2007 CMBG Conference A Brief History of CM in the Nuclear Industry and the CMBG Presented By: Rick Harris CMBG Steering Committee June 17-20, 2007 Charleston,

Slides:



Advertisements
Similar presentations
Westinghouse Owners Group Risk-Informed Repair and Replacement – Implementation of 10 CFR Twelfth International Conference on Nuclear Engineering.
Advertisements

INPO Update CMBG Meeting June 2013
A Brief History of CM in the Nuclear Industry and the CMBG
Vermont Yankee Presentation to VSNAP 7/17/13 VY/Entergy Fukushima Response Update Bernard Buteau.
1. 2 ANSI/NIRMA Standard CM 1.0 The Rear View Mirror and What’s Ahead.
NRC Perspective of Recent Configuration Management Issues Tom Farnholtz Chief, Engineering Branch 1 Division of Reactor Safety, Region IV June 2014 CMBG.
1 CMBG 2009 Copyright 2009 Institute of Nuclear Power Operations Configuration Management Activities, Including Margin Management David Hembree INPO June.
US NRC Protective Action Recommendation Study National Radiological Emergency Preparedness Conference April 10, 2008 Las Vegas, NV Randy Sullivan, CHP.
Industry Nuclear Safety Culture* Process Thomas C. Houghton Director, Safety Focused Regulation Nuclear Energy Institute March 12, 2009 *Nuclear Safety.
Configuration Management Publications at IAEA
© 2014 Institute of Nuclear Power Operations Institute of Nuclear Power Operations Industry Shaping Event 1996 Millstone Loss of Configuration Management.
Configuration Management Benchmarking Group Conference June 6 – 9, 2004 Kansas City, MO © 2004 CMBG Deployment of a Margin Model at Comanche Peak Presented.
NEI Issues & Current Events George Oliver June 22, th Annual RETS – REMP Workshop South Bend, Indiana.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Regulatory Affairs Personnel Training and Qualification (RA T&Q) Overview.
1 CMBG 2009 PSEG Nuclear Vendor Technical Document Program Deficiencies, Successes, and Cost Savings Presented By: Paul Davis PSEG Nuclear, Engineering.
0 Configuration Management Fundamentals Presented By: John Parler CMBG Steering Committee.
Configuration Management Benchmarking Group Conference June 6 – 9, 2004 Kansas City, MO © 2004 CMBG Configuration Management Fundamentals including Margin.
1 CMBG History Presented By: John Parler CMBG Steering Committee.
2007 CMBG Conference David Hembree Institute of Nuclear Power Operations June 20, 2007 Charleston, SC INPO Perspective on Configuration Management.
10th Configuration Management Benchmarking Conference June 15-18, 2003 Hershey, PA 2003 CONFERENCE " A Decade of Sharing" NEI Business Update Presented.
ANSI/NIRMA Standard CM 1.0 Status Update
Margin Management. PAGE 2 Margin Management Plant Shutdowns 1.Late 1990’s – numerous “surprise” long-term plant shutdowns 2.Shutdowns resulted when a.
PAGE 1 New Plant - CM Configuration Management For The Next Generation Of Nuclear Facilities Joseph Burack Consulting Engineer Configuration Management.
10th Configuration Management Benchmarking Conference June 15-18, 2003 Hershey, PA 2003 CONFERENCE " A Decade of Sharing" CMBG History Presented By: Mike.
Configuration Management of Post-Fukushima Regulations CMBG June 2013 David Gambrell Director, Severe Accident Management Southern Nuclear.
1 Configuration Management Publications at IAEA Presented By: Kent Freeland WorleyParsons.
Configuration Management Benchmarking Group Conference June 6 – 9, 2004 Kansas City, MO © 2004 CMBG CMBG History Presented By: Mike Stout CMBG Steering.
Configuration Management Fundamentals including Margin Management Bill Kline FirstEnergy Nuclear Operating Company (FENOC) June 2, 2008 Shell Beach, CA.
A Brief History of CM in the Nuclear Industry and the CMBG Presented By: John Parler CMBG Steering Committee June 25, 2012 Chicago, Illinois.
2006 CMBG Conference Keith A. Reinsmith PPL Susquehanna 2006 CMBG Conference June 11-14, 2006 Richmond, VA Configuration Management Awareness Training.
2006 CMBG Conference CMBG History Presented By: Rick Harris CMBG Steering Committee.
RIC 2009 Construction Inspection Program: Industry Perspectives Russ Bell Director, New Plant Licensing March 11, 2009.
2007 CMBG Conference Sam Melton Progress Energy June 19, 2007 Charleston, SC Configuration Management Principles And Practices for New Nuclear Plants.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Probabilistic Risk Assessment Program Workshop Information.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Overview of Risk Informed Inspection Workshop Information IAEA Workshop City,
Evaluating Configuration Management
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Proposed Fire Risk Meter Workshop Information IAEA Workshop.
CMBG Conference 2013 Atlanta GA June 3, 2013 ANSI/NIRMA Standard CM Year History.
NUPIC Perspective Stan Mitchell – NUPIC Chair. Presentation Title2 NUPIC Overview NUPIC Organization established to accomplish the following objectives.
ANSI/NIRMA Standard CM 1.0 Status Update CMBG Conference 2016 West Palm Beach Gardens FL June 6, 2016.
Fukushima Flooding Task Force Jim Riley April 5, 2012.
Standard Design Process Overview
Use and Conduct of Safety Analysis IAEA Training Course on Safety Assessment of NPPs to Assist Decission Making Workshop Information IAEA Workshop Lecturer.
Design Oversight Working Group (DOWG) – Next Steps
Instructor: Lloyd Hancock
CM-101 Configuration Management Fundamentals
“Status of the ReACTOR Decommissioning Program” October 7, 2016 LLW Forum Ted Smith, Project Manager Reactor Decommissioning Branch Division of Decommissioning,
DNP Initiative ENG-003 Standard Design Process Overview Configuration Management Benchmarking Group June 12, 2017.
CMBG History Configuration Management Benchmarking Group ( Rick Harris CMBG Steering Committee Chairman 7th Annual CMBG Conference Hosted.
A Brief History of CM in the Nuclear Industry
Presented By: John Gierlach, Senior Advisor Ontario Power Generation
A Brief History of CM in the Nuclear Industry and the CMBG
Industry Guidance on Part 21 Evaluation and Reporting
Configuration Management Benchmarking Group (www. cmbg
Presented By: Mike Stout – PPL Glenn Neises - INPO
NRC Cyber Security Regulatory Overview
Configuration Control and the Standard Nuclear Performance Model
How to Manage Guidance from Multiple Organizations into CM
BREAKOUT 4: Vendor Technical Information
Configuration Management Fundamentals including Margin Management
Configuration Management Fundamentals
A Brief History of CM in the Nuclear Industry and the CMBG
CMBG Steering Committee
TRTR Briefing September 2013
Configuration Management AP-929, Revision 1 Mike Stout Chairman CMBG Steering Committee April 9, 2019 Cleveland 2005.
Workshop 1: Processing Facility Configuration Information
Vendor Technical Information
Design and Operating Margins Model
BREAKOUT 3: CM Health Reporting
Presentation transcript:

