Silicon Valley Berryessa Extension Contracts ContractStatus C222 Kato Grade SeparationIn Progress C115 Agua Caliente, Fria & Toroges CreeksIn Progress.

Slides:



Advertisements
Similar presentations
Piedmont Improvement Program NC Society of Engineers
Advertisements

A34 Corridor Strategy Strategic Route Improvements 25 th November 2004 working together with.
St. Croix River Crossing Project Public Information Meeting
D2 Roadway Discussion Sound Transit Board September 22, 2011.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
CALIFORNIA HIGH-SPEED RAIL: GETTING ON TRACK Silicon Valley Leadership Group Transportation Committee January 9, 2013.
Alternative Project Delivery Mechanisms The J. K. Spruce Experience Katherine Yates Assistant General Counsel.
Alternative Project Delivery
US 113 FROM NORTH OF GOODY HILL ROAD TO SOUTH OF MASSEY STIPULATED SUM, DESIGN-BUILD, COMPETITIVE SEALED PROPOSALS PROJECT INFORMATIONAL MEETING July 29,
Overview CMAA May 29, What is Metro Regional Rail >Manage more than 165 miles of R/W in L.A. County >Develop capital improvement projects and.
Overview ACEC July 16, What is Metro Regional Rail >Manage more than 165 miles of R/W in L.A. County >Develop capital improvement projects and.
Public Information Sessions November 30, 2010: City Center at Oyster Point December 1, 2010: HRT Norfolk.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
COUNCIL WORKSESSION DECEMBER 11, AGENDA a.PROJECT SUMMARY RECAP. a.SCOPE. b.BUDGET. b.FINANCING UPDATE. a..5% GENERAL SALES & USE TAX. b.1.5% LODGING,
Auxiliary Services CWU Board of Trustees February 4, 2010.
Passenger Rail Development Activities AASHTO Annual Meeting October 18, 2013 Serge Phillips, MnDOT Federal Relations Manager.
VRE Gainesville-Haymarket Extension Feasibility Study and Alternatives Analysis Public Workshop Wednesday, October 22 nd, :30 – 9:00 pm Battlefield.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
November 7, 2012 DUMBARTON RAIL CORRIDOR PROJECT.
CALIFORNIA HIGH-SPEED RAIL: GETTING ON TRACK Silicon Valley Leadership Group Transportation Committee January 9, 2013.
North Metro Rail Line FasTracks Citizens Advisory Committee September 18, 2013.
I n t e g r a t I n g C S S Practitioner Module 4 1 Module 4: CSS in Corridor and Sub-area Planning.
Seattle Station Area Planning Milestones & Events Transit-Oriented Development Program Information & Schedule Station Area Atlas Station Area Recommendations.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Gaviota Beach Road – Transportation Division County Project Summer Crossing – Pre 1997 Located west of Highway 101 Access to Gaviota Beach and Hollister.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
Introduction to RUP Spring Sharif Univ. of Tech.2 Outlines What is RUP? RUP Phases –Inception –Elaboration –Construction –Transition.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
County of Fairfax, Virginia Department of Transportation Richmond Highway Transit Center Feasibility Study Briefing with the Fairfax County Transportation.
HERSONISSOS MUNICIPALITY PROGRAMME RITMO (INTERREG III B. MEDOCC) Dr. John Frantzeskakis Transportation Engineer, Professor Emeritus National Technical.
Intercity Rail Background/ Statewide Freight and Passenger Rail Plan Update Met Council TAC Meeting November 5, 2008.
US 101 Corridor Plan Prepared by: Oregon Department of Transportation May 2013.
Current Design and Implementation Challenges of Road Projects on the Coastland Ron Rahaman Chief Roads and Bridges Officer Ministry of Public Works Works.
South/West Corridor Transit Improvements PRIMO & ENHANCED AMENITIES PLANNING PHASE September 9, 2014 Planning & Project Development Committee August 11,
Transportation Management Plan Overview. TMP Overview2 Is that the impression people have?
The purpose is to explore methods to improve the safety, capacity, and mobility of Falling Springs Boulevard, US 60, and adjoining roads.
Jefferson Parkway Public Highway Authority Bidder Information Conference December 14, 2010.
VERMONT COMMUNICATIONS (VCOMM) March 2, 2006.
Diversity Outreach Program Second Session Collaboration – The Key to Success September 24, 2014.
Option #1 - Award Current Contract Fastest route to begin and complete project and achieve seismic safety Award requires funding  Option #2 - Re-bid SAS.
City of Palm Coast EAR Public Input Process Update Prepared for the Palm Coast City Council By The FCRC Consensus Center November 24, 2009 Update Prepared.
Fifth Lecture Hour 9:30 – 10:20 am, September 9, 2001 Framework for a Software Management Process – Life Cycle Phases (Part II, Chapter 5 of Royce’ book)
1 AGENDA OPEN HOUSE 6:00 PM  Review materials  Ask questions  Provide feedback  Sign up for list  Fill out comment cards PRESENTATION 6:30 PM.
Silver Line Phase 1 – Status Report Status Overall Phase 1 Construction – 99% complete All Station at 98% complete except Wiehle – Reston East at 99% complete.
Line 22 BRT: Summary Santa Clara Valley Transportation Authority May 2003.
Presented By: Jeffrey T. Folden, P.E. Assistant Chief, Innovative Contracting Division.
June 9, 2009 VTA 2009 Annual Conference DRPT Annual Update 2009 VTA Conference Chip Badger Agency Director.
Conventional Construction Working Group Meeting Tom Lackowski L2 Conventional Facilities Mu2e Working Group.
Wherever Your Path May Lead …. RTS Takes You There!
Utah Research Benefits Value of Research Taskforce July 29, 2015 Cameron Kergaye Utah Department of Transportation.
Texas Department of Transportation Corpus Christi District U.S. 181 (Harbor Bridge) Environmental Documentation and Schematic Development Citizens’ Advisory.
Wherever Your Path May Lead …. RTS Takes You There!
South/West Corridor Transit Improvements ZARZAMORA AND MILITARY PRIMO BRT PROJECTS ENVIRONMENTAL AND PRELIMINARY DESIGN PHASE September 9, 2014 VIA Community.
STEERING COMMITTEE JANUARY 24, INTRODUCTIONS 2 WHO IS ON THE PROJECT TEAM?  Dakota County Regional Railroad Authority  Ramsey County Regional.
Virginia Street Bus RAPID Transit Extension City of Reno Council Meeting April 29, 2015.
Investing in Infrastructure: Moving Massachusetts Forward Harvard 2015.
DESTINATION 2030 Regional Local Personal Adopted May 24, 2001.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Potomac Yard Metrorail Station
A Presentation to: River to Sea TPO Board October 26, 2016.
Red Line Customer Capacity Update
Green Line Extension Project
A Presentation to: River to Sea TPO BPAC November 9, 2016.
Regional Roads Committee
River to Sea TPO - CAC/TCC
NATIONAL INTERAGENCY LOGISTICS WORKSHOP Forest Service Update 2008
25th Avenue Grade Separation
25th Avenue Grade Separation
Presentation transcript:

Silicon Valley Berryessa Extension Contracts ContractStatus C222 Kato Grade SeparationIn Progress C115 Agua Caliente, Fria & Toroges CreeksIn Progress C101 Mission/Warren/Truck RailIn Progress C700 Berryessa Extension (SVBX)LTSS In Progress (Line, Tracks, Stations, Systems) C720 SVBX Station Campuses Advertise Early 2014 Parking structures, roadways, bus bays 0

Corridor Establishment Activities Kato Road Grade Separation – Construction of DSM Wall 1

SVBX Progress Curve 2

On The Horizon - Systems Projects 3

Train Control Modernization Program Reasons to replace existing train control equipment : Obsolescence; age of equipment; lack of parts; hard to maintain Performance improvements: capacity, headway, run time, reliability Previous attempt at CBTC failed: AATC Criteria: Safety Capacity Reliability Maintainability No impact to Operations during transition 4

Train Control Modernization Program Difficult, time-consuming and expensive implementation Affects wayside, and likely old cars and new cars Overall Program: Duration: 6 to 10 years Cost Estimate: $ M Several technologies to be evaluated Initial Phase: Technology Evaluation and Selection Performance Cost Impact to Operations Expected Reliability 5

Next Steps WhatWhen Mobilize team to perform technology evaluation: Refine concepts Perform simulations Develop migration paths Prepare cost estimates Select a Technology September 2013 Develop RFP for Primary Implementation Consultant, Interview and Select Spring 2014 Develop, Advertise an Award a Design/Build Contract for a phased implementation of the selected technology. Summer

New Operations Control Center VTA Extension triggers the need for a New OCC Facility New OCC to be coordinated with potential TOD at/near the Station Order of Magnitude Cost: $60M Starting Environmental and Conceptual Engineering Completion: