1 Joint Hurricane Testbed (JHT) 2010 Update Transition from Research to Operations Jiann-Gwo Jiing Chief, Technical Support Branch, NHC JHT Director 64th.

Slides:



Advertisements
Similar presentations
Comparison of the 2008, 2010, & 2012 Snapshots of Tropical Cyclone R&D Dr. Frank Marks (NOAA) and Dr. Ron Ferek (Navy) Co-Chairs, Working Group for Tropical.
Advertisements

Joint Typhoon Warning Center Forward, Ready, Responsive Decision Superiority UNCLASSIFIED An Overview of Joint Typhoon Warning Center Tropical Cyclone.
1 NCEP Operational Regional Hurricane Modeling Strategy for 2014 and beyond Environmental Modeling Center, NCEP/NOAA/NWS, NCWCP, College Park, MD National.
Integrated Ocean Observing System (IOOS) Data Management and Communication (DMAC) Standards Process Julie Bosch NOAA National Coastal Data Development.
The Joint Hurricane Testbed The Joint Hurricane Testbed is funded by the US Weather Research Program in NOAA/OAR's Office of Weather and Air Quality Chris.
February High Impact Weather Workshop 1 JCSDA-HFIP and -ECMWF Workshop Recommendations Lars Peter Riishojgaard and Sid Boukabara Joint Center for.
1 Joint Hurricane Test Bed (JHT) 2005 IHC Update USWRP Dr. Jiann-Gwo Jiing JHT Director Technical Support Branch Chief, TPC/NHC 9 March 2005.
Demonstration Testbed for the Evaluation of Experimental Models for Tropical Cyclone Forecasting in Support of the NOAA Hurricane Forecast Improvement.
0 Future NWS Activities in Support of Renewable Energy* Dr. David Green NOAA, NWS Office of Climate, Water & Weather Services AMS Summer Community Meeting.
1 WRF Development Test Center A NOAA Perspective WRF ExOB Meeting U.S. Naval Observatory, Washington, D.C. 28 April 2006 Fred Toepfer NOAA Environmental.
Welcome MACOORA Annual Meeting October 22-23, 2008 Fall River, Massachusetts Carolyn Thoroughgood.
1 NOAA’s Environmental Modeling Plan Stephen Lord Ants Leetmaa November 2004.
Advanced Hurricane Prediction A plan for research and development Naomi Surgi February, 2005.
National Weather Service National Weather Service Central Computer System Backup System Brig. Gen. David L. Johnson, USAF (Ret.) National Oceanic and Atmospheric.
A LONG-RANGE PERSPECTIVE ON THE POTENTIAL ROLES OF MODEL TESTBEDS IN IOOS CHRIS MOOERS DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING PORTLAND STATE.
Model testing, community code support, and transfer between research and operations: The Tropical Cyclone Modeling Testbed (TCMT) and the Developmental.
Using Partnerships to Meet NOAA’s Needs for its Next Generation Storm Surge System NOS/OCS/CSDL J. Feyen F. Aikman M. Erickson NWS/NCEP/EMC H. Tolman NWS/OST/MDL.
1 Addressing Critical Skills Shortages at the NWS Environmental Modeling Center S. Lord and EMC Staff OFCM Workshop 23 April 2009.
Development of a Real-Time Automated Tropical Cyclone Surface Wind Analysis: Development of a Real-Time Automated Tropical Cyclone Surface Wind Analysis:
Update on Storm Surge at NCEP Dr. Rick Knabb, Director, National Hurricane Center and representing numerous partners 21 January 2014.
1 Requirements for hurricane track and intensity guidance Presented By: Vijay Tallapragada and Sam Trahan (NWS/NCEP) Contributors: HWRF Team at EMC, NHC.