2007 CMBG Conference A Brief History of CM in the Nuclear Industry and the CMBG Presented By: Rick Harris CMBG Steering Committee June 17-20, 2007 Charleston, SC

2007 CMBG Conference A Brief History of CM in the Nuclear Industry Configuration Management in military and aerospace industry geared towards product conformance to facilitate interchangeability of parts while still satisfying the overall design requirements MIL-STD-973 (1992), ”Configuration Management” (later replaced by ANSI/EIA )

2007 CMBG Conference A Brief History of CM in the Nuclear Industry DOE STD “Configuration Management” Applicable to DOE nuclear facilities in the operational phase. DOE-STD-1073 was updated in 2003

2007 CMBG Conference A Brief History of CM in the Nuclear Industry Nuclear plants in mid 60’s to early 80’s typically designed by AEs under contract Final design documents typically turned over to the utility at the end of construction Little knowledge transfer of design info to utility engineering organization Utilities struggled to deal with long term design maintenance and related document upkeep

2007 CMBG Conference A Brief History of CM in the Nuclear Industry Early indicators that the nuclear plant design basis knowledge was becoming disconnected from the physical plant IE Bulletin uncovered calculation discrepancies undocumented modifications document discrepancies as-built problems

2007 CMBG Conference A Brief History of CM in the Nuclear Industry Salem ATWS event (1983) Generic implications identified in NUREG-1000 and NRC Generic Letter compliance with vendor recommendations part and procurement issues vendor manual controls Industry initiatives by INPO, NUMARC and EPRI to provide guidance and consistency

2007 CMBG Conference A Brief History of CM in the Nuclear Industry Davis Besse Loss of Feedwater event (1985) Led to NRC Safety System Functional Inspections (SSFIs) and NUREG-1154 difficulties maintaining operational readiness of safety systems lack of understanding design bases Voluntary design basis reconstitution, DBDs and self- evaluation NUREG-1397, NUMARC , INPO and NUREG/CR-5147

2007 CMBG Conference A Brief History of CM in the Nuclear Industry Browns Ferry (1985) Browns Ferry fire in Unit 1 (1975) led to changes in NRC standards for Fire Protection All three Browns Ferry units shut down voluntarily in March 1985 due to CM related problems - containment isolation testing (Unit 1), reactor water level instrumentation (Unit 2) Unit 1 restarted in May 2007

2007 CMBG Conference A Brief History of CM in the Nuclear Industry NRC specialized SSFIs for safety systems Electrical Systems (EDSFI) Service Water Systems (SWOPI) SECY : intent to issue generic letter to require utilities to address how they were dealing with the problems - withdrawn

