DC12: Tracking/simulation needs CLAS12 Drift Chambers – Physics specifications high efficiency at 10 35 large solid angle (5 o to 40 o ; 50% f coverage.

Slides:



Advertisements
Similar presentations
SOCRAT: a SOftware for Clas12 Reconstruction And Tracking 04/25/10 S. Procureur (CEA-Saclay)
Advertisements

May 14, 2015Pavel Řezníček, IPNP Charles University, Prague1 Tests of ATLAS strip detector modules: beam, source, G4 simulations.
Micromegas for CLAS12 Central Detector - Update Franck Sabatié November 19th 2009 Micromegas option for the Central Detector Why, Where, How ? R&D milestones.
Aging, High Rate and Shielding L. Lopes Lip-Coimbra.
A Silicon Disk Tracker in forward direction for STAR News since November 2000 Physics Capabilities capabilities Requirements / Potential Technologies Possible.
GlueX Simulations Status Report on CD3 geometry Richard Jones GlueX Collaboration Meeting, Newport News, January 10-12, 2008.
Downstream e-  identification 1. Questions raised by the Committee 2. Particle tracking in stray magnetic field 3. Cerenkov and calorimeter sizes 4. Preliminary.
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
LBNE R&D Briefing May 12, 2014 LBNE R&D Briefing May 12, 2014 LArIAT and LBNE Jim Stewart LArIAT EPAG Chair BNL LBNE LARIAT-EPAG J. Stewart BNL T. Junk.
HPS Test Run Setup Takashi Maruyama SLAC Heavy Photon Search Collaboration Meeting Thomas Jefferson National Accelerator Facility, May 26-27,
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Drift Chambers for CLAS12 - Mac Mestayer Context: how does it fit within CLAS12 ? Specifications:
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
Timepix-3 test All-ceramic InGrid The focusing TPC
NanoPHYS’12 – December 17-19, 2012 K. Nakano, S. Miyasaka, K. Nagai and S. Obata (Department of Physics, Tokyo Institute of Technology) Drift Chambers.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
Status of straw-tube tracker V.Peshekhonov, D.Peshekhonov, A.Zinchenko JINR, Dubna V.Tikhomirov P.N.Lebedev Physics Institute, Moscow Presented on the.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
EPS-HEP 2015, Vienna. 1 Test of MPGD modules with a large prototype Time Projection Chamber Deb Sankar Bhattacharya On behalf of.
RPCs of BESIII Muon Identifier  BESIII and muon identifier  R&D  Mass production  Installation Zhang Qingmin Advisor: Zhang Jiawen.
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
Mac Mestayer DC12 Status: as of Feb., 2008 Decide on endplate, feedthrough, wire material –guidance from small prototype chambers mainly electrical stand-off.
CMS WEEK – MARCH06 REVIEW OF MB4 COMMISSIONING DATA Giorgia Mila
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
Latifa Elouadrhiri Jefferson Lab Hall B 12 GeV Upgrade Drift Chamber Review Jefferson Lab March 6- 8, 2007 CLAS12 Drift Chambers Simulation and Event Reconstruction.
Positional and Angular Resolution of the CALICE Pre-Prototype ECAL Hakan Yilmaz.
9 September 2004The Straw Tube Chamber1 The CDC Curtis A. Meyer Carnegie Mellon University Physics Requirements and Specifications Prototype Construction.
Main Drift Chamber Yuanbo Chen Ihep Motivation (MDC IV) The BGO crystal used in L3 will be used for BES III ’ s Calorimeter. The space for MDC.
Silicon Detector Tracking ALCPG Workshop Cornell July 15, 2003 John Jaros.
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
S. AUNE 15/09/08 Micromegas Bulk for CLAS12 tracker.
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates.