The Nation’s Hurricane Program: An Interagency Success Story March 5 - 9, st Interdepartmental Hurricane Conference.
Office of the Federal Coordinator for Meteorology OFCM 66th Interdepartmental Hurricane Conference March 5 – 8, 2012 Charleston, SC.
NCEP Vision: First Choice – First Alert – Preferred Partner 1 Hydrometeorological Prediction Center (  Vision, mission, & roles.
Joint Hurricane Testbed An Update of the Joint Hurricane Testbed is funded by the US Weather Research Program in NOAA/OAR's Office of Weather and Air Quality.
Monsoon Desk at NCEP NOAA/NWS/NCEP/EMC National Monsoon Mission Scoping Workshop April 11-15, 2011.
1 NUOPC National Unified Operational Prediction Capability 1 Review Committee for Operational Processing Centers National Unified Operational Prediction.
Hurricane Forecast Improvement Project (HFIP) Overview NOAA Hurricane Conference Ed Rappaport for Fred Toepfer and Bob Gall December 1, 2009.
Office of Coast Survey Using Partnerships to Improve NOAA’s Storm Surge Products and Forecasts Jesse C. Feyen Storm Surge Roadmap Portfolio Manager National.
Update on the Joint Hurricane Testbed Activities Update on the Joint Hurricane Testbed Activities Jiann-Gwo Jiing JHT Director NHC 7 March 2007 Shirley.
1 Joint Hurricane Testbed (JHT) 2010 Update Transition from Research to Operations Jiann-Gwo Jiing Chief, Technical Support Branch, NHC JHT Director Chris.
Center for Satellite Applications and Research (STAR) Review 09 – 11 March 2010 Image: MODIS Land Group, NASA GSFC March 2000 Improving Hurricane Intensity.
PARTNERING WITH THE NATIONAL SCIENCE FOUNDATION Michael C. Morgan Director, Division of Atmospheric and Geospace Sciences National Science Foundation.
Joint Hurricane Testbed (JHT) 2006 IHC Update USWRP Dr. Jiann-Gwo Jiing JHT Director TPC/NHC 22 March 2006.
3 rd Annual WRF Users Workshop Promote closer ties between research and operations Develop an advanced mesoscale forecast and assimilation system   Design.
Ligia Bernardet, S. Bao, C. Harrop, D. Stark, T. Brown, and L. Carson Technology Transfer in Tropical Cyclone Numerical Modeling – The Role of the DTC.
Insert Date 1 Hurricanes-Inundation Overview Objectives: Improve forecasts of tropical cyclones and related inundation hazards to enhance mitigation decisions.
NOAA and Hurricanes Meeting the Challenge Scott Kiser – NOAA’s NWS Tropical Cyclone Program Manager Scott Carter – NOAA Legislative Affairs.
1 11/25/2015 Developmental Testbed Center (DTC) Bob Gall June 2004.
1 Joint Hurricane Test Bed (JHT) Opportunities for Transfer of Research and Technology into Tropical Cyclone Analysis and Forecast Operations USWRP AMS.
1 Joint Hurricane Testbed (JHT) 2011 Update Transition from Research to Operations Jiann-Gwo Jiing JHT Director NHC Chris Landsea NHC Chris Landsea NHC.
Naval Oceanography Naval Oceanography: Enabling Decisions through Excellence in Tropical Cyclone Forecasting CAPT Michael Angove Commanding Officer, NMFC/JTWC.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force 1 Air Force Director of Weather 1 March 2010 USAF Tropical Cyclone.
1 Proposal for a Climate-Weather Hydromet Test Bed “Where America’s Climate and Weather Services Begin” Louis W. Uccellini Director, NCEP NAME Forecaster.
