GLAST LAT ProjectMonthly Review, June 30, 2005 4.1.7 DAQ & FSWV2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S 4.1.7.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectMonthly Review, Aug-1, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
Advertisements

GLAST LAT ProjectMonthly Status Meeting Jan 26, Project Status January 26, 2006 Gamma-ray Large Area Space Telescope Lowell A. Klaisner Project.
GLAST LAT ProjectSIU MRR DAQ & FSWV1 1 GLAST Large Area Telescope: G. Haller SLAC (650) Gamma-ray Large Area Space.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Online 1 GLAST Large Area Telescope: I&T Integration Kickoff Meeting EGSE Hardware March 9th,
GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S August Status Meeting.
GLAST LAT ProjectOnline Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST Calorimeter LAT F2F Meeting 17 Mar 2005 Naval Research Lab Washington DC W Neil Johnson 1 Subsystem Mgrs F2F Meeting Calorimeter Subsystem 17 Mar.
Tower Electronics Module and Tower Power Supply EM Tower Electronics Module (TEM) before coating/staking TEM & TPS assembly Close to 60 TEM & TPS assemblies.
GLAST LAT ProjectMonthly Status Meeting, June 30, Cost/Schedule Reports for 4.1 LAT Presentation Presentation May 2005 Month End Gamma-ray Large.
GLAST LAT Project – Cost and Schedule ReviewNovember 3, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review November 3, 2004.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectMonthly Status Review – Sept. 1, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectDOE Rebaseline Review, February 13, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Chief Engineer.
GLAST LAT Project4.1.7 G. Haller V21 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-to-Face Nov 04 Mike Huffer/Gunther.
GLAST LAT ProjectMonthly Status Review – December 2, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Darren Marsh SLAC Performance & Safety.
GLAST LAT Project4.1.7 G. Haller V21 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S September Status
GLAST LAT Project Quarterly Review, Aug. 14, 2001 Gunther Haller1 GLAST Large Area Telescope: Electronics, DAQ & Flight Software Gunther Haller Stanford.
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
GLAST LAT Project Technical/Cost/Schedule Review 09/01/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V41 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S LAT.
GLAST LAT ProjectF-to-F, June 15, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
ISOC Peer Review - March 2, 2004 Section GLAST Large Area Telescope ISOC Peer Review Test Bed Terry Schalk GLAST Flight Software
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
GLAST LAT ProjectF-to-F, March, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
GLAST Calorimeter SLAC LAT Meeting 17Jul 2003 Naval Research Lab Washington DC wnjohnson 1 SLAC Meeting Calorimeter Subsystem 17 July 2003 W. N. Johnson.
GLAST LAT ProjectOct DAQ & FSWV3 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Analysis of cPCI Backplane.
GLAST LAT ProjectTower Power Supply Review Sept 22, 2003 Gunther HallerPart 1, Version 3 1 GLAST Large Area Telescope: Electronics, Data Acquisition &
GLAST LAT ProjectDOE/NASA Status Review, March 30 & 31, DAQ & FSWV8 1 GLAST Large Area Telescope: Gunther Haller SLAC LAT Chief Electronics.
GLAST LAT ProjectPDU/GASU MRR, February 3, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, G. Haller SLAC xxxx LAT Quality Engineer
GLAST LAT ProjectMonthly Review, March 30, DAQ & FSWV2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectGASU TRR, July, DAQ & FSWV1 1 GLAST Large Area Telescope: Presented by G. Haller SLAC (650)
GLAST LAT ProjectMonthly Status Review - ISOC, 1 September GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Monthly Status.
GLAST Large Area Telescope:
GLAST LAT ProjectMonthly Review, March 30, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT Project4.1.7 G. Haller V11 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Monthly Status Gunther.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
DAQ Development P. Roger Williamson Hansen Experimental Physics Laboratory Stanford University GLAST Collaboration Meeting GSFC February 10, 1999.
GLAST LAT Project DOE/NASA Review, March 31, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT Project Technical/Cost/Schedule Review 06/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectMonthly Status Review – June 30, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
P. Shanahan Nov 15, 2003 Page 1 MINOS WBS 2.3: Electronics, DAQ and Database Status Accomplishments since May review Near Detector Electronics production.
GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT Project4.1.7 G. Haller V2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S April Status Gunther.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.
GLAST LAT ProjectMonthly Status Review – Nov 3, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT Project4.1.7 G. Haller V31 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Monthly Status Gunther.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems September 2003 GSFC Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Environment Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, Production SLAC (650)
1 GLAST LAT ProjectMechanical Systems Mechanical Systems November 2003 GSFC Status Marc Campell, Subsystem Manager.
GLAST LAT Project Test Beam Meeting, Apr 18, 2006 E. do Couto e Silva 1/2 Beam Test Hardware Delivery Status Eduardo do Couto e Silva February 18, 2006.
GLAST LAT ProjectSLAC Internal Review, April 16-18, 2002 LAT-PR Electronics and Flight Software WBS GLAST Large Area Telescope: Electronics,
GLAST LAT ProjectMonthly Review, Sept 27, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
Bill Raynor Naval Research Lab
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope: Cost/Schedule Review September 1, 2005
EPU load – same as SIU load except…
GLAST Large Area Telescope
Presentation transcript:

