Thermal Plant Data and Assumptions TEPPC – Data Work Group Call Tuesday, September 29, 2015.

Slides:



Advertisements
Similar presentations
WORKSHOP ON UTILITY WIND INTEGRATION STUDIES: MODELS AND METHODS Panel 6 – Base Load Unit Cycling Costs Gene Danneman P.E. June 24 & 25, 2010.
Advertisements

Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Enhanced Day Ahead Commitment Project: Enhancements to the DACP IESOTP 244-3d.
Gloria Godson VP, Federal Regulatory Policy Reliability Pricing Model Part 2.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
PacifiCorp-CAISO EIM Initiative Overview
Presentation to WECC Market Interface Committee March 24, 2015
Gas Turbine Developments Needed to Aid Wind Power Integration Dr. Warren Katzenstein October 21, 2010.
Integration of Large-Scale RES in Island Power Systems Prof. Nikos Hatziargyriou, National Technical University of Athens
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
SEPTEMBER 29, 2014 | CONCORD, NH Eric Johnson DIRECTOR, EXTERNAL AFFAIRS New Hampshire Energy Summit Lessons Learned from Winter 2014 and How the ISO Is.
EE 369 POWER SYSTEM ANALYSIS
1 Least Cost System Operation: Economic Dispatch 2 Smith College, EGR 325 March 10, 2006.
Least Cost System Operation: Economic Dispatch 1
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
Ludington Pumped Storage Plant and Wind Power Operational Considerations David Lapinski Consumers Energy Company June 16, 2009.
GE Energy Asia Development Bank Wind Energy Grid Integration Workshop: Issues and Challenges for systems with high penetration of Wind Power Nicholas W.
Study Results Drought Scenario Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the impact in the interconection.
Lynn Coles, PE National Wind Technology Center National Renewable Energy Laboratory Golden, Colorado USA 10 FAQ’s (Frequently Asked Questions) About Wind.
Optimization for Operation of Power Systems with Performance Guarantee
Avista’s Flexibility Overview James Gall Senior Power Supply Analyst Contact:
Base Case Draft – For Comment Rocky Mountain States Sub-Regional Transmission Study December 9, 2003.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes January 28, 2009 WMS Meeting.
Sixth Northwest Conservation & Electric Power Plan Adding Incremental Flexibility to the Pacific Northwest Power System? Maury Galbraith Northwest Power.
Announcements Homework 7 is 6.46, 6.49, 6.52, 11.19, 11.21, 11.27; due date is Thursday October 30 Potential spring courses: ECE 431 and ECE 398RES (Renewable.
Leader-Follower Framework For Control of Energy Services Ali Keyhani Professor of Electrical and Computer Engineering The Ohio State University
Plug-in Vehicles and the Electric Grid Mark Kapner, PE Senior Strategy Planner Austin Energy
Optimizing Deployment of CCGT Duct Firing Capacity in the Nodal Market Josh Clevenger Brazos Electric Cooperative.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
1 Pacific Northwest Hydro-Thermal System and RTO West Market Design FERC Market Design Workshop January 23, 2002.
IWWG Annual Conference Wind Management at MISO July 22, 2011.
DWG Progress Report to TAS November 3-4, 2015 Salt Lake City, UT Jamie Austin, PacifiCorp TEPPC\Data Work Group - Chair.
Cost Impacts of Cycling Coal-Fired Power Plants
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Verifiable Costs Process WMS Meeting May 15, 2007 Ino.
Project Tracking Update July 12, 2011 MOPC. 2 STEP List (Excel Spreadsheet) –Engineers enter technical data and analysis on upgrades –Used as a repository.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
DWG – Dependable Capacity Kevin Harris, ColumbiaGrid TEPPC\Hydro Modeling Task Force - Chair.
Study Results April 16, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
The Impact of Intermittent Renewable Energy Sources on Wholesale Electricity Prices Prof. Dr. Felix Müsgens, Thomas Möbius USAEE-Conference Pittsburgh,
January 14, 2016 PacifiCorp-CAISO-NVE EIM Initiative Overview.
Atcllc.com Using CEMS Data to Estimate Coal-Fired Plant FORs and Scheduled Maintenance Chris Hagman
Other Generator Costs Startup, VOM, Ramping & Forced Outage Rates DWG Meeting October 22, 2013.
Gen Maintenance w/ GridView DWG – Dec. 14, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL WECC System Adequacy Planning.
WECC Reliability Study Requests Byron Woertz, Manager—System Adequacy Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
1 Economic Dispatch Sub-Committee Meeting Ross Baldick Department of Electrical and Computer Engineering The University of Texas at Austin September 24,
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
Northwest Coal Retirement Reduction Study Development of Base Case Assumptions and Scenarios PNUCC Meeting October 15,
04/16/ Planning New Generation APPA Operations & Engineering Conference April 10, 2006 Jay Hudson, PE Manager, Environmental Management.
TAS Follow-up Webinar Historical Year Energy Shape Compromise for 2026 Common Case December 14, 2015 Jim Filippi- TAS Chair Tom Miller- TAS Vice Chair.
Study Plan Development & Approach May 5, 2010 Conference Call & Webinar “To ensure efficient, effective, coordinated use & expansion of the members’
Minnesota Renewable Energy Integration and Transmission
Integrated Resource Plan 2016
Wind Management at MISO
CCU Update integrated resource plan May 17, 2016
EPS Updates ColumbiaGrid Planning Meeting October 13, 2016
Verifiable Cost Working Group (VCWG) Update
Kevin Harris, ColumbiaGrid TEPPC\Model Work Group - Chair
Northwest Power and Conservation Council
Kevin Harris, ColumbiaGrid TEPPC\Model Work Group - Chair
Outline Background Study Assumptions Study Results To Do
Recommended Hydro Improvement April 11, 2017
Flexible Forward Contracts for Renewable Energy Generators
St. Joseph’s CHP Plant Cogen Plant Location Why Cogen: What is Cogen:
Evolving Economic Dispatch in SPP
MRES Resource Operations in SPP
Outline Modeling Issue 2017 Modeling Goals
Recommended Hydro Improvement April 11, 2017
Study Results Drought Scenario Study
Presentation transcript:

Thermal Plant Data and Assumptions TEPPC – Data Work Group Call Tuesday, September 29, 2015

Overview Review of “Thermal Plant” Data and Assumptions Generator Cost Parameters – Guidance from Intertek-APTECH Startup and Cycling Cost Variable O&M Ramping Penalty Final assumptions for forced outage rates How to apply Ramp Rate Penalty in GridView? Better alignment with historic Operation 2

Intertek-APTECH Data WECC – TEPPC joint with NREL hired Intertek-APTECH Engineering in response to stakeholders concerns about the increased cycling and ramping of thermal generation in recent studies, due to the increased penetration of variable generation. The APTECH data formatted for TEPPC that impacts the dispatch decision included: – Hot, warm, and cold start costs Load follow/ramping cost impacts Base-load Variable Operation and Maintenance (VOM) costs Base Load and Cycling Costs: APTECH agreed for use of low-end cost data in public domain with some exception given “typical” values for large coal plants. The reason for just low-end data is a hedge for APTECH to protect their business. 3

Definition of “Buckets” Costs aggregated into seven plant groups – Small subcritical coal plants ( MW) – Large subcritical coal plants ( MW) – Large supercritical coal plants ( MW) – Combined Cycle Units (CT, ST, HRSG) – Simple Cycle Large Frame CT – Simple Cycle aero-derivative CT (LM 6000) – Gas-fired steam plants ( MW) 4

Better Alignment with Historic Operation 5 Kevin Harris

Production Cost Model What is a Production Cost Model (PCM) – It economically commit and dispatch supply to serve load of the modeled footprint – There are no hard constraints – Everything is evaluated as a cost ($) – The objective is to mimic utility or market operations 6

The Rules The rules of Production Cost Modeling Single owner dispatch – Everything is evaluated as a cost ($) – WECC is composed of 38 balance areas each optimizing their supply to economically serve their load and contractual obligations A modeler can only layer in constraints to mimic a desired behavior – Backcasting provides a know behavior to mimic – What inaccuracies are you willing to accept? 7

8