1 09 October 2007 1 SOIS Report to CESG/CMC 9 October 2007 Patrick Plancke, C. Taylor.

Slides:



Advertisements
Similar presentations
CESG, Fall 2011, 5 th November 2011 Stuart Fowell, SciSys Device Virtualisation and Electronic Data Sheets.
Advertisements

1 Cross Support Architecture (CSAWG) Overview, Status, Goals Takahiro Yamada JAXA.
Distributed, Real- Time, Embedded Systems Presented by: Stuart D Fowell SOIS Plug-and-Play Architecture and Proposed Mapping onto SpaceWire.
November SLS RFM and RNG REPORT 18 November 2004.
30-March-2015-cesg-1 Martin Suess (AD) Rick Barton (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/SPARTA (a Parsons Company) October.
Apr12-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
Cesg-1 June 2010 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
10-Dec-2012-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
31 st October – 4 th November 2011 Fall 2011 Meeting Agenda Boulder, Colorado, USA SOIS Application Support Services WG Conclusions & Actions.
1 26 October 2005 Space Internetworking Services Report to the CCSDS Management Council 26 October 2005 R. Durst, D. Stanton.
Delta-DOR SIG: Report of the Fall 2007 Meeting Heppenheim, Germany October 5th, 2007 Roberto Maddè ESA/ESOC
Chris Taylor TEC-EDS 1 SOIS Prototyping Activities CCSDS SOIS Berlin 2008 C. Taylor ESA- ESTEC.
1 Space Communications Cross Support Architecture WG: Charter and Work Plan October 2010 London, UK Takahiro Yamada, JAXA/ISAS.
May11-cesg-1 status:OKCAUTIONPROBLEM comment: Very Good SOIS Area Report Wireless WG Goals for the spring meeting Complete the discussions and agree on.
Cesg-1 SLS REPORT 7 May 2010 Jean-Luc Gerner (AD) Gilles Moury (DAD) SPACE LINK SERVICES (SLS) AREA SLP and NGU sections Only.
16 th – 19 th April 2012 Spring 2012 Meeting Agenda Darmstadt, Germany SOIS Application Support Services WG.
PS 1 12 June 2006 SEA Opening Plenary Rome, Italy, 12 June 2006.
ESA UNCLASSIFIED – For Official Use SOIS Evaluation by the Primes F. Torelli (ESA) Software Reference Architecture - Focus on the Execution Platform ADCSS.
1 Cross Support Architecture (CSAWG) Overview, Status, Goals Takahiro Yamada JAXA.
Ajh January 2007 CCSDS “Books” Adrian J. Hooke CMC Meeting, Colorado Springs 26 January 2007.
1 SOIS Plenary Washington March 2008 Chris Taylor.
Information Architecture WG: Report of the Fall 2010 Meeting October 29, 2010 Dan Crichton, Chair Steve Hughes (presenting) NASA/JPL.
Real-Time Systems Presented by: Stuart D Fowell SciSys SOIS Prototyping Activities CCSDS Spring 2008 Meeting, Washington D.C, USA.
SOIS APP Working Group Overview. Presentation Overview Application Support Services Electronic Datasheets ESA Project History and Plans Standards Documentation.
ESA UNCLASSIFIED – For Official Use Recap of SOIS Evaluation by the Primes F. Torelli (ESA) CCSDS Spring Meeting, 23/03/2015.
November MOIMS AREA PLENARY NAVIGATION WG REPORT November 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
13-17 October 2008 Berlin, Germany ty - 1 Cross Support Architecture WG Closing Plenary Report Spring 2009 Meeting Takahiro Yamada (JAXA/ISAS) 25 April.
Nov11-cesg-1 SOIS Area Report Wireless WG Primary Objectives for the fall meeting Establish lessons learned from the Asset Management (AM) Magenta Book.
10-Dec-2012-cesg-1 Keith Scott (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA REPORT.
Wyn Cudlip BNSC/QinetiQ Presentation to WGISS25 China, February 2008 CCSDS Liaison Consultative Committee on Space Data Systems.
