Alternative Waste Management Team #1 Annette Craig Eric Clint Chris.

Slides:



Advertisements
Similar presentations
ACT Canada TDM Summit Halifax| October, 2008 Telework Pilot : The City of Calgary.
Advertisements

Museum Presentation Intermuseum Conservation Association.
Business Process Management.  A method of evaluating the financial consequences of business investments, decisions, or actions.  A high ROI means that.
Preparing the Systems Proposal CIS458. Last Class Project outline –Documents and reports Database Application Lifecycle –Database planning, system definition,
Building the case for Windows 8.1 Flexible Workstyle deployment Windows 8.1 Business Value Workshop Microsoft Consulting Services can help you build the.
1 HIE Project Business Case HIMSS/NACCHO HIE Toolkit for Public Health Business Case Tool [INSERT ORGANIZATION NAME, DATE]
Interactions of Tax and Nontax Costs n Uncertainty u Symmetric uncertainty u Strategic uncertainty (information asymmetry) F Hidden action (moral hazard)
Cleaner Production Assessment (Chapter 4)
The Reality of the Struggle to Align the Business with I.T. Rosana F. Chaidez Large Company Technology Networking Conference June 17th – 18th, 2008.
Project Estimation Describe project scope, alternatives, feasibility.
The Analyst as a Project Manager
Crisis Management Planning Employee Health Safety and Security Expertise Panel · Presenter Name · 2008.
1 BUSINESS CONTINUITY AND DISASTER RECOVERY PLANNING Reducing your Risk Profile MIDWEST DATA RECOVERY INC.
1 INVESTMENT PROJECTS. 2 Contents  Investment projects and company value  Discussion of course participant experiences with investment projects  Summary.
[Organization Name] [Date] In consultation with:.
Change to Project Title
Systems Analysis – ITEC 3155 Feasibility Analysis
© 2009 Capaccio Environmental Engineering, Inc. “Helping Industry and the Environment Prosper” Pollution Prevention Saves Money By Reducing Operational.
Conceptualizing & Initializing the IT Project
Proposed Supply Chain Risk Management Process Flow Supply Chain Risk Leadership Council 20 April 2009 DRAFT.
Reduction of Ethylene Oxide Exposures Project Manager Andreas Wagner, CIH, ROH Project Team Louise Chayer-Ayers, CIH, ROH, Rona Hamilton, CIH, CRSP Judy.
Introduction to Business © Thomson South-Western ChapterChapter Savings and Investment Strategies Saving and investment planning Stock.
1 Safety Leadership: Many Returns TEAM 6: Tom, D J, John, Mary, & Vint.
The Business Plan. What is it? It is a study which identifies the business, the product, the market, the business feasibility and it financial requirements.
Guide to Financial Analysis. 2 Contents  Purpose of this Guide  Financial Analysis defined  Defining Costs  Capital Costs  Operating Costs  Benefits.
The Balanced Score Card
1 ISA&D7‏/8‏/ ISA&D7‏/8‏/2013 Project Planning Activities Project Schedule Risks Management and Project Feasibility Financial Calculations Tangible.
EHS Strategy Map Key EHS Opportunities Stakeholder Involvement Learning & Growth Effective Processes Industrial Hygiene Facility Management Facility Engineering.
Investment Vocabulary. Stock Market  A market in which the public trades stock that someone already owns; the buying and selling of stock.
It is to decide what are the major expenditures or investments a company should make, it’s a method to judge the best investments options to create future.
Surveying the Risks and Benefits of IT Outsourcing Bjarne Berg Student ID: XX20 Due: April 10th, 2006 Chapter-8 Managing Operations “Surveying the Risks.
Reduce Hazardous Waste to Small Quantity Generator Status Bubba Larry, Moe, & Curly.
HAZARDOUS WASTE ($) MINIMIZATION TABLE 4 TEAM Tom Finley Mitch Campbell Melenda Powers Doris Reid Drew Jacobs.
Feasibility Study.
DUST CONTROL: AN OPPORTUNITY ASPEN DIVISION – THE “BIG TOE” THAT LEADS MASSIVE MEDICAL CORPORATION TM.
PFS Strategic Analysis1 Strategic Analysis of PFS Team name Presenter 1 Presenter 2.
Reduction of Worker Ethylene Oxide Exposure (Interim Measures) Craig Torres M. Healy, S. Jahn, D. Gardner.
Intro to Business, 7e © 2009 South-Western, Cengage Learning SLIDE Chapter 19 1 CHAPTER Saving and investment planning Stock investments.
Reduce Worker Exposure to Nickel Dust Project Manager Tito Battung, EH&S Project Team: Ed Guida, R&D Tom Conrad, Sales Anthony Zepeda, Operations Ellen.
Managing Employee Complaints –Plastic Injection Molding
Chapter 15Management of Business Logistics, 7 th Ed.1 Ch. 15: Supply Chain Finance >>>The Connection Landed costs (Production +Transportation costs) of.
Project Ni-Chrom Project Manager: Stephanie Steinberger Project Team Members: Tom, Greg, Armando, and Robin.
1.Introduction 2.Issues and crisis development 3.Defining Issue & crisis management 4. A significant link between issue, crisis & risk management 4. 8.
Lincoln Trail District Health Department Strategic Plan Our Foundation Strategic Goals & Objectives Measures of Success Mission: The Lincoln Trail District.
BTS730 – Systems Analysis and Project Management Cost Management.
Proposal : Minimization of Employee Exposure and Complaints Rosemary Mandatori Ellen Boettrich Roelie Cronje Jenelle Morris.
Repetitive Stress Injury Reduction R. Lapointe A. Ramos R. Pearson C. Alfonso D. Huet.
Select Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
Alex Ezrakhovich Process Approach for an Integrated Management System Change driven.
Strategic Information Initiatives Week 5 Analysis Framework.
Evidence2Success Session 2. 2 As a result of this session, you will be able to: Explain the strategic financing process and aims Identify common goals.
P U B L I C S E R V I C E S State of South Carolina Enterprise Information System Business Case Study SCEIS User Group Briefing Wednesday July 10, 2002.
Savings and Investment Strategies
The Business Plan.
INTRORDUCTION TO IT PORTFOLIO MANAGEMENT Pertemuan 1-2
Cloud University Live: 8 Steps to Build Your Cloud Go to Market Plan
Measuring Impact Guide
The Business Plan.
Factors for Decision Making
Compensation and Capital Investments – Priorities, Measures and Successes Executive Seminar September, 2005.
Stakeholder Involvement
THE FEASIBILTY STUDY LECTURE-5.
Information Technology Universitas Komputer Indonesia
How your investment needs and strategies will change over time
Developing a Business Plan
Measurable Organizational Value and the Business Case
19 Savings and Investment Strategies
How your investment needs and strategies will change over time
Chapter 5.1 Vocab.
The efficiency of attracting and using funds through IPO
Presentation transcript:

Alternative Waste Management Team #1 Annette Craig Eric Clint Chris

2 Our current disposal practice is illegal Risks –fines, criminal prosecution, image We propose: Implement Alternative Disposal Method –Collection, transport, reuse/reclamation

3 EHS Risk Assessment Waste Management is a top priority –Directly affects core value of maximizing profitability Fines Media Exposure Productivity (morale)

4 EHS Strategy Map Key EHS Opportunities Stakeholder Involvement Learning & Growth Effective Processes Implement Alternative Disposal Method by May 9th EHS Dept. Identify & Obtain waste broker and method by April 1 Executive Officers Waste Broker Operations Purchasing Logistics Employees Develop waste handling practices by April 20 Conduct due diligence by April 30 Training for affected employees by May 1 (RCRA, Waste Handling proc.)

5 Project Benefits Reduced Costs –Labor –Transportation Reuse/Reclamation of metals Avoidance of fines and criminal prosecution Improved company image

6 Estimated Project Costs

7 Estimated Savings

8 Financial Analysis Present Value of Savings: PV(Savings) $225 Net Present Value of Savings: NPV(Savings) -$5 Payback Period: 1.6 yrs ROI (x Years): -2% (x4yrs) Internal Rate of Return (x Years): -6% (x4yrs)

9 Conclusions and Recommendations Small initial investment yields long term security Recommend funding this project at cost of $92k