1  Services Overview  Implementation plan (capacity overview)  Summary of completed project Site Design Services.

Slides:



Advertisements
Similar presentations
Workplace Surveys and Inspections Effective Safety and Health Management System Effective Anticipation and Detection of Hazards Effective Prevention and.
Advertisements

Implications of Heavy Metals in Sewage Sludge Where Do We Stand on Regulations?
How to make a Successful Risk Management Education Grant Application National Farm Business Management Conference June , 2010.
Hazel Messenger UHBS Developing creativity through assessment using case studies.
Final Report Document. Format Title Page Executive Summary Table of Contents Introduction Mission Statement Main PDS items Brief justification of the.
© Nintendo Game Document Game Development - Spring
Project Risk Management
Health and Safety Risk Assessment (RA) End presentation Risk Assessment (RA)
1 Introducing BSI Health & Safety Self-assessment Online.
Office of Highway Safety Bridge Load Rating Dan Walsh.
Florida Department of Environmental Protection Standards and Assessment Linear Vegetation Survey (LVS) Sampling Method October 2012.
Pump VFD Provisional Standard Protocol Regional Technical Forum June 18, 2013.
University of Montenegro Faculty of Electrical Engineering Work Package 7 Review of the project activities and objectives Fostering innovation based research.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Manitoba Pork Council Loss Prevention Program Strategy A Detailed Explanation of the Loss Prevention Program Miles Beaudin, MBA, BSc.Ag., P.Ag.
Intersection Control Evaluation (ICE). Outline  Background  ICE Process  Impacts  Current Status.
Authorization and Inspection of Cyclotron Facilities Authorization for the Decommissioning of the Facility.
Development of National Tuberculosis Communication Strategies in Central Asia Jamilya Ismoilova, Kayt Erdahl, Gulnora Rasulova, Saodat Koymova Project.
Chapter 4 The Project. 2 Learning Objectives Third phase starts after a contract is drawn up and ends when the project objective is accomplished; final.
United Nations Counter-Terrorism Committee Executive Directorate (CTED) Revised documents and procedures for assessing Member States’ implementation efforts.
DEPARTMENT OF REGIONAL DEVELOPMENT, PRIMARY INDUSTRY, FISHERIES AND RESOURCES Mining Management Act Workshop and Information Session Mining Operations.
Chapter 7 IS630. Project Design  Technical Design & Specification Network and System Architecture & Design Software System Architecture & Design  Database.
PROJECT SCOPING FOR LOCAL AGENCY FEDERAL AID PROJECTS.
Site Construction & Installation Services
Specification & Quantities Estimating
Modification Process Simplification Mike Hayes Exelon Nuclear.
The Electrical Testing of Laparoscopic Instruments WORKSHOP Testing of Medical Devices Mr John Robson Director, Biomedical Engineering Flinders Medical.
Survey of National Classifications UNSD EXPERT GROUP MEETING ON INTERNATIONAL STATISTICAL CLASSIFICATIONS May 2015, New York.
Cost Segregation Implementation. Implementation n Final Phase of Selling Process n Engagement Letter -Client signs EL included with property analysis.
Management of Change ► The health, safety, security, environmental, technical and other impacts of temporary and permanent changes are formally assessed,
A SHFORK -B AINBRIDGE S TEEL D AM S TRUCTURAL E VALUATION P ROJECT DWP Engineering Diwei Chen Wen Cui Paul Garrett.
© 2010 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. In most cases, the information.
NETWORK SOLUTIONS, INC..  Who We Are  Why You Need Us  How We Work With You  Next Steps 2.
Wind, Wind Power and Vestas Implementation of Wind Power.
Creating and Managing Content Types Module 9. Overview  Understanding Content Types  Creating and Using Site Columns  Creating and Using Site Content.
HSC PDHPE: Assessment Task Improving Performance & Factors Affecting Performance Improving Performance & Factors Affecting Performance Name: ____________________.
How to Plan for the Implementation of the Toolkit CEI Implementing the Reproductive Health Assessment Toolkit for Conflict-Affected Women November.
Progress presentation
Implementing an Adaptive Capital Improvement Program
Flood Inundation Mapping Program
Air Quality Governance in the ENPI East Countries EMISSION INVENTORY September 2012 Chisinau, MOLDOVA.
May 11-13, 2005CIWMB/LEA Conference1 Closure & Postclosure Maintenance Plans What You Need To Know or Secrets Revealed.
Urban Resilience & Technical Security Systems Anticipate, React, Recover and Learn.
Shared Community Health Needs Assessment (CHNA) Data Summary Washington County Report Fall 2015/Spring 2016 [name] [date]
Kyrgyzstan & UNFCCC. Adaptation to Climate Change: Strategies & Priorities Zukhra Abaikhanova, Center for Climate Change Workshop The 2 nd Meeting of Working.
Linear Mechanical Systems Sizing & Estimating Life of a Positioning System.
Shared Community Health Needs Assessment (CHNA) Data Summary Aroostook County Report Fall 2015/Spring 2016 [name] [date]
Shared Community Health Needs Assessment (CHNA) Data Summary Cumberland County Report Fall 2015/Spring 2016 [name] [date]
Engineering Documentation
The FMCSA Program Effectiveness Study How Effective Are Compliance Reviews?
 What is EWP & How Does the Program Work? Emergency Watershed Protection Program.
Shared Community Health Needs Assessment (CHNA) Data Summary York County Report Fall 2015/Spring 2016 [name] [date]
Multiple Season Study Design. 2 Recap All of the issues discussed with respect to single season designs are still pertinent.  why, what and how  how.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
English for Engineering Management ( 1 ) Detail 1-1 Fill out the missing words on the drawing (5 are missing) Where is the detail located on the building?
Job Hazard Analysis (JHA) Training for Safety and Health Staff
Software Engineering Lecture #2
Implementing and Understanding Tax Increment Financing (TIF) Districts Prepared for the Village of Alsip May, 2017.
Planning for next Year Technical and Adaptive Challenges May 2014
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Instrument PDR Summary of Objectives
Margin Management Configuration Management Benchmarking Group
Unit 3 Review (Calculator)
Overview Review of Course Details Course goal Course lessons.
KICK-OFF Overview and thematic approach 19th of June 2017
Permanency #1--Permanency and Stability in Living Situation
Calculate 9 x 81 = x 3 3 x 3 x 3 x 3 3 x 3 x 3 x 3 x 3 x 3 x =
CICA Project of the Year Entry Template
Evaluation from a Corridor perspective: methods and results Merja Penttinen, VTT
LEARNING & DEVELOPMENT STRATEGY: PROCESS OVERVIEW
Presentation transcript:

1  Services Overview  Implementation plan (capacity overview)  Summary of completed project Site Design Services

2 Services overview  A quality site is designed based upon an excellent technical study, our engineers know that they must anticipate any unknown factor, avoid any trap and adapt to every situation. Our site design services include :  Site survey included topographic survey, tower analysis  Structural analysis and stability studies  Detailed design drawings, calculation and documentation  Estimating, costing, and planning  Health and safety assessment Site Design Services

3 Capacity  Our capacity is 30 sites per month and may 1.5 time our sources to reach upto maximum 45 sites a month. Site Design Services

4 Summary of Completed projects. Site Design Services  Mobily Motorola ACES5 sites Mobily ACES 54 sites Mobily CSC –microcell/RF24 sites Mobily BTC19 sites  STC Cell enhancer50 Sites  ITC wi-max CSC 50 Sites AMAT (OWN)5 Sites