Jonathan BouchetBerkeley School on Collective Dynamics 1 Performance of the Silicon Strip Detector of the STAR Experiment Jonathan Bouchet Subatech STAR.
CLAS12 Drift Chamber Prototyping
00 Cooler CSB Direct or Extra Photons in d+d  0 Andrew Bacher for the CSB Cooler Collaboration ECT Trento, June 2005.
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates.
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
2007 Oct 21 GEM Panel for LP1 Akimasa Ishikawa (Saga University) For CDC group.
1 Nick Sinev, ALCPG March 2011, Eugene, Oregon Investigation into Vertex Detector Resolution N. B. Sinev University of Oregon, Eugene.
CP violation in B decays: prospects for LHCb Werner Ruckstuhl, NIKHEF, 3 July 1998.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
The Detector Performance Study for the Barrel Section of the ATLAS Semiconductor Tracker (SCT) with Cosmic Rays Yoshikazu Nagai (Univ. of Tsukuba) For.
Review of Micromegas Tracking Detectors for CLAS12 – May 7, 2009 Reviewers: Madhu Dixit, Mac Mestayer Presentations covered the following topics: –detector.
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Drift Chambers for CLAS12 - Mac Mestayer Context: how does it fit within CLAS12 ? Specifications:
FIRST RESULTS OF THE SILICON STRIP DETECTOR at STAR Jörg Reinnarth, Jonathan Bouchet, Lilian Martin, Jerome Baudot and the SSD teams in Nantes and Strasbourg.
The BoNuS Detector: A Radial Time Projection Chamber for tracking Spectator Protons Howard Fenker, Jefferson Lab This work was partially supported by DOE.
Marcello Abbrescia RPCs for CMS during Phase II RPC rate capability M. Abbrescia, The dynamic behaviour of Resistive Plate Chambers, NIM A 533 (2004) 7–10.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Concept Design for LBNF Far detector (LAr single phase)
Joerg Dubert’s Questions as you all aware we currently do not yet know how the final mechanical design of the new Small Wheel will look like. Nevertheless,
Comparison of different chamber configurations for the high luminosity upgrade of M2R2 G. Martellotti - LNF - 13/03/2015 Roma1 + Alessia.
1 PANDA FWD Meeting, GSI-Darmstadt, Preparation of the TDR for the forward tracker University Ferrara + Jagiellonian University, Cracow Main.
Physics requirements  mapping spec’s Strategy: analyze measurements to get field Mapping plan: where/how to map Engineering design: sensor, fixtures,
Technical Design for the Mu3e Detector Dirk Wiedner on behalf of Mu3e February Dirk Wiedner PSI 2/15.
Precision Drift Tube Detectors for High Counting Rates O. Kortner, H. Kroha, F. Legger, R. Richter Max-Planck-Institut für Physik, Munich, Germany A. Engl,
Drift Chamber Prototyping Plans at ODU Gail Dodge, Tom Hartlove, Mac Mestayer Nov. 18, 2005 Goals for FY06: Design 144 cell prototype of R1 Drift Chamber.
M.C. Studies of CDC Axial/Stereo Layer Configuration David Lawrence, JLab Sept. 19, /19/08 1 CDC Tracking MC Studies -- D. Lawrence, JLab.
Charged Particle Tracking for CLAS12
CLAS12 Forward Tracking: Status and Challenges
(On Behalf of CMS Muon Group)
Dept. of Physics and Space Sciences, Florida Institute of Technology
Tracking results from Au+Au test Beam
BoNuS: Radial-Drift TPC using Curved GEMs
WBS: : Tracking for CLAS12
Drift Chambers for CLAS12 -Mac Mestayer
Region I: stringing 1/3 done on 1st chamber!
CLAS12 Tracking Design (ca. 2005) a basic design parameters
Feb. 2, 2007 CLAS12 Upgrade Workshop Mac Mestayer
ScECAL+AHCAL+TCMT Combined Beam FNAL
Preparation of the CLAS12 First Experiment Status and Time-Line
Presentation transcript:

DC12: Tracking/simulation needs CLAS12 Drift Chambers – Physics specifications high efficiency at large solid angle (5 o to 40 o ; 50% f coverage at 5 o ) good resolution (~1% dp/p; ~ 1mrad angle) – Basic design six 6-layer superlayers; 112 wires per layer minimum dead area – March review momres, FASTMC, gsim12  basic design works May 8, 2008CLAS12 Detector Review - backups

DC12: further sim./recon. needs No further sim/recon work needed for basic design Additional work IS needed for: – detailed design of Moller shielding – detailed design of forward vertex tracker – design and specifications for chamber alignment and magnet field measuring systems May 8, 2008CLAS12 Detector Review - backups

Software: how to improve tracking use double hits (CLAS-Note ) use segment angle as well as location in link table enforce consistency between l-r ambig. resolution and global track parameter early find tracks with no TOF hit write special utility to find out-of-time accidental tracks; use unusual pattern of time residuals to measure time derive off-diagonal terms in error matrix May 8, 2008CLAS12 Detector Review - backups

Performance: Drift Chamber Rate Capability Rate Capability: times “CLAS” – factor of 3: one cell’s angular size 1/3 as large o instead of o, 70% as many wires – factor of 1.5: smaller time window thicker wire, higher field, faster gas – factor of ~ 5: better shielding larger solenoid, better absorber May 8, 2008CLAS12 Detector Review - backups

Performance: efficiencies; resolutions Rate studies: – extrapolation from present CLAS decrease solid angle, time window, thickness of DC cells – estimates of layer occupancy present studies show efficiency fall-off about 4% occupancy estimates don’t require track reconstruction – estimates of track efficiency and fakes input random background with correct average occupancy use a cut-based track finder – generate tracks with background; reconstruct tracks the gold standard May 8, 2008CLAS12 Detector Review - backups

Rate Simulations : methods Fractional occupancy – efficiency is ok if less than 4% of the wires are hit estimated with GEANT3 and GEANT4,  t = 150 ns GEANT3 tested against data taken with a solenoidal shield/absorber “DC-NIM” study May 8, 2008CLAS12 Detector Review - backups

Forward Tracker: Momentum Resolution fractional momentum resolution vs. momentum different configurations May 8, 2008CLAS12 Detector Review - backups

Material in Tracking System MaterialThickness (cm)Rad. Length (%) air20 cm0.07 % Silicon (6-layers)0.18 cm1.9 % CO cm0.8 % mirror2 cm0.8 % DC (gas + wires)25 cm0.35 % air95 cm0.3 % DC (gas + wires)40 cm0.5 % air80 cm0.25 % DC (gas + wires)50 cm0.6 % May 8, 2008CLAS12 Detector Review - backups

Endplates fit into Frames New idea: frames are multi-part and pre-bowed frame endplate May 8, 2008CLAS12 Detector Review - backups

Region 2 conceptual design May 8, 2008CLAS12 Detector Review - backups

Feedthroughs Electrical standoff: surface (G10 and plastice): ~ 0.25 cm / 1000 V gas: keep surface E-field below 20 kV/cm (50?) ‘smooth’ electrode: 3000 V  0.15 cm gap Material of tip: plastic (increases field at wire - no dead area, hot? metal (decreases field at wire - no hot areas, dead? May 8, 2008CLAS12 Detector Review - backups

CLAS12 DC Fixtures/Accessories Assembly fixtures (build the ‘boxes’) – to place endplates into pre-bowed frames Stringing fixtures (string the chambers) – pre-tension at correct orientation – string, tension, test Mounting fixtures (position accurately) – cryostat-chamber connection – move chamber to accurate docking mechanism – allow easy access for repair, maintenance Chamber disconnect junction box May 8, 2008CLAS12 Detector Review - backups

Material Choices Endplates – aluminum: easy to machine, longer feedthroughs, large eddy-currents, stronger than G10 – G10-CR: vice-versa Frames – stainless steel: non-magnetic enough? Feedthroughs – Noryl (with glass beads) – metal tips: machined or formed? – wire: Aluminum, Cu-Be, stainless? electrical stand-off constructability May 8, 2008CLAS12 Detector Review - backups

Electrical issues: calculations for a 2 cm. (s - f) wire spacing diam. (microns)voltagefields (kV/cm) sfgsfgsfggain e e e e0 4 May 8, 2008CLAS12 Detector Review - backups

Prototypes: Reg. 1 prototype: – test: e’static stability, excessive current draw, construction techniques – status: ~200/800 wires done, ready for first tests wire-test chamber: (“baby” chamber) – test cathode emission from (thin) field wires – measure surface fields near endplates – status: next week, bring laser to ODU ISU beam test: – test efficiency, gain versus position along wire – one test done, second due soon May 8, 2008CLAS12 Detector Review - backups

