After-the-Fact Workgroup Update Sheryl Welch ISAS Meeting January 12-13, 2016 Phoenex, AZ.

Slides:



Advertisements
Similar presentations
E-Tag 1.8 An industry tutorial. e-Tag 1.8 The basics features of e-Tag 1.8 are much the same as in the current version The tag author uses Agent.
Advertisements

E-Tag 1.8 An industry tutorial.
NAESB Coordinate Interchange Version 1 Standard Revision 1, Draft 5 August, 2005.
E-Tag 1.8 An industry tutorial.
NAESB Coordinate Interchange
Business Practices Subcommittee Update February 2, 2010.
DYNAMIC SCHEDULES AD HOC WORK GROUP ANN DAVIS, CHAIR MARILYN FRANZ.
NAESB Coordinate Interchange Standard, Version 1 / 0
© 2009 The Williams Companies, Inc. All rights reserved. ______________ WECC November 12, 2012.
Dynamic Schedule e-tagging Requirements Criterion WECC-087 (formerly INT-008) ISAS Report January 2012.
Primary Objectives of WIT
Dynamic Transfers Bob WECC MIC Meeting “The Last Hurrah!”
E-Tagging Issue Work Group Raymond R. Vojdani, P.E.
Bob Harshbarger Volunteer Order 771 January 16, 2013 Still Icy-Cold Salt Lake.
Brenda Ambrosi Interchange Scheduling and Accounting Subcommittee Chair ISAS Presentation to the OC October 2013 Salt Lake City, UT.
WECC BAL-STD-002 Workshop February 6, 2008
Interchange Authority Recommendations Board of Directors Meeting December 7, 2007.
BAL-002-WECC-1 Contingency Reserves
Interchange Scheduling and Accounting Subcommittee Update WECC OC Meeting June 2009 Salt Lake City, Utah Marilyn Franz ISAS Chair.
ISAS Liaison Report October 25-26, 2007 MIC Meeting.
MIC/ISAS LIAISON REPORT June 15, 2007 April, 2007 ISAS Meeting Highlights.
Interchange Scheduling and Accounting Subcommittee Update October 2008 Gary Nolan ISAS Vice-Chair.
Intra Hour Tagging/Oasis During System Contingencies The transmission tagging process was initially developed to solve an after the fact accounting issue.
Gary Nolan Interchange Scheduling and Accounting Subcommittee Chair e-Tag Denial Issue Referred to Joint Guidance Committee.
Brenda Ambrosi Interchange Scheduling and Accounting Subcommittee Chair e-Tag Denial Issue Referred to Joint Guidance Committee.
FERC Order minute Scheduling.
INT Rewrite Projects Presented by Bob Harshbarger January 2012.
ISAS Update August 2, 2011 Market Issues Subcommittee.
ISAS Update Prepared by Brenda Ambrosi ISAS Chair October 14, 2011.
ATFWG Report ISAS Meeting August 28 & 29, 2013 Salt Lake City Amy Lubick - NWMT.
Sheryl Welch, ATFWG Chair August 20, 2014 Portland, OR.
ISAS Report To the OC Andy Meyers Interchange Scheduling & Accounting Subcommittee Chair October 2014 Salt Lake City, UT W ESTERN E LECTRICITY C OORDINATING.
FRCC Fall Compliance Workshop October , 2013
After-the-Fact Workgroup Update Sheryl Welch ISAS Meeting 01/28/2015 Salt Lake City, UT.
1 Utility Wind Integration Group Workshop ACE Diversity Interchange (ADI) Project Sharing Area Control Errors July 2007 Sponsoring Utilities: British Columbia.
SRWG Update to TSS February 2015, Meeting 168 WECC HQ
Sheryl Welch, ATFWG Chair August 20, 2014 Portland, OR.
9/22/00 1 Jerry W. Smith. 9/22/00 2 Jerry W. Smith.
Andy Meyers ISAS Chair ISAS Report WECC Operating Committees March 2015 Salt Lake City, UT.
Andy Meyers Interchange Scheduling and Accounting Subcommittee Chair Update: WIT Contract Ownership January 2015 Salt Lake City, UT.
Andy Meyers Interchange Scheduling and Accounting Subcommittee Chair Discussion Item: Use of Emergency eTags January 2015 Salt Lake City, UT.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N WIAB WECC Interchange Authority Backup BY LOU MIRANDA BONNEVILLE POWER ADMINISTRATION TRANSMISSION.
Reserves Issue For years there has been disagreement over reserves issues and what constitutes firm power. We’ve been able to function as a market, despite.
2013 Calendar Year Customer Survey Results
Reserves…Where are we??? Service Schedule C Service Schedule C C-3.10 Seller shall be responsible for ensuring that Service Schedule C transactions are.
ISAS Report Andy Meyers ISAS Chair Operating Committee Meeting October 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
NERC BAL-005, BAL-006, FAC-001 Gary Nolan WECC ISAS April 20, 2016.
Interchange Scheduling & Accounting Subcommittee (ISAS) Charles (Bud) Freeman, SCL W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Interchange Scheduling & Accounting Subcommittee
Unscheduled Flow Administrative Subcommittee Report
Transmission Outage Coordination
Sheryl Welch ATFWG Chair
Kenneth Silver Los Angeles Department of Water & Power
Review of After-the-Fact (ATF) Tagging Criteria Scheduler’s Meeting May 24, 2016 Raymond will ask the audience what their expectations are in regard to.
Compliance Open Webinar
Anitha Neve Operations and Interchange Specialist
Anitha Neve Operations and Interchange Specialist
Anitha Neve Operations and Interchange Specialist
Andrew Christensen, SDWG Chair
After-the-Fact Workgroup Update Sheryl Welch
IWG Update January 2015 ISAS Danielle Johnson.
Anitha Neve Operations and Interchange Specialist
Review of After-the-Fact (ATF) Tagging Criteria Scheduler’s Meeting May 24, 2016 Raymond will ask the audience what their expectations are in regard to.
Compliance Open Webinar
Sheryl Welch ATFWG Chair
Peak Reliability IRO Webinar
Andy Meyers ISAS Chair Operating Committee Meeting October 2015
WIAB WECC Interchange Authority Backup
RC Transition and Tools (WIT, ECC) Update
Public Utilities Specialist
Presentation transcript:

After-the-Fact Workgroup Update Sheryl Welch ISAS Meeting January 12-13, 2016 Phoenex, AZ

2 o Webinar was held November 5, o Object was to have specific reasons for ATF Tags. o Following changes were made. Reasons to Create ATF Tags ATF tags are used by Balancing Authorities (BAs or CAs), Transmission Service Providers (TSPs), and Scheduling Entities (SEs) to accurately reflect a schedule which was coordinated and controlled by a BA’s Energy Management System (EMS) and Automatic Generation Control (AGC) system during real time system operations, but was not properly tagged. Missing or incorrectly used CA (Balancing Authority), TP (Transmission Provider), or SE (Scheduling Entity) Missing adjacencies or incorrect Point of Receipt or Point of Delivery segment(s) When there is an Emergency and WIT system goes down. ATF tags shall not be used for market driven manipulations. NOTE: When an ATF tag is needed to correct a dynamic tag, the tag type is normal. ATF Tagging Guidelines

3 Posted for Comments on December 9, Three Comments Received. ATFWG Meeting/Webinar was held yesterday. o Discussed Inadvertent and how it affects ACE. o Discussed whether or not PeakRC was going to accept ATF changes. o Discussed the comments that were received.  APS question—If a unit is off line, but energy was tagged from that unit but generated from its sister unit is that a reason for a WIT change? Consensus was No.  NWMT—Section 1.4 Definitions: WIT – Western Interchange Tool. Should be WECC Interchange Tool (Change made) ATF Tagging Guidelines (Cont’d)

4  BANC/SMUD/TANC—Only bullets one, three, and four are required in the Attachment 1. If there are any instances in which a tag had a missing or incorrect BA, TP, SE, Adjacency or POR/POD which needed to be corrected, then those corrections should only be made under the provision of the bullet one. ATF Tagging Guideline (Cont’d)

5 Reasons to Create ATF Tags ATF tags are used by Balancing Authorities (BAs or CAs), Transmission Service Providers (TSPs), and Scheduling Entities (SEs) to accurately reflect a schedule which was coordinated and controlled by a BA’s Energy Management System (EMS) and Automatic Generation Control (AGC) system during real time system operations, but was not properly tagged. o Missing or incorrectly used CA (Balancing Authority), TP (Transmission Provider), or SE (Scheduling Entity) o Missing adjacencies or incorrect Point of Receipt or Point of Delivery segment(s) When there is an Emergency and WIT system goes down. ATF tags shall not be used for market driven manipulations. NOTE: When an ATF tag is needed to correct a dynamic tag, the tag type is normal. ATF Tagging Guidelines (Cont’d)

6 Decision was to have a one or two-day workshop to focus on all the ATF tag issues, with PEAKRC, WECC, ATFWG. ATF Tagging Guidelines

7 Previous changes to WIT Schedule Change Request Form o Converted to Excel Spreadsheet o Added Date and Lead Party o Changed from WECC to WIT Schedule Change Request Form New Changes to the Form for tracking purposes only o Added two columns  ATF Created (Y/N)  Number of ATF Tags Needed o Added For ATF Chair Use Only Box o Added “….and and cc the ATFWG Note: Until we hear different, form is to be submitted to both WECC & PEAK WIT Schedule Change Request Form

8 WIT SCHEDULE CHANGE REQUEST FORM

ATF WIT Changes REASON Incorrect Path or Sched Entity Scheduling or Adjusting Error System Error Generation/Meter Adjustment Incorrect Source / Sink Curtailment Error03312 Incorrect PSE0085 RSG Tag Error89189 Integration Error1024 Tag Type Correction04900 Incorrect Tag WIT not match OAIT Tag8000 Oversold1000 Unknown0401 TOTAL Current MW Changed to MW Total MW Change

Last update was November 1, If your company has any ATF personnel changes, please send the following information to o Specify: Active ATFWG Member or Distribution Only o Name o Company o Phone o Fax o Updating ATFWG Contact List

QUESTIONS