GLAST LAT ProjectMonthly Review, June 30, DAQ & FSWV2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S June Monthly Review Gunther Haller (650) Gamma-ray Large Area Space Telescope

GLAST LAT ProjectMonthly Review, June 30, DAQ & FSWV2 2 TEM/TPS Status & Schedule Status –Qual unit used for FM CAL testing was sent back to SLAC (to be discussed what do with it) –A & B at I&T on tower A and B –#1 thru #5 delivered to I&T –#6, #7: ready to be reviewed and handed to I&T –#8, #9: finished TV, need final test and review –#10, #11: started TV, rdy for I&T next Tuesday –#12: rdy for TV –#13-#19: in works –TEM Module status: Last pre-coat TEM was received at SLAC, tested, sent back to GT Remaining work is –Two Crystek connector problems already being repaired –One Crystek connector problem to be repaired –TPS Modules: Last TPS pre-coat module was received at SLAC, is being modified and will be sent back to assembler this week.

GLAST LAT ProjectMonthly Review, June 30, DAQ & FSWV2 3 PDU Status and Schedule 2 Schedule for first unit –Operated in thermal chamber over temperature, worked –Shipped back to assembler Removed internal EGSE harness Conformal coated boards Mounted boards in enclosure Flight harness is being assembled in enclosure Put on side box is much ahead of GASU/LCB/SIB/CPS (bottle-neck) Should get back to PDU July 9 (once GASU, LCB, SIB, LCB are shipped, plus there is 1 week shut-down at assembler for inventory) Estimated delivery to SLAC Jul 25 Estimated delivery to I&T Sept 5 –2 nd unit lags by 6 weeks

GLAST LAT ProjectMonthly Review, June 30, DAQ & FSWV2 4 GASU Status and Schedule First Unit –Surface-mount assembly (SMT and manual) completed –Flying-probe testing completed –GASU power supply and GASU DQ boards (2 each) integrated into enclosure –EGSE harness being assembled into enclosure –Scheduled ship date (pre-coat): June 30 –Estimated Delivery of final box at SLAC: Sept 15 –Estimated delivery to I&T: September 27 Schedule for 2nd unit –Estimated delivery to I&T: 6 weeks after delivery of first unit

GLAST LAT ProjectMonthly Review, June 30, DAQ & FSWV2 5 SIU/EPU Status and Schedule Status –Issues with voids in cCPI connector assembly joints –Assembled one each (SIB, LCB, CPS) plug-in board –3 backplanes assembled –Pre-coat boards are to be sent to GSFC for X-ray early next week –Then boards go into functional testing and crate assembly/testing –The SIB is guaranteed non-flight since it contains “contaminated” EEPROM’s –In parallel SLAC will perform some qual testing (vib/TC) of LCB/CPS, backplanes to show that >60% fill is sufficient –In parallel some blank test-boards were sent to SAI to assemble connectors Results not in yet EEPROM for SIB: –Have now enough approved parts for 5 boards (fly 5) –Any additional ones required new parts, not schedule from Austin Schedule –Oct 14 for first crate, but not flight –Nov 16 first flight crate to I&T, Dec 14 for 5 th Assumes Aug 4 start date for connector assembly on flight boards