CLAS12 DC Work Plans Build R1 prototype box Clean endplates, re-assemble String, operate R1 prototype Verify design Build wire-test chamber Chamber tests: field wire diameter Specifications for wire Preliminary electronics design Conceptual design for Reg. 2 Conceptual design for Reg. 3 Decide whether to use ass’y. fixture Build torus-chamber prototype Study cable routing Decide on angle between endplates Drawing, specs for assy. fixture Develop detailed stringing procedures Drawing, specs for stringing fixtures ISU beam test Decide on feedthrough design Drawing, specs for feedthroughs Drawing, specs for R1 boxes Drawing, specs for R2 boxes Drawing, specs for R3 boxes Conceptual design: mounting, installation Drawing, specs for chamber-torus attachments Design complete Oct 08 NOW 2008 May 8, 2008CLAS12 Detector Review - backups

DC12 Status (winter ‘07-’08) Decide on endplate, feedthrough, wire material – guidance from small prototype chambers mainly electrical stand-off and noise issues Decide on frame designs – guidance from Reg. 2 prototype – constructability and accuracy of pre-bowed endplates Large prototype tests – improve procedures, look for unknown problems Proceed with drawings, vendor qualification, … May 8, 2008CLAS12 Detector Review - backups

Operational Problems & Solutions Broken wires – larger diameter sense wires – stress-free mounting system – more extensive “shake-down” – better temperature control of hall (already implemented) Circuit board corrosion – go to conformally-coated pcb’s – better humidity control (already implemented) – finer segmentation (partially implemented) High current draw – stricter irradiation procedures (already implemented) – better humidity control (partially implemented) – more HV channels (planned for near-term) May 8, 2008CLAS12 Detector Review - backups

Risks: Stringing the Chambers “Harder to do” – Region 1: 7.5 mm cell; 1.8 m long wire – ratio L/D ~ 235 (was 175) – lower wire tension ? “Easier to do” – smaller chambers 7 m endplate  4 m endplate – chambers are flat stereo wires are all parallel – sense wire: 20  m  30  m less breakage, easier to see ! – same design for all regions May 8, 2008CLAS12 Detector Review - backups

Cost Comparison: Other Drift Chambers Phenix DC’s (“jet-cell” type with 36 super- modules) – Mechanical costs: $250/sense wire (but 7-8 other wires per sense wire) $50/total wire CLEO-c DC’s (“open-cell” with “square” cells) – Mechanical costs: $40/total wire (labor not included) CLAS12 DC’s (“open-cell” with hexagonal cells) – Mechanical costs: $180/sense wire $49/total wire (labor included) May 8, 2008CLAS12 Detector Review - backups

CLAS12 / CLAS costs (not labor) ratio task CLAS12 DC’s have 70% as many wires Some tasks don’t depend on wire count May 8, 2008CLAS12 Detector Review - backups

CLAS12 Drift Chambers : Labor task man-weeks PED tasks May 8, 2008CLAS12 Detector Review - backups

Methods of Cost Estimation Endplates: cost = (a + b * nwires) * inflation; a =.2, b =.8 “boxes”: cost = old cost * 0.75 * inflation Wires, pins, feedthroughs; cost = old_cost * wire_ratio * inflation May 8, 2008CLAS12 Detector Review - backups

Costs: Stringing the Chambers Estimate the time; use labor cost tables “Bottoms-up” estimate - based on previous experience – 2 people, 15 mins. per wire for stringing – “stringing” per se takes 1/3 to 1/2 of the time – 3 crews of 5 stringers for ~ 2 years – techs / scientists doing support, QA/QC “Top-down” - simple scaling of total elapsed time, accounting for fewer wires May 8, 2008CLAS12 Detector Review - backups

CLAS12 Drift Chamber Procurements/Expenses Task k$ stringing labor - estimate time - use labor rate May 8, 2008CLAS12 Detector Review - backups

CLAS12 Drift Chamber: Construction Costs PED: 0.34 M$ Const: 4.50 M$ Total: 4.84 M$ May 8, 2008CLAS12 Detector Review - backups

CLAS12 Drift Chambers: Cost Same concept as present CLAS chambers Small extrapolations from current designs – smaller cells, thicker wire, faster gas Cost estimates based on prior experience – 180$ / sense wire : mechanical costs – major cost is “wire-stringing” – re-use most electronics Schedule and manpower allocation: prior experience Experts on staff and in CLAS collaboration May 8, 2008CLAS12 Detector Review - backups