1 Joint Hurricane Testbed (JHT) 2009 Update Transition from Research to Operations Jiann-Gwo Jiing Chief, Technical Support Branch, NHC JHT Director Chris.
4th IPWG Workshop Chinese Meteorological Agency, Beijing, China, October, 2008 MAINSTREAMING THE OPERATIONAL USE OF SATELLITE PRECIPITATION DATA.
Tools for Coordinating Aircraft During Hurricane Field Campaigns: Real Time Mission Monitor and Waypoint Planning Tool Richard Blakeslee / NASA Marshall.
Tropical Cyclone Operations & Research Mary M. Glackin Deputy Under Secretary for Oceans & Atmosphere | NOAA 62 nd Interdepartmental Hurricane Conference.
NCEP Vision: First Choice – First Alert – Preferred Partner 1 HPC Hydrometeorological Testbed April 2009.
1Office of the Federal Coordinator for Meteorology OFCM OFCM Special Session: Uncertainty in Atmospheric Transport and Diffusion (ATD) Models Setting the.
National Centers for Environmental Prediction: “Where America’s Climate, Weather and Ocean Services Begin” An Overview.
Doppler Lidar Winds & Tropical Cyclones Frank D. Marks AOML/Hurricane Research Division 7 February 2007.
Symposium On WEATHER INFORMATION FOR SURFACE TRANSPORTATION “Preparing for the Future: Improved Weather Information for Decision-Makers” December 4 - 6,
64th Interdepartmental Hurricane Conference NOAA Tropical Program Delivering on the Promise of Partnerships Jack Hayes NOAA Assistant Administrator & Director,
NOAA’s response strategy to the Hurricane Intensity Research Working Group (HIRWG) and related recommendations Greg Mandt NOAA NWS Office of Science and.
DTC Overview Bill Kuo September 25, Outlines DTC Charter DTC Management Structure DTC Budget DTC AOP 2010 Processes Proposed new tasks for 2010.
1 NCEP’s Climate Forecast System as a National Model “Where America’s Climate, Weather and Ocean Services Begin” 32 nd Climate Diagnostics and Prediction.
Shuyi S. Chen Rosenstial School of Marine and Atmospheric Science University of Miami (DRAFT only!!! Improving Hurricane Structure and Intensity Forecast:
1 Where the Rubber Meets the Road: Testbed Experiences of the Hydrometeorological Prediction Center David Novak 1, Faye Barthold 2, Mike Bodner 1, and.
1 National Centers for Environmental Prediction: Where America’s Climate and Weather Services Begin Louis W. Uccellini Director, NCEP January 28, 2004.
NOAA Hurricane Forecast Improvement Project Development Fred Toepfer, HFIP Manager Bob Gall, HFIP Development Manager.
Fostering Collaboration Between Operational NWP and Academic Communities Isaac Ginis University of Rhode Island 61 st Interdepartmental Hurricane Conference,
Hurricane Joaquin Frank Marks AOML/Hurricane Research Division 10 May 2016 Frank Marks AOML/Hurricane Research Division 10 May 2016 Research to Improve.
“Tropical Cyclone Operations and Research: Priorities for the Future” March 3 - 7, nd Interdepartmental Hurricane Conference.
Ocean Prediction Center
NGGPS NGGPS Priorities: the three legs of the stool
NOAA Intensity Forecasting Experiment (IFEX)
National Monsoon Mission Scoping Workshop April 11-15, 2011
WRN Workshop NWS Funding Opportunities
Presentation transcript:

1 Joint Hurricane Testbed (JHT) 2010 Update Transition from Research to Operations Jiann-Gwo Jiing Chief, Technical Support Branch, NHC JHT Director 64th Interdepartmental Hurricane Conference Savannah, GA March 4, 2010 Chris Landsea NHC Shirley Murillo NOAA/HRD

2 Joint Hurricane Testbed Mission Statement The mission of the Joint Hurricane Test Bed is to transfer more rapidly and smoothly new technology, research results, and observational advances of the United States Weather Research (USWRP), its sponsoring agencies, the academic community and other groups into improved tropical cyclone analysis and prediction at operational centers.

3 bridging the gap

JHT Process Principal Investigators apply for funding through NOAA Principal Investigators apply for funding through NOAA A seven member Steering Committee rates all proposals A seven member Steering Committee rates all proposals Funded projects are tested during one or two hurricane seasons in conjunction with NHC/ Environmental Modeling Center points of contact Funded projects are tested during one or two hurricane seasons in conjunction with NHC/ Environmental Modeling Center points of contact At the project’s end, each is evaluated by NHC/EMC staff At the project’s end, each is evaluated by NHC/EMC staff Implementation of successful projects are then carried out by NHC/EMC/NCO staff/PIs Implementation of successful projects are then carried out by NHC/EMC/NCO staff/PIs 4

5 Summary of JHT projects ) Number of projects supported: 62 – – 50 completed, 32.5 accepted for operational implementation – – Number of projects rejected: 5 – – Number of projects completed but pending further investigation (decisions deferred): 2.5 – – Number of projects in process: 22 2) Implementation – – Number of projects implemented: 30.5 Number of numerical modeling related projects implemented by EMC/NCO: 9 Number of projects implemented by NHC: 21.5 – – Number of projects accepted but not yet fully implemented by NHC: 2 Note: 1) Implementation is defined when a project is completed, accepted, and the technique installed on NCEP/NCO or NHC operational systems and runs on operational time frame. Some techniques were “implemented” on JHT platform for testing. 1) Number of projects supported: 62 – – 50 completed, 32.5 accepted for operational implementation – – Number of projects rejected: 5 – – Number of projects completed but pending further investigation (decisions deferred): 2.5 – – Number of projects in process: 22 2) Implementation – – Number of projects implemented: 30.5 Number of numerical modeling related projects implemented by EMC/NCO: 9 Number of projects implemented by NHC: 21.5 – – Number of projects accepted but not yet fully implemented by NHC: 2 Note: 1) Implementation is defined when a project is completed, accepted, and the technique installed on NCEP/NCO or NHC operational systems and runs on operational time frame. Some techniques were “implemented” on JHT platform for testing.

Changes: Funding Distribution 1.15M Fifth Round ( ) $1.15M Second Round ( ) 1.35M $1.35M

Changes: Forecaster Priorities Second Round (03-05) 1. Intensity change, rapid intensification 2. “Guidance on guidance” for track, intensity and precipitation – probabilistic 3. Precipitation amount and distribution 4. Reduce the occurrence of guidance and official track outliers 5. Implement improved observational systems in the storm and its environment Fifth Round (09-11) 1. intensity change, rapid intensification 2. Improved observational systems in the storm and its environment 3. Guidance on guidance for track, intensity and precipitation 4. Enhancements to the operational environment to increase forecaster efficiency 5. Additional operational guidance on coastal inundation (e.g., storm surge and waves) 7

Changes: Modeling Priorities (Provided by EMC) Second Round (03-05) 1. Improved model development to advance track and intensity forecasts 2. Improved boundary layer representation for coupled air/sea/land models-hurricane rainfall and inland flooding problem 3. Improved targeting strategies 4. Transforming results from field programs, e.g., CBLAST, into tangible results for NWP models. 5. Diagnostic studies of storm scale structure changes from high resolution models Fifth Round (09-11) 1. General model improvements to advance track and intensity forecasts 2. Improved parameterizations of microphysics, radiation and oceanic-atmosphere boundary layer for coupled atmosphere/ ocean/wave hurricane model 3. Model validation techniques suitable for three dimensional high resolution verification 4. Diagnostic techniques to further increase the utility of global models (e.g., NCEP, UKMO, NOGAPS) in forecasting tropical cyclone genesis 8

Present Major Activities : Test and Complete the 4 th Round (07-09) Projects Test and Complete the 4 th Round (07-09) Projects – – Second year for nine 4 th round projects – August July 2009 – – Testing of 4 th round projects Collaboration with PI Programming Establishing data flow Generating output for forecaster use/evaluation – – Final Reports from Principal Investigators – August 2009-February 2010 Feedback from NHC and EMC points of contact Test and Complete the 4 th Round (07-09) Projects Test and Complete the 4 th Round (07-09) Projects – – Second year for nine 4 th round projects – August July 2009 – – Testing of 4 th round projects Collaboration with PI Programming Establishing data flow Generating output for forecaster use/evaluation – – Final Reports from Principal Investigators – August 2009-February 2010 Feedback from NHC and EMC points of contact

