County of Fairfax, Virginia Dulles Corridor Air Rights Study Investigation Fairfax County Board of Supervisors Transportation Committee December 10, 2013.

Slides:



Advertisements
Similar presentations
Transportation Funding Alternatives and Outreach
Advertisements

Tysons Tysons Corner Circulator Study Board Transportation Committee June 12, 2012.
Fairfax County Department of Transportation February 19, 2013 Silver Line Phase 1 Bus Service Plan.
Dulles Corridor Metrorail Project Status Update Fairfax County Transportation Advisory Commission November 16, 2010 Richard Stevens Fairfax County Department.
County of Fairfax, Virginia Department of Transportation Tysons Transportation: Planning, Analysis, and Design Projects Presented to: Transportation Committee,
Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee September 20, 2011.
County of Fairfax, Virginia Department of Transportation Fairfax Connector Bus Service Plans HOT Lanes and Dulles Rail Phase I Fairfax County Board of.
M E T R O P O L I T A N W A S H I N G T O N A I R P O R T S A U T H O R I T Y DULLES CORRIDOR METRORAIL PROJECT Financial Impact of Alternative Airport.
Tysons January 15, Operational Analysis of Dulles Toll Road Ramps to Tysons Boone Boulevard Ramp Analysis Seyed Nabavi Fairfax County Department.
County of Fairfax, Virginia Department of Transportation Board Four Year Transportation Plan 2013 to 2016 Board Transportation Committee June 12, 2012.
Silver Line Rail Project Update
Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee November 29, 2011.
Tacoma Link Expansion Infrastructure, Planning and Sustainability Committee Tacoma City Council--Nov. 13, 2013.
Northwest Rail Update Nadine Lee, Northwest Rail Project Manager Regional Transportation District March 21, 2012.
Dulles Corridor Metrorail Project 23-mile new Metrorail line branching off the Orange Line after East Falls Church 11 new stations 5 in Phase 1: East Falls.
1 Corey W. Hill Chief of Public Transportation May 20, 2008 May 20, 2008.
Wiehle Ave. Traffic Concerns Created by Judy and Doug Pew.
Silver Line: Coming Soon Serving Reston to Largo via the District of Columbia Washington Metropolitan Area Transit Authority October 19, 2013 Presentation.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
Town of New Hartford Southern Area GEIS Summary Presentation Planning Board Meeting Monday, June :30 pm.
County of Fairfax, Virginia Transportation Priorities: Project Timelines and the 2014 Bond Referendum 1 Tom Biesiadny, Karyn Moreland, Todd Minnix, Ray.
Metro Vision 2035 Regional Growth Scenarios. Scenario Workshop.
1 RTD TOD Program University of Denver November 2004.
Dulles Metro Extension Phase I: Tyson’s Corner Martene Bryan Luis Serna Matt Zarit.
21 st Century Committee Report Recommendations NC 73 Council of Planning Annual Meeting January 22, 2009.
County of Fairfax, Virginia Department of Transportation Update on Implementation of Transportation Projects in Fairfax County Fairfax Committee of 100.
County of Fairfax, Virginia Department of Transportation Update on Transportation Activities in Fairfax County Transportation Roundtable Dulles Area Transportation.
Part II: Case Studies 1.Arlington, VA: Transit-oriented Development Boosts Economy County-wide. 2.Portland, OR: Streetcar Increases Investment and Redevelopment.
1 The 2010 Financially Constrained Long-Range Transportation Plan And FY Transportation Improvement Program TPB Technical Committee November.
A Handbook That Outlines When traffic impact studies should be required What analyses should be included How the study should be reviewed and used Who.
Project Briefing Metropolitan Washington Council of Governments Transportation Policy Board Project Briefing Metropolitan Washington Council of Governments.
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
County of Fairfax, Virginia Department of Transportation Richmond Highway Transit Center Feasibility Study Briefing with the Fairfax County Transportation.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Performance Analysis Presentation to the National Capital Region Transportation Planning Board (NCR-TPB) November 28, 2012 Adopted: July 18, 2012 Item.
