February Monthly Status Review (MSR) Note: No presentation this month

Slides:



Advertisements
Similar presentations
Work Breakdown Structures
Advertisements

SIM Program Status FFY Q1, SIM Program FFY 14 Q1 Status SIM Program Overall Status and Description: Overall Status Key delays and issues in evaluation.
Global Congress Global Leadership Vision for Project Management.
December Monthly Status Review (MSR) SCaN Testbed David Irimies, Project Manager January 18,
Automated Software Testing: Test Execution and Review Amritha Muralidharan (axm16u)
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
Chapter 2 The Analyst As Project Manager In Managing Information Systems 2.3.
Defining activities – Activity list containing activity name, identifier, attributes, and brief description Sequencing activities – determining the dependencies.
Project What is a project A temporary endeavor undertaken to create a unique product, service or result.
Self-Service Business Intelligence for the Product Management Department (Concurrency Corporation)
Degree and Graduation Seminar Scope Management
Project Cost Management Estimation Budget Cost Control
Systems Analysis and Design 9th Edition
Introduction to the State-Level Mitigation 20/20 TM Software for Management of State-Level Hazard Mitigation Planning and Programming A software program.
Software Configuration Management
McGraw-Hill/Irwin ©2008 The McGraw-Hill Companies, All Rights Reserved SECTION 12.1 PROJECT MANAGEMENT.
Computer Engineering 203 R Smith Requirements Management 6/ Requirements IEEE Standard Glossary A condition or capability needed by a user to solve.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Scott Williams 1 GLAST Large Area Telescope: Instrument Operations Center Scott.
Software Development Problems Range of Intervention Theory Prevention, Treatment and Maintenance Planning, Development and Use Cost of Intervention.
CBIIT Quality Assurance Process Preston Wood NCI CBIIT Government Quality Representative (GQR) January 2014 RS.
Configuration Management
Development plan and quality plan for your Project
Optimizing IT Department Project Portfolio Management (Concurrency Corporation)
AMP – SAMS/MAMS/PIMS 1 GRC Project Manager: MSI/Kevin McPherson Chief Engineer: Alan Linne Safety Mission Assurance Lead: Bipin Patel NASA Customer: SOMD/Brad.
McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, All Rights Reserved Business Plug-In B15 Project Management.
 Contoso is working on Wireless 1xEvDo application to handle high speed 3G application data transfer (voice, video data) in mobile phones while working.
Project Management Process Overview
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc. All rights reserved. BUSINESS DRIVEN TECHNOLOGY Business Plug-In B10 Project Management.
Software Configuration Management
BUSINESS PLUG-IN B15 Project Management.
December Monthly Status Review (MSR) SCaN Testbed David Irimies, Project Manager February 5,
GBA IT Project Management Final Project - Establishment of a Project Management Management Office 10 July, 2003.
March Code MS Monthly Status Review (MSR) SCaN Testbed David Irimies, Project Manager April 18,
ERCOT and Utilicast Public Document February 17, 2009 Nodal Program Oversight Report 9 System Integration Assessment.
SacProNet An Overview of Project Management Techniques.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Executive Summary Target Deployment – January 4, 2005 Actual Deployment – December 22, 2004.
Market Implementation Board Presentation July – v1.1F 1 Texas Nodal Market Implementation ERCOT Board of Directors Meeting Program.
Objectives: Develop a solution to either enhance or replace the FasTrak tool Scope/Why is this important?: Increase the transparency for issues that are.
Develop Project Charter
February 5, 2009 Technical Advisory Committee Meeting Texas Nodal Program Implementation: Program Update Trip Doggett.
SOFTWARE PROJECT MANAGEMENT
Working Draft 1 Integrated Baseline Review Sample Out-Brief Project Name.
November Monthly Status Review (MSR) SCaN Testbed David Irimies, Project Manager November 29,
BSBPMG501A Manage Application of Project Integrative Processes Manage Project Integrative Processes Unit Guide Diploma of Project Management Qualification.
Project Management Project Integration Management Minder Chen, Ph.D. CSU Channel Islands
Lead from the front Texas Nodal 1 Texas Nodal Market Implementation ERCOT Board Of Directors – August 15, 2006 TPTF Meeting August.
Project Management Processes for a Project
SCOPE DEFINITION,VERIFICATION AND CONTROL Ashima Wadhwa.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
Finance Roy Preece STFC RAL Oversight Committee Meeting 27 th November 2015.
1 GRC SPACE OPERATIONS PROJECT OFFICE Space Communications Office SCaN Testbed Project Monthly Status Review D. Malarik, Project Manager D. Irimies, Deputy.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
Governor’s Office of Emergency Services 1 The Governor’s Office of Emergency Services Application and Benefit Cost Analysis (BCA) Training.
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
Supplier Management Can’t live with them, Can’t live without them!
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
Principal Investigator ESTCP Selection Meeting
CS 577b: Software Engineering II
Principal Investigator ESTCP Selection Meeting
Project Initiatives Identified by the CIA Project
Change Assurance Dashboard
[Project Name] Project Report
Lockheed Martin Canada’s SMB Mentoring Program
[Project Name] Project Report
Principal Investigator ESTCP Selection Meeting
SOFTWARE PROJECT MANAGEMENT KEY TOPICS
Principal Investigator ESTCP Selection Meeting
MVD System Modernization Certification Change Request
Presentation transcript:

February Monthly Status Review (MSR) Note: No presentation this month SCaN Testbed David Irimies, Project Manager March 14, 2013

Issues and Concerns Top Project Risk #1 Key Issue/Concern Potential / Realized Impact Action Plan Resolution Date Out-Year Funding Profile Insufficient to Execute Project Given an out-years (FY14+) resource shortage, there is a possibility that: STB Expt integration and operations will idle/intermittently stop – with average of 1-2 weeks per month of on-orbit ops capability, with remainder of month for ground verifications, mission planning, etc. -will further hamper mitigation of Top Project Risk #2 (External Experimenter Support) STB Leadership to meet face-to-face with SCaN Program on working FY14 budget mark, discuss impacts, and request partial reprogramming of funds from supporting Center to GRC. Assemble FY14 budget and prioritized content/experiments, including overguide/deferred content, and present to Program, and respond to PPBE/PRG guidelines/marks. Request SCaN Program reserve / additional funding beyond existing mark; pursue external-to SCaN funds e.g. ISS Program Complete 2. Complete Continual 2

Issues and Concerns Top Project Risk #2 Key Issue/Concern Potential / Realized Impact Action Plan Resolution Date Funding Insufficient to Fully Support Experimenter Requests of STB Capabilities Given a resource shortage to fully support experimenter requests, there is a possibility that: STB unable to timely accommodate external Experimenters Increased development time and effort for all Experimenters Example: EDS delivery and RF HID – 1 year slips Include External Experimenter requests - approved by project - as part of PPBE package (Action Plan Item #2 in “Out-years funding…” risk) Continue to Prioritize new SW capabilities based upon experimenters in the queue, impact to Level 1 Requirements and STB Mission Success Criteria, and SCaN Program priorities Continue to adopt a “Level of Effort” approach for experiment integration and SW modifications 4. Continue to evolve and streamline experiment integration processes Complete Continual 4. Continual 3