10 Highlights of 4th Round Completed Projects Visualization Tool & SFMR – Carswell/Uhlhorn TC Dressing – Hansen Sea Spray Parameterization – Bao/Fairall Coupled TC-Wave-Ocean - Ginis Ocean Atmosphere Sea Spray by P. Black Ocean surface whitecaps and foam streaks in a hurricane at wind speeds of ~46 m/s

11 Highlights of 4th Round Completed Projects Drag Coefficient in Shallow Water - Powell Ocean Model Parameterizations - Shay Improved Wind Probabilities – DeMaria/Knaff Enhanced ATCF - Sampson

12 Highlights of 4th Round Completed Projects HWRF Transition - Tuleya Waves from Aircraft - Walsh

2009-Present Major Activities : Factors in Final Evaluation Forecast or Analysis Benefit: expected improvement in operational forecast and/or analysis accuracy Forecast or Analysis Benefit: expected improvement in operational forecast and/or analysis accuracy Efficiency: adherence to forecaster time constraints and ease of use needs Efficiency: adherence to forecaster time constraints and ease of use needs Compatibility: IT compatibility with operational hardware, software, data, communications, etc. Compatibility: IT compatibility with operational hardware, software, data, communications, etc. Sustainability: availability of resources to operate, upgrade, and/or provide support Sustainability: availability of resources to operate, upgrade, and/or provide support 13 Cont.

Present Major Activities : Fund and Test 5 th Round (09-11) Projects – – Send recommendations on top ranked proposals to USWRP – – Provide details on funded projects to NHC/EMC staff – – Identify POC (NHC/EMC) – – Work with PIs and POCs to define timelines – – Facilitate testing during the 2009 hurricane season Start preparing for the 6 th Round of Funding Fund and Test 5 th Round (09-11) Projects – – Send recommendations on top ranked proposals to USWRP – – Provide details on funded projects to NHC/EMC staff – – Identify POC (NHC/EMC) – – Work with PIs and POCs to define timelines – – Facilitate testing during the 2009 hurricane season Start preparing for the 6 th Round of Funding Cont.

15 Primary Area of Focus # of Projects Improvements to dynamical models (for track, intensity, and precipitation forecasts) 5 Statistical intensity forecast guidance 3 Enhancements to observed data, assimilation 1 Tropical cyclone structure/wind/wave distribution 2 Enhancements to operational environment 1 Total12 Current (5th Round) Project Focus Areas

16 Challenges for 2010 Implement newly accepted projects (NHC) – – JHT final review/reports to NHC Director – Director – NHC Director makes implementation decision – implement – Staff at NHC works to implement accepted projects Test and evaluation (with NHC & EMC) – – Prepare real-time testing & evaluation for 5 th round projects – – Set up necessary software code and data flow Implement newly accepted projects (NHC) – – JHT final review/reports to NHC Director – Director – NHC Director makes implementation decision – implement – Staff at NHC works to implement accepted projects Test and evaluation (with NHC & EMC) – – Prepare real-time testing & evaluation for 5 th round projects – – Set up necessary software code and data flow

17 Challenges for 2010 – cont. Preparation for 6 th round projects – – Draft Federal Funding Opportunity (FFO) (April 2010) Centers (NHC/JTWC/EMC) priorities Evaluation criteria – – FFO published (July) – Pre-applications – SC Review of Pre-applications (September) – – PIs submitting full proposals (November) – – SC Review of full proposals (January 2011) – – Projects selected for funding (March 2011) – – Projects begin (August 2011) Preparation for 6 th round projects – – Draft Federal Funding Opportunity (FFO) (April 2010) Centers (NHC/JTWC/EMC) priorities Evaluation criteria – – FFO published (July) – Pre-applications – SC Review of Pre-applications (September) – – PIs submitting full proposals (November) – – SC Review of full proposals (January 2011) – – Projects selected for funding (March 2011) – – Projects begin (August 2011)