Presentation to ***(group) on ***(date) 1.  Cities - 11  Highway districts – 3  Ada and Canyon Counties  School districts – 2  Valley Regional Transit.
1 What If… The Washington Region Grew Differently? The TPB Regional Mobility and Accessibility Study TPB Citizens Advisory Committee Public Forum in Oxon.
Performance Analysis Presentation to the National Capital Region Transportation Planning Board (NCR-TPB) December 19, 2012 (updated from November 28, 2012)
Avalon Park Retail Market Analysis Fishkind and Associates, Inc Corporate Blvd. Orlando, FL December 12, 2008.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
Freeway Congestion In The Washington Region Presentation to National Capital Region Transportation Planning Board February 15, 2006 Item # 9.
The Dulles Corridor 1. Wiehle Avenue 2 Joint development - Fairfax County and Comstock 3.5 acre Comstock parcel and 9.0 acre County parcel Mixed-use,
Metro’s Capital Improvement Needs Presented to the National Capital Region Transportation Planning Board By Tom Harrington, Director of Long Range Planning.
Silver Line Phase 1 – Status Report Status Overall Phase 1 Construction – 99% complete All Station at 98% complete except Wiehle – Reston East at 99% complete.
1 Transit Capacity Constraint Presented to: TPB Technical Committee April 1, 2005 Lora Byala Washington Metropolitan Area Transit Authority Office of Business.
County of Fairfax, Virginia 11 Dulles Corridor Air Rights Study Investigation Fairfax County Board of Supervisors Transportation Committee September 17,
County of Fairfax, Virginia Department of Transportation Urban Street Standards Progress Report Board of Supervisors Transportation Committee December.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
County of Fairfax, Virginia Silver Line Update Board Transportation Committee December 1, 2015 Mark Canale Fairfax County Department of Transportation.
County of Fairfax, Virginia Fairfax County Comprehensive Transit Plan and Transit Development Plan Board Transportation Committee December 1, 2015 Randy.
Overview Presentation Fall 2015 Gainesville-Haymarket Extension Study.
County of Fairfax, Virginia Transportation Priorities Plan Future Updates 1 Ray Johnson and Tom Biesiadny Fairfax County Department of Transportation Board.
County of Fairfax, Virginia Department of Transportation Update on Transportation Activities in Fairfax County Transportation Roundtable Dulles Area Transportation.
Company LOGO Georgia Truck Lane Needs Identification Study Talking Freight Seminar March 19, 2008 Matthew Fowler, P.T.P Assistant State Planning Administrator.
EASTSIDE ACTIVITY CENTER DRAFT MASTER PLAN Board of County Commissioners January 22, 2008.
1 What If… The Washington Region Grew Differently? The TPB Regional Mobility and Accessibility Study Ronald F. Kirby Director, COG Department of Transportation.
Board of Supervisors Transportation Committee June 25, 2013 (6/18 presentation draft) Proposed High Quality Transit Network Concept 1.
County of Fairfax, Virginia Policy on Level of Service in Activity Centers Board Transportation Committee December 17, 2013 Department of Transportation.
Prince William County – Specialized Logistics & Supply Chain Briefing Presented By: Prince William County Department of Economic Development
Carolina North Carolina North Annual Report for Chapel Hill Town Hall September 29, 2010.
County of Fairfax, Virginia Department of Transportation Update on Transportation Activities in Fairfax County Transportation Roundtable Dulles Area Transportation.
Local land-use and transportation
planning and zoning committee presentation September 19, 2016
Integrating Transit and Highway Solutions In High Volume Corridors
Update of Transportation Priorities Plan
Regional Roads Committee
Valley & Third Streets Redevelopment
Recommendations on Parking Requirements in Transit Oriented Development (TOD) Areas Outside Tysons TRANSPORTATION ADVISORY COMMISSION July 16, 2013 This.
Board Transportation Committee October 13, 2015
Transportation Forum for Northern Virginia’s Elected Leaders April 23, 2018 Presented by: Monica Backmon, Executive Director.
Presentation transcript:

County of Fairfax, Virginia Dulles Corridor Air Rights Study Investigation Fairfax County Board of Supervisors Transportation Committee December 10, 2013

County of Fairfax, Virginia On March 19, 2013 the Fairfax County Board of Supervisors asked FCDOT staff to address the following at a Board Transportation Committee Meeting: Prepare a very brief presentation on air rights. Obtain an estimate of the cost of a feasibility study.

County of Fairfax, Virginia Metropolitan Washington Airports Authority (MWAA) Study 3 In April of 2010, MWAA began a study of the engineering requirements and costs associated with incorporating plans to build mixed-use developments atop the toll road as a revenue generator. Kimley-Horn and Associates and The Advisory Group were selected to undertake the study. Cost of study was approximately $150,000. This study focused on the Reston Town Center Station as a test case. The findings of this effort were initially presented to MWAA on November 8, 2010.

County of Fairfax, Virginia Metropolitan Washington Airports Authority Study Cont’d 4 Three location options were considered. Option three was selected for further analysis. Source: MWAA Study Approximate 580,000 sf platform

County of Fairfax, Virginia 5 Estimated Foundation Cost Includes initial investment in air rights deck foundation and station modifications Source: MWAA Study Metropolitan Washington Airports Authority Study Cont’d Note: Cost estimate for construction prior to rail opening assumes that a 60’ span column support can be used. If construction commences after rail opening, a 150’ span column support will be necessary. Costs are in 2014 dollars. If constructed prior to rail opening: $33.9 M If constructed after rail opening: $60.0 M

County of Fairfax, Virginia 6 Buildable square feet: 4,000,000 sf (Intended to achieve the highest Internal Rate of Return possible) Assumed mix of uses: –Retail: 90,000 sf –Office: 1,720,000 sf –Hotel: 390,000 sf –Residential-rental: 900,000 sf –Residential-sale: 900,000 sf FAR required for build-out: 6.9 (much higher than likely) Reston Town Center Platform Source: MWAA Study Metropolitan Washington Airports Authority Study Cont’d

County of Fairfax, Virginia 7 Estimated Construction Costs Total development costs (w/o carrying costs): –Foundation - $33.9 M –Infrastructure - $121.3 M –Third party development - $1.314 B –Total $1.469 B Source: MWAA Study Metropolitan Washington Airports Authority Study Cont’d

County of Fairfax, Virginia 8 Land Cost vs. Platform Cost Source: MWAA Study Metropolitan Washington Airports Authority Study Cont’d Average land cost near Northern Virginia Metrorail Stations: $ psf (Includes some land costs in Tysons Corner) Estimated cost for Reston Town Center Metrorail Station Platform: $ psf

County of Fairfax, Virginia 9 Silver Line Development Potential in Fairfax County Station Name 1/8 Mile Developable Acres 1/4 Mile Developable AcresAllowable FARSquare Feet within 1/8 mileSquare Feet within 1/4 mile McLean ,094,640 12,405,888 Tysons Corner ,850,704 12,249,072 Greensboro ,303,728 12,911,184 Spring Hill ,937,824 14,270,256 Tysons Corner Subtotal ,186,896 51,836,400 Wiehle – Reston East ,561,328 12,318,768 Reston Town Center ,021,184 11,377,872 Reston Area Subtotal ,582,512 23,696,640 Herndon (North) ,990 3,855,060 Herndon (South) ,090 3,953,070 Innovation Center(North) ,005 4,171,306 Innovation Center(South) ,973 4,525,013 Herndon Area Subtotal ,617,085 11,979,436 Grand Total ,386,493 87,512,476 Source: MWAA Study Metropolitan Washington Airports Authority Study Cont’d Over 87M sf of development potential on the land within ¼ of a mile of Silver Line Metrorail Stations without air rights development.

County of Fairfax, Virginia 10 Land lease: Property is leased from the federal government by MWAA through Even if the lease is extended, many private developers would not want to invest nearly $1.5 billion into indirectly leased land. Development rights: The federal statute that authorizes the land lease requires property to be used for “airport purposes”. These purposes are defined as for “aviation business or activities, activities necessary or appropriate to serve passengers or cargo, or nonprofit, public use facilities that are not inconsistent with the needs of aviation”. Challenges to Air Rights Development in Reston Source: MWAA Study Metropolitan Washington Airports Authority Study Cont’d

County of Fairfax, Virginia 11 Cost/FAR: –4 million square feet of development at Reston Town Center Station requires a 6.9 FAR. –Area FAR’s: Ballston is 6.0 to 6.5. Tysons is 4.0 to 6.0. –The cost of building the platform is estimated at over twice the average of recent land sales near Northern Virginia transit facilities. Comprehensive Plan: Includes enough planned residential and office in the Reston Town Center Station area until 2040, based on GMU forecasts. In total, the Fairfax County Silver Line station areas have development potential for over 87 million square feet within a ¼ mile distance of the stations. The Comprehensive Plan currently has no density allocated over the Dulles Toll Road. Transportation studies supporting the Comprehensive Plan did not assume additional density over the Dulles Toll Road. Challenges to Air Rights Development in Reston (Cont’d) Source: MWAA Study Metropolitan Washington Airports Authority Study Cont’d