Stoplight Status and Explanations CURRENT MONTH EXPLANATIONS Rev 3/14/13 Cost Schedule Technical Mgmt Current Month G R Y Prior Month CURRENT MONTH EXPLANATIONS Sched Issue / Impact Issue / Impact (ctd) Action Plan R Schedule slips due to Resource Shortages, and External Factors Completion of Commissioning (Comm’n) and Antenna Characterization has slipped to >2 months beyond baseline schedule (ref 10/16/12), due to: 1.) Resource and Workforce Shortages– activities complete faster if more resources and staffing of those resources (including Mission Ops, and experiments for SDR characterization). Also, intermittent pauses in on-orbit testing due to being one deep staff in most areas. 2.) Scope and Success Criteria of Checkout/Commissioning – bar too high 3.) TDRS Power Level Changes – during Rnd 1 of Antenna Characterization 4.) TDRS HIJ autotrack debugging (first unofficial experiment) – delayed APS Commissioning for 3 weeks 5.) Critical Commanding Issue - had shut down STB over 2 weeks 6.) ISS inhibits and SN/NEN scheduling continue to challenge planning – over 4 weeks Continue to request filling workforce/staffing gaps via STB Position Description document. Revise Comm’n Success Criteria Existing staff barely able to process procedures, verifications, etc. within single experiment (waterfall) – EX – pushed out completing procedure development and GIU dry runs of procedures from early/mid Dec to mid to end Jan. (2+ weeks b/c insuffic. BW in 7.0 WBS to develop/review procedures while in parallel executing Checkout) Idled the SCaN Testbed on orbit for >2 weeks, delayed completion of Checkout/Commissioning past baselined date of Dec. 31 Further delayed Commissioning for 2 weeks: Mission Ops staff can’t fully support Comm’n planning during console ops for Checkout Negatively impacting progress of experiments. 3a. Delayed completion of first 2 experiments (S-band and Ka-band technology) 3b. Delayed delivery of GRC in-house experiment currently in development (Expt 6 - Hi Rate BW-Effic. Ka-band WF) 3c. Descoped GRC in-house experiment in development (Expt 15 – Cognitive) 3d. Downstream: existing staff can’t fully process multiple experiments at the same time Seeking Code D/R CS lead roles Restore full-time support of existing comm. personnel Waveform SW & FW (Complex Elect) devel. Comm Data Analysis RF / Comm Sys. SME Experiment Principal Investigators Project Scientist liaisons for external experimenters 4

CMC Stoplight Variance Criteria Cost G Project is less than 5% variance from plan (+ or -) or under $500K; Y Project is greater than 5%, but less than 10% variance from plan (+ or -) and over $500K; R Project is greater than 10% variance from plan (+ or -), and over $1 Million. Schedule Project is less than 1 month variance from plan; Project is less than 2 months variance from plan; Project is greater than 2 months variance from plan. Technical G Major requirements are being met by the current design; Y Major requirements are not being met, but feasible options have been identified and accepted (directed and funded) that will meet all requirements; R Major requirements are not being met and options for corrective action are not yet shown to be feasible and/or are not yet directed and funded. Management Project implementation is not hampered by lack of resources, including budget, workforce, facilities, contracts, project management tools and documentation (requirements, plans, procedures, etc.); Project implementation is limited by the lack of one or more resources, but corrective action has been identified and approved; Project implementation is impacted by the lack of one or more resources, with corrective action not yet identified and/or approved. Costing actuals <1% over phasing plan *NEN-LGA – investigations ongoing *SFEP/EFEP – resolutions in testing See CMC Chart Corrective action identified, and partially implemented

Content for BPR submission The SCaN Testbed (STB) successfully completed first round of Software Defined Radio (SDR) Commissioning Narrative: SCaN Testbed completed its first round of Software Defined Radio (SDR) Commissioning. SDR Commissioning verifies the end-to-end data flow of the SCAN Testbed and ground systems; and, SDR Commissioning verifies that the radio link performance is predictable. Success is a high bar, with error free performance on the forward and return links. The STB team executed 42 events over 11 straight days, with 9 of 27 total tests fully complete and closed (many tests required 2 passed events per test, another high bar). The STB team performed extremely well, with excellent integration of White Sands Complex and STB personnel. The STB team is on track to better understanding the system issues and predicting the SDRs’ performance.