CCSDS SOIS Wireless Working Group (WWG) 01-Sep-2015 Monthly Webcon/Telecon 1 CCSDS SOIS Wireless WG Monthly Webcon: 01-Sep Sep-2015.
Information Architecture WG: Report of the Spring 2004 Meeting May 13, 2004 Dan Crichton, NASA/JPL.
Cesg-1 22 October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
1 CCSDS 2007 Fall Meeting SOIS Plenary Chris Taylor Estec (27/09/2007.
Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC,
Apr12-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
Distributed, Real- Time, Embedded Systems Presented by: Stuart D Fowell Proposed SOIS Plug-and-Play Architecture and Resulting Requirements.
Apr12-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
1 24 January 2007 SIS Report to CESG/CMC 24 January 2007 R. Durst, D. Stanton.
SOIS EDS and Onboard Architectures. ESA ‘de-facto’ Architecture PUS Services Mission Applications Data Handling PUS TM/TC Internal Datapool API System.
CCSDS SOIS Working Group Meeting – Berlin, Germany 14th of October 2008 Prototyping of CCSDS SOIS services on 1553 Bus Sev Gunes-Lasnet, Olivier Notebaert.
1 SOIS P&P input. 2 Introdcution As part of the work to standardise onboard communication services, the CCSDS SOIS WG has recently delivered new draft.
Cesg-1 28 April October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
SOIS Application Support Service WG and SOIS Plug-and-Play BoF Spring 2008 Report.
CCSDS Reference Architecture Notes from SAWG discussion & from SEA Report to CESG/CMC 12 & 17 Nov 2014.
November SECURITY WORKING GROUP REPORT November 2004.
Information Architecture BOF: Report of the Fall 2003 Meeting October 28, 2003 Dan Crichton, NASA/JPL.
Standard Onboard interface Services – Overview and status Chris Taylor Stuart Fowell October 09.
07-Apr-2014-cesg-1 Jonathan Wilmot (WG Chair) Ramon Krosley (DWG Chair) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA APP WG.
Real-Time Systems Presented by: Stuart D Fowell SciSys AMS Prototyping CCSDS Spring 2008 Meeting, Washington D.C, USA.
May SPACE LINK AREA MID-TERM REPORT SUMMARY TECHNICAL STATUS 1.DATA COMPRESSION WG Goal : specify an image compression algorithm fulfilling identified.
Security WG: Report of the Fall 2004 Meeting November 19, 2004 Howard Weiss.
1 Systems Architecture WG: Charter and Work Plan October 23, 2003 Takahiro Yamada, JAXA/ISAS.
CEOS WGISS Meeting, Hanoi May CCSDS Liaison Consultative Committee on Space Data Systems Wyn Cudlip BNSC/QinetiQ Presentation.
CSS AREA REPORT 24 January 2007 Colorado Springs, USA CSS AREA: CSEG/CMC Report, Winter 2007 Meeting Erik Barkley (NASA/JPL) Area Director Yves Doat (ESA)
SOIS Services Version 3, with post 19 Jan 2016 Telecon mods.
Systems Architecture WG: Report of the Spring 2005 Meeting April 14, 2005 Takahiro Yamada, JAXA/ISAS.
Spacecraft Onboard Interface Services Application Support Services Working Group (SOIS-APP WG) CCSDS Spring 2013 Meeting.
Security WG: Report of the Fall 2003 Meeting October 28, 2003 Howard Weiss, NASA/JPL/SPARTA.
Chris Taylor TEC-EDS 1 Communication Management CMD & Data Acquisition Services Time Access Service File & Packet Store Services Message Transfer Service.
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/Cobham (Parsons) October 2011.
SOIS APP Working Group Overview
SciSys SOIS Prototyping Activities
SOIS Prototyping Activities
SOIS Application Support Services WG – Fall 2009 Meeting
SPACECRAFT ONBOARD INTERFACES SERVICES
SOIS-APP Working Group Report Jonathan Wilmot (WG Chair)
SPACECRAFT ONBOARD INTERFACES SERVICES
SPACECRAFT ONBOARD INTERFACES SERVICES
Presentation transcript:

1 09 October SOIS Report to CESG/CMC 9 October 2007 Patrick Plancke, C. Taylor

2 09 October SOIS AREA REPORT CONTENTS A.CURRENTLY ACTIVE WGs AND BOFs WITHIN AREA B.SUMMARY DOCUMENT STATUS C.SUMMARY TECHNICAL STATUS OF EACH WG & BOF D.INTRA & CROSS-AREA TECHNICAL ISSUES E.OTHER ISSUE AND CONCERNS F.RESOLUTIONS FROM THIS MEETING

3 09 October Application Support Services WG 2.Subnetwork Services WG 3.Plug and Play BOF 4.Wireless BOF 5.Transducer BOF – Work terminated (absorbed) A.LIST OF CURRENT WGs AND BOFs WITHIN AREA SOIS AREA REPORT

4 09 October WG Document NumberStatus Spacecraft onboard interface services850.0-G-1 Application Support Services Device Access Service Device Data Pooling Service Time Access Service File Access Service Device Enumeration Service Device Virtualisation Service R R R R-1 Under preparation Under Preparation Subnetwork Services Subnetwork Packet Service Subnetwork Memory Access Service Subnetwork Time Distribution Service Subnetwork Device Discovery Service Subnetwork Test Service R R R R R-1 SOIS AREA REPORT Documents

5 09 October Application Services Working Group Goal: Develop SOIS Application support layer services and associated protocols if required Working Group Summary progress: Rid review completed, Red book update underway Agreement reached on use of AMS Plug and play approach agreed with P&P BOF Problems and Issues: Prototyping delay Working Group Summary Situation: SOIS AREA REPORT status:OKCAUTIONPROBLEM comment: Pending prototyping and red book development

6 09 October Subnetwork services Goal: Develop SOIS Subnetwork Services and associated protocols if required Working Group Summary progress: Rid review completed, Green book updated, Red book update underway Previous meeting with SpaceWire WG very positive, SOIS compliant protocols under preparation by SpaceWire WG Interaction with ECSS Milbus group underway CAN Bus planned for 2008 Problems and Issues Introduction of new signalling service requires name change of Time distribution Red Book – to Synchronisation service Prototyping delay Working Group Summary Situation: status:OKCAUTIONPROBLEM comment: Pending prototyping SOIS AREA REPORT

7 09 October Plug and Play BOF Goal: Develop SOIS plug and Play capability Working Group Summary progress: Definition of “SOIS Device Plug-and-Play” agreed: “SOIS Device Plug-and- Play is the set of automated mechanisms used to discover, learn the capabilities of, and provide access to a device in a spacecraft’s onboard (sub-)network.” Use cases developed ( FDIR, rapid spacecraft assembly, integration and test, BioNet) and tested against straw man architecture Plan of work established for remaining SOIS Red books Problems and Issues BOF Now has clear plan of work, do we create ‘high profile’ working group or absorb work into existing working groups? Working Group Summary Situation: status:OKCAUTIONPROBLEM comment: Pending prototyping SOIS AREA REPORT

8 09 October Wireless BOF Goal: CCSDS focus group for wireless technologies. Make recommendations pursuant to standardization of applicable wireless network protocols Working Group Summary progress: Consensus gained in 3 areas of work: Inventory control Intra-vehicle Assembly, Integration, and Test Draft charter prepared for working group Problems and Issues (Heads up) Wireless for Planetary surface currently not covered Working Group Summary Situation: status:OKCAUTIONPROBLEM comment: SOIS AREA REPORT

9 09 October D. Cross Area Issues SOIS requires a calibration service to support access to sensors. This was previous highlighted and an understanding reached that MOIMS would cover the topic. It is understood that MOIMS have not yet started the work so the agreement needs to be reviewed in terms of schedule and who does what – action assigned SOIS AREA REPORT

10 09 October E. OTHER ISSUES AND CONCERNS None SOIS AREA REPORT

11 09 October F. RESOLUTIONS FROM THIS MEETING 1. Propose SOIS Plug and Play BOF to become either a stand alone WG or for the work to be incorporated into SOIS Application services WG 2. Propose Wireless BOF to become WG 3. Propose Max Ciccone as Application service Deputy WG chair SOIS AREA REPORT

12 09 October Back-up slide – Wireless WG Wireless categories: Intra-vehicle: Internal vehicle (or habitat) extremely short-range wireless links and networking (up to 10 m range) Inter-vehicle: Vehicle-to-vehicle short-range and medium range (up to 20 km) Planetary surface-to-surface wireless links and networking (up to several kilometers). - EVA (Extra-Vehicular Activity) local links with planetary rover vehicles (RV) and/or habitats; - RV-habitat links when RV is close to habitat; - Links between independent local systems (e.g., habitats, robots, external assets) Orbiter relay-to-planetary surface links and networking SOIS AREA REPORT

13 09 October Back-up slide – Wireless WG SOIS AREA REPORT Overview of current deliverables - Draft Green Book containing rational, design-drivers, Wireless categories, approach etc - Intra-vehicle: Summarize scenarios, requirements, and suggested wireless protocols requirements for asset/inventory tracking and control via wireless communications in a Magenta Book; - Intra-vehicle: Summarize scenarios, requirements, and suggested wireless protocols requirements for intra-vehicle communications (e.g., a spacecraft or habitat), other than inventory management, in a Magenta Book; - Assembly-Integration-Test: Summarize scenarios, requirements, and suggested wireless protocols requirements for terrestrial assembly- integration-test (AIT) activities in a Magenta Book;