18 AcknowledgementsAcknowledgements JHT Steering Committee NHC and EMC forecaster and points of contact NHC adm & Technical Support Branch staff JHT principal investigators and other funded participants John Gaynor/Roger Pierce (USWRP) OFCM JHT Steering Committee NHC and EMC forecaster and points of contact NHC adm & Technical Support Branch staff JHT principal investigators and other funded participants John Gaynor/Roger Pierce (USWRP) OFCM

19 JHT JHT Website

20 Thank you

21 Supplemental Slides

22 Logistics Dedicated physical space in operations, offices Dedicated physical space in operations, officesPersonnel NHC dedicating about 1.5 FTE spread across ~12 people NHC dedicating about 1.5 FTE spread across ~12 people – 0.5 FTE reimbursed by USWRP for quarter-time JHT Director and one quarter-time JHT administrative assistant – NHC contributing 1.0 FTE, including NHC member on JHT Steering Committee, forecasters, and technical support staff Forecaster and technical points of contact (POC) Forecaster and technical points of contact (POC) Programming, system administration, and network support Programming, system administration, and network support Administrative support Administrative support Computing Resources Network connectivity Network connectivity Operational data flow Operational data flowLogistics Dedicated physical space in operations, offices Dedicated physical space in operations, officesPersonnel NHC dedicating about 1.5 FTE spread across ~12 people NHC dedicating about 1.5 FTE spread across ~12 people – 0.5 FTE reimbursed by USWRP for quarter-time JHT Director and one quarter-time JHT administrative assistant – NHC contributing 1.0 FTE, including NHC member on JHT Steering Committee, forecasters, and technical support staff Forecaster and technical points of contact (POC) Forecaster and technical points of contact (POC) Programming, system administration, and network support Programming, system administration, and network support Administrative support Administrative support Computing Resources Network connectivity Network connectivity Operational data flow Operational data flow NHC Contributions to JHT

23 JHT Infrastructure Personnel Quarter-time Director (NOAA FTE) Quarter-time Director (NOAA FTE) 7-member Steering Committee 7-member Steering Committee – Three from NOAA (one TPC), two from DOD, and two from the academic community – TPC member serves as co-Chair Two quarter-time administrative assistants (NOAA FTE) Two quarter-time administrative assistants (NOAA FTE) One IT Facilitator (meteorologist/programmer) One IT Facilitator (meteorologist/programmer) Computing Resources Server and workstations Server and workstations Software SoftwarePersonnel Quarter-time Director (NOAA FTE) Quarter-time Director (NOAA FTE) 7-member Steering Committee 7-member Steering Committee – Three from NOAA (one TPC), two from DOD, and two from the academic community – TPC member serves as co-Chair Two quarter-time administrative assistants (NOAA FTE) Two quarter-time administrative assistants (NOAA FTE) One IT Facilitator (meteorologist/programmer) One IT Facilitator (meteorologist/programmer) Computing Resources Server and workstations Server and workstations Software Software

24

25 Primary Area of Focus # of Projects Improvements to dynamical models (for track, intensity, and precipitation forecasts) 5 Statistical intensity forecast guidance 1 Enhancements to observed data, assimilation 0 Tropical cyclone structure/wind/wave distribution 2 Track forecast guidance 1 Enhancements to operational environment 1 Total present Major Activities 4th Round Project Focus Areas Cont.

26 4th Round (FY07-08) Recommended Funding Distribution Total $1.04M ($1.5M announced) Private Companies 24% NOAA 20% State and Private Universities 33% Navy (NPS, NRL) 11% NASA 12% (0%) (16%) (36%) (9%) (39%)

27

28

29 B2: Model development/improvements B3: Physical processes in models on track, intensity and structure, and precipitation B6: Advanced, probabilistic guidance; optimal ensemble construction and configuration; C1: Observing strategies/capabilities C2: Observations to support model diagnostics and verification C3: New and/or improved observational technologies