GLAST LAT ProjectMonthly Review, June 30, DAQ & FSWV2 6 Harness & heater Contol Box Harness in assembly, close to be complete Heater Control box PCB’s received (passed coupon testing) Assembly contract placed Part kit sent to assembler –Bottle-neck with other jobs (overall issue due to effort put in cCPI assembly tests)

GLAST LAT ProjectMonthly Review, June 30, DAQ & FSWV2 7 Thermo-testing support Estimated completion for the whole package is next Friday. The whole package includes: –Completing FSW interface, LATTE interface, Power interface (DONE) –Completing assembly of test stand as standalone unit (done by 6/29 AM) –Completing documentation package: Interface test (done by 6/28 PM) Acceptance test procedure (done by 7/1 PM) User's manual (done by 7/6 PM) Complete signoff on documentation (done by 7/7 PM) –Running acceptance test with Lockheed "witness" (scheduled for 7/8) –Then, we just need to ship it to Lockheed and re-test it when it gets off the truck (7/12).

GLAST LAT ProjectMonthly Review, June 30, DAQ & FSWV2 8 VSC Six prototypes up and running in the dataflow lab In use by FSW and FSW/Test (they are executing actual test-scripts) Work on VSC has halted (since 2 weeks ago) pending GASU flight setup, LCB flight setup and TV testing Main Focus is (was) on: 1) production (cables, science interface and checkout of analog monitoring) 2) usage of GPS system (last item to provide *stable* timing, doesn't add functionality) 3) specification of new 1553 driver to support timing (done and coded by Dan as of Monday) 3) resolution of issues concerning fidelity of VSC simulation with respect to real space-craft Currently, none of these items are impacted the ability of VSC users to get on with their jobs, however, 3) is a big ticket item, as the lack of information about the spacecraft has lead to an inadequate simulation and will necessitate both a re-design and re-coding of the VSC and Proxy software. Mike H, in his spare cycles, worked out the re-design and has been communicating closely with all affected users and we are working out a migration plan. First step is an upgrade of the document, which is almost complete

GLAST LAT ProjectMonthly Review, June 30, DAQ & FSWV2 9 Tech Issues Larger TPS ripple issue resolved, potentially have small ripple at certain loads/voltage settings (could also be removed with resistor change, to be decided) AUSTIN EEPROM DPA problems –Received parts for 5 boards (and parts passed DPA) –No schedule yet for additional parts Qualification of cCPI press-fit connector assembly using solder process Need to work on closing open FPGA review items

GLAST LAT ProjectMonthly Review, June 30, DAQ & FSWV2 10 Level 3 Milestone Count

GLAST LAT ProjectMonthly Review, June 30, DAQ & FSWV2 11 Level 3 Milestone List

GLAST LAT ProjectMonthly Review, June 30, DAQ & FSWV2 12 Level 3 Milestone List

GLAST LAT ProjectMonthly Review, June 30, DAQ & FSWV2 13 Level 3 Milestone List

GLAST LAT ProjectMonthly Review, June 30, DAQ & FSWV2 14 Level 3 Milestone List

GLAST LAT ProjectMonthly Review, June 30, DAQ & FSWV2 15 Cost Report

GLAST LAT ProjectMonthly Review, June 30, DAQ & FSWV2 16 FTE Report (DOE/NASA-funded only)

GLAST LAT ProjectMonthly Review, June 30, DAQ & FSWV2 17 FTE Variance Explanation In general delays at flight assembler, caused mainly by unexpected large effort put into cPCI assembly tests Caused delays of all modules at that assembler since resources were concentrated on connector tests Because of delays man-power to test can not be reduced at this time, since tests are still outstanding Impact in schedule and cost