County of Fairfax, Virginia 12 Conducted for Comprehensive Plan Amendments Forecasted Conditions for Comprehensive Plan Build-Out (2030) – Major intersections near Dulles Toll Road are projected to have highest level of delay in the future. Source: MWAA Study Fairfax County Dulles Corridor Transportation Study

County of Fairfax, Virginia PM Weekday Peak Intersection Level of Service at Proposed Comprehensive Plan Build-Out with Mitigation (No Platform Development Assumed) 13 Source: Dulles Reston Transportation and Land Use Planning Study Final Report Proposed Platform Development 11

County of Fairfax, Virginia PM Weekday Peak Intersection Level of Service at Proposed Comprehensive Plan Build-Out with Mitigation (No Platform Development Assumed) 14 Reston Area Weekday PM Peak Intersection LOS and Seconds of Delay with Signal Optimization #IntersectionLOSInt. Delay (Sec/veh)#IntersectionLOSInt. Delay (Sec/veh) 1Centreville Rd at Sunrise ValleyF8513Reston Pkwy at DTR EB on/off rampC34 2Centreville Rd at DTR EB on/off rampD3714Reston Pkwy at DTR WB on/off rampE57 3Centreville Rd at DTR WB on/off rampC2515Reston Pkwy at New Dominion PkwyF83 4Fairfax County Pkwy at DTR EB on/off rampD4316Reston Pkwy at Sunrise ValleyE79 5Fairfax County Pkwy at DTR WB on/off rampC3017Reston Pkwy at Sunset HillsF217 6Fairfax County Pkwy at Spring StreetC2618Wiehle Ave at DTR EB on/off rampC24 7Fairfax County Pkwy at Sunrise ValleyD5019Wiehle Ave at DTR WB on/off rampD37 8Hunter Mill Rd at Sunrise ValleyE6520Wiehle Ave at Sunrise ValleyD53 9Hunter Mill Rd at Sunset HillsD5521Wiehle Ave at Sunset HillsF253 10Hunter Mill Rd at DTR EB on/off rampB1822Centreville Rd at Frying Pan RdD36 11Hunter Mill Rd at DTR WB on/off rampF14123Centreville Rd at Coppermine RdC29 12Reston Pkwy at Bluemont WayD4024Sunrise Valley Dr at Frying Pan RdF174 Source: Dulles Corridor Study Transportation Study Final Report 9 intersections near the Herndon/Reston Metrorail stations will function at a LOS E or F with proposed Comprehensive Plan build-out, without additional development using Air Rights.

County of Fairfax, Virginia Average PM Peak Weekday Trip Generation for Assumed Mix of Uses 15 Source: MWAA Study/FCDOT Avg PM Weekday Trip Generation for Reston Town Center Station Platform Development UseSFUnits/Rooms Avg PM Peak Hour Weekday Trip Per 1,000 sf gross floor/leasable area, Unit or Rooms Avg PM Peak Hour Weekday Trips Retail90, Office1,720, ,563 Hotel390, Residential-Rental900, Residential-Sale900, Average PM Peak Hour Weekday Trips For Development:4,192 Average PM Peak Hour Weekday Trips For Development with 50% Transit Reduction:2,096 Assuming a high transit reduction of 50%, this development would produce over 2,000 additional vehicle trips during the PM Peak Hour, adding congestion to already congested roadways.

County of Fairfax, Virginia Conclusions 16 Developing over the DTR will be more expensive than developing on adjacent land. Significant potential for additional growth available on land adjacent to the DTR. Neither Comprehensive Plan amendments for Tysons or Reston/Herndon assumed development over the DTR. Vehicle access to the development over the DTR will be challenging. Even with mitigation measures, area roads will be at or above capacity with Comprehensive Plan development potential, without the additional density associated with air rights development.

County of Fairfax, Virginia Conclusions (cont.) 17 Additional development over the DTR will require additional transportation improvements for which funding will need to be identified. The MWAA analysis indicates that developing a profitable Air Rights project in Reston would be economically challenging. A Dulles Air Rights Study is estimated to cost between $150,000 and $200,000.

County of Fairfax, Virginia Questions 18