6 construction categories: “Boxes”- frames, endplates Wire - sense, field, guard Wire Attachments - feedthroughs, pins Electronics Boards - high voltage, signal Assembly Fixtures - to ‘string’ chambers Installation Fixtures - to install chambers 6 construction phases: Design - accomplish physics goals, fit Award - detailed spec’s, vendor selection Accept - receive, inspect Assemble - build complete chambers Install - install chambers Commission - see particles CLAS12 Drift Chamber Construction: Scenario Analysis 36 scenario “node points” where problems might arise May 8, 2008CLAS12 Detector Review - backups

phasepossible problems and mitigation design changes to other detector elements force revisions: group coordination award vendors cannot meet spec’s, cost: extensive budgetary estimates, many vendors accept part out of spec.: pre-planned, rapid inspection procedures assemble unforeseen problems in fit: fully tested with prototypes install unforeseen problems in installation: installation models built, tested commission finished chamber: detailed plans already developed “Boxes” - scenario analysis May 8, 2008CLAS12 Detector Review - backups

phasepossible problems and mitigation design spec’s too tight or too loose: extensive previous experience award vendors cannot meet spec’s, cost: extensive budgetary estimates, many vendors accept part out of spec: test wire spool-by-spool as it arrives, pre-planned procedures assemble unforeseen problems with chamber stringing: extensive experience, much time allocated install - not applicable - commission chambers noisy or inefficient: extensive previous experience Wire - scenario analysis May 8, 2008CLAS12 Detector Review - backups

phasepossible problems and mitigation design specifications set wrong: extensive previous experience award vendors cannot meet spec’s, cost: extensive budgetary estimates, many vendors accept part out of spec: test part-by-part as it arrives, pre- planned procedures assemble unforeseen problems with feedthrough installation: previous experience, much time allocated install - not applicable - commission - not applicable - Wire Attachments - scenario analysis May 8, 2008CLAS12 Detector Review - backups

phasepossible problems and mitigation design changes to wire pattern force revisions: group coordination award vendors cannot meet spec’s, cost: extensive budgetary estimates, many vendors accept part out of spec: test part-by-part as it arrives, pre- planned procedures assemble unforeseen problems with board installation: previous experience, much time allocated install - not applicable - commission noisy operation: prototyping Electronics boards - scenario analysis May 8, 2008CLAS12 Detector Review - backups

phasepossible problems and mitigation design changes to other detector elements force revisions: group coordination award vendors cannot meet spec’s, cost: standard items, many vendors accept part out of spec.: pre-planned, rapid inspection procedures assemble separate parts don’t fit: much time allocated install - not applicable - commission - not applicable - Assembly fixtures - scenario analysis May 8, 2008CLAS12 Detector Review - backups

phasepossible problems and mitigation design changes to other detector elements force revisions: group coordination award vendors cannot meet spec’s, cost: fairly standard parts, many vendors accept part out of spec.: pre-planned, rapid inspection procedures assemble - not applicable - install unforeseen problems in installation: installation models built, tested commission - not applicable - Installation fixtures - scenario analysis May 8, 2008CLAS12 Detector Review - backups

Drift Chambers for CLAS12 Response to Mar Reviewers’ Comments We strongly support the Hall B group’s plan to build full-scale prototype drift chambers as soon as possible--- – chamber is partially strung, many tests performed --- “to test new metal trumpets as well as integrated plastic feed-throughs--- – prototype tests done, go with metal-tipped We urge the group to --- explore cost-saving construction procedures --- – endplate machining will likely be less expensive (probably due to more computer-controlled milling machines); in new budget --- urge the group to explore design modifications to the region 2 chambers that will maximize active area near the CLAS12 beamline – we are investigating an ‘endplate in a trussed frame’ design which gives more solid angle at small  ; slightly less at larger  --- to do detailed Monte Carlo simulations --- should include estimates of the material in the silicon detectors – done May 8, 2008CLAS12 Detector Review - backups

response to comments (continued) --- include systematic variations of component and installation alignments – important; will do ---how best to combine tracking information from the silicon strip detectors and the drift chambers – strip-dc matching is fully efficient; --- studies of chamber misalignment --- – we agree that alignment is important; chamber design includes alignment considerations; we also plan a detailed magnetic field map --- installing helium bags – TOF folks don’t like it; we’re studying it May 8, 2008CLAS12 Detector Review - backups