Place near detector(s) close to reactor(s) to measure raw flux and spectrum of  e, reducing reactor-related systematic Position a far detector near the first oscillation maximum to get the highest sensitivity, and also be less affected by  12 How to measure  13 ? The Survival Probability is described by:

8 How to measure  13 ? Measured ratio of Rates Proton Number Ratio Detector Efficiency Ratio sin 2 2  13 Filling Gd-LS and Mass measurement Calibration Systems

9 Total length: ~3100 m Daya Bay NPP, 2  2.9 GW Ling Ao NPP, 2  2.9 GW Ling Ao-ll NPP (under construction) 2  2.9 GW in m Daya Bay Near site 363 m from Daya Bay Overburden: 98 m Far site 1615 m from Ling Ao 1985 m from Daya Overburden: 350 m 4 x 20 tons target mass at far site Ling Ao Near site ~500 m from Ling Ao Overburden: 112 m 810 m 465 m 900 m entrance Filling hall Construction tunnel Water hall Daya Bay Layout Horizontal Tunnel Total length 3200 m

10 How to measure sin 2 2  13 to 0.01 So Far, CHOOZ: R=1.01  2.8%(stat)  2.7%(syst), sin 2 2  13 <0.17 Goal: sin 2 2  13 < 90% CL in 3 years.  Increase statistics Need intensive antineutrino flux from powerful nuclear reactors Antineutrino source ( Powerful Power Plant) Currently 4 cores 11.6 GW and will be 6 cores 17.4 GW from 2011 Utilize larger target mass, hence larger detectors Multiple detectors (totally 160 ton Gd-LS as targets)

11  Reduce systematic uncertainties: Reactor-related: Optimize baseline for best sensitivity and smaller residual errors Horizontal tunnel to make detectors removable Near and far detectors to minimize reactor-related errors Detector-related: Use “Identical” pairs of detectors to do relative measurement All detectors are filled at the filling hall and use the same batch of Gd-LS. Comprehensive program in calibration/monitoring of detectors Side-by-side calibration Interchange near and far detectors (optional) Background-related Go deeper to reduce cosmic-induced backgrounds Enough active and passive shielding B/S ~0.4% Near B/S ~0.2% Far How to measure sin 2 2  13 to 0.01

12 How to measure sin 2 2  13 to 0.01 The sensitivity of ≤ 0.01 for sin 2 2  13 will be reached after 3 years data taking Number of years of data taking Sensitivity in sin 2 2  13 (90%CL) 0.38% relative detector syst. uncertainty  m 2 31 = 2.5  10  3 eV 2

13 Daya Bay Detectors

14 Gd-Loaded LS LS Mineral Oil 5 m 1.55 m 1.99 m 2.49 m Calibration System PMT 5 m Anti-neutrino Detector( AD) Design  Three zones modular structure: I.Target: 20t, Gd-loaded scintillator II.  -catcher: 20t, normal scintillator III.Buffer shielding: 40t, oil  Reflector at top and bottom  192 8”PMT/module  E /E = 12%/  E  12% / E 1/2 Acrylic Vessels

15 Muon Veto System Multiple muon tagging detectors: –Water pool as Cherenkov counter has inner/outer regions –RPC at the top as muon tracker –Combined efficiency – > (99.5  0.25) %

16 Calibration System The 3 automated systems per detector perform weekly or monthly routine monitoring of detector. – γ(LED) source : Monitoring system for optical properties –Radioactive sources for energy calibration 68 Ge: positron source 252 Cf : neutron source

17 Gd-Liquid Scintillator Daya Bay experiment will use 200 ton normal liquid scintillator and 200 ton 0.1% gadolinium-loaded liquid scintillator (Gd-LS). Gd-TMHA + LAB + 3g/L PPO + 15mg/L bis-MSB The stability of the Gd-LS has been tested for two years with IHEP prototype detector (half ton Gd-LS) and high temperature aging tests in lab. All Gd-LS will be produced as one batch on-site, to ensure IDENTICAL detectors. The mixing equipment has been tested at IHEP and will be re- assembled on-site. 4-ton test batch production in April Excellent long-term LS stability in prototype

18 Offline Software Progress “NuWa( 女娲 )”: Day Bay Offline Software System –Designed with “Object-Oriented” Tech. and implemented with C++ Language. –Platforms to run: SLC, Mac, Fedora and so on. –Based on the Gaudi Framework developed by LHCb and extensively used by ATLAS, GLAST and BESIII. –Physics and detector simulation via Geant4 –Deploy ROOT Storage Technology. –From generation to simple physics analysis Chain has been build. Online and offline software are being integrated together. –Regular releases ( NuWa will be released soon) NuWa Statue

19 Civil Construction Control Room Surface Assembly Building Entrance Inside tunnel

20 Getting To Build The Detectors 4-m vessel in the U.S. Stainless steel tank in China 3-m acrylic vessel in Taiwan SS Tank delivery Delivery of 4m AVStainless steel tank in SAB

21 More on Detector Preparation Stick the ESR® high reflec. film on to the acrylic panel Practice installing bottom reflector Rehearsing installation of AD PMT assembly Checking out liquid- scintillator production plant Production of RPCs 0.1% Gd-LS in 5000-L tank

22 Tentative Schedule  : Proposal, R&D, engin. design etc.  October 2007: Ground Breaking  Spring 2008: CD3 review completed  March 2009: Surface Assembly Building occupancy  Summer 2010: Daya Bay Near Hall ready for data taking  Summer 2011: All near and far halls ready for data taking Three years’ data taking will reach full sensitivity.

23 The Daya Bay Collaboration Europe (3) (9) JINR, Dubna, Russia Kurchatov Institute, Russia Charles University, Czech Republic North America (15)(~83) BNL, Caltech, Cincinnati, George Mason Univ., LBNL, Iowa State Univ., Illinois Inst. Tech., Princeton, RPI, UC-Berkeley, UCLA, Univ. of Houston, Univ. of Wisconsin, Virginia Tech., Univ. of Illinois-Urbana-Champaign Asia (18) (~126) IHEP, Beijing Normal Univ., Chengdu Univ. of Sci. and Tech., CGNPG, CIAE, Dongguan Polytech. Univ., Nanjing Univ., Nankai Univ., Shandong Univ., Shenzhen Univ., Tsinghua Univ., USTC, Zhongshan Univ., Univ. of Hong Kong, Chinese Univ. of Hong Kong, National Taiwan Univ., National Chiao Tung Univ., National United Univ. ~ 218 collaborators Thanks for your attention!