2007 CMBG Conference A Brief History of CM in the Nuclear Industry Nuclear Information and Records Management Association (NIRMA) CM Committee developed solution control of technical information by engineering and operations personnel mature records management and document control process PP “Position Paper on Configuration Management Program”

2007 CMBG Conference A Brief History of CM in the Nuclear Industry First Nuclear CM benchmarking conference hosted by PPL in Fall US utilities represented Each utility made presentation about their CM program No motivational speeches No sales promotions by service providers

2007 CMBG Conference The CMBG Idea Grows Second conference hosted by Ontario Hydro in 1995 Drafted plans for continuing organization - approved in 1996 Adopted name: Configuration Management Benchmarking Group Formed Steering Committee Wrote Mission Statement “…forum for peer-level information sharing…” Defined ground rules for holding future conferences

2007 CMBG Conference CMBG is not affiliated with any other single organization No funding from any agency No membership fees Conference costs are paid by registration fees and supplemented by host utility Host utility pays for web site CMBG makes no position statements or endorsements

2007 CMBG Conference CMBG accomplishments Annual Conferences Participation in development of industry documents Web Site ( –CMBG history –Conferences (future conferences and proceedings from previous conferences) –Steering Committee –IAEA Activities –CM Links –Papers and publications –Contact Database

2007 CMBG Conference CMBG Conferences YearHostLocation 1994PP&LPoconos, PA 1995Ontario HydroOntario, Canada 1996Houston Light & PowerGalveston, TX 1997Commonwealth EdisonChicago, IL 1998NAESCOBoston, MA 1999Duke PowerCharlotte, NC 2000Consolidated EdisonTarrytown, NY 2001Progress EnergyRaleigh, NC 2002PSEG NuclearAtlantic City, NJ 2003PPL SusquehannaHershey, PA 2004Wolf Creek NuclearKansas City, KS 2005First EnergyCleveland, OH 2006DominionRichmond, VA 2007SCE&GCharleston, SC

2007 CMBG Conference A Brief History of CM in the Nuclear Industry NIRMA TG “ Configuration Management of Nuclear Facilities” Built on the NIRMA PP-02 document Presented elements and attributes that facilities needed to establish of a good CM program. Later became basis for ANSI/NIRMA CM Criteria Program management Design requirements Information Control Change control Assessment Training

2007 CMBG Conference A Brief History of CM in the Nuclear Industry Millstone Spent Fuel Pool Cooling (1996) NRC had lost confidence in utility’s ability to know and maintain its design basis and to implement design and licensing requirements 10CFR50.54(f) letter in October 1996 to all licensees that required a response on how design basis information was controlled and maintained. More far-reaching implications than letter that NRC was persuaded not to issue in 1993

2007 CMBG Conference A Brief History of CM in the Nuclear Industry Millstone Spent Fuel Pool Cooling (1996) 10CFR50.54(f) letter helped to solidify CMBG as a viable resource for the industry and demonstrated how the CMBG "network" could be used to find and distribute valuable CM information between utilities, including good practices and lessons learned

2007 CMBG Conference A Brief History of CM in the Nuclear Industry DC Cook Design issues (1997) Extended shutdown due to inability to respond to design basis event and other configuration issues Contributed to INPO decision to modify the evaluation performance objectives and criteria to include configuration management and to the formation of a new CM evaluation department.

2007 CMBG Conference A Brief History of CM in the Nuclear Industry INPO AP-929 (1998) “Configuration Control Process Description” Focused on changes to plant configuration

2007 CMBG Conference CMBG Contributions to Industry CM Guidance Documents ANS/NIRMA CM “ Configuration Management of Nuclear Facilities” Based on NIRMA TG-19 CMBG members participated in development, review and issuance. Drafts reviewed at CMBG conferences Criteria Program management Design requirements Information Control Change control Assessment Training

2007 CMBG Conference CMBG Contributions to Industry CM Guidance Documents IAEA TECDOC-1335 (2003) "Configuration Management in Nuclear Power Plants“ Contained elements of INPO AP-929 and ANSI/NIRMA CM-1.0 Criteria Program management Design requirements Information Control Change control Assessment Training

2007 CMBG Conference CMBG Contributions to Industry CM Guidance Documents 2002 CMBG Conference - initiative to reach agreement between INPO and NEI documents NEI CM Community of Practice (2002) CM Process and PI’s included in NEI Standard Nuclear Performance Model (2003)

2007 CMBG Conference A Brief History of CM in the Nuclear Industry INPO - Margin Management (2003) INPO reorganization emphasized, “Evaluating Configuration and Margin Management” Greater than design basis range Operating Point Limit Normal Operating Point Design or Tech Spec Basis Limit Functional/Design Failure Allowed operating range Analyzed transient range Operating margin Design margin ( Design allows operation in the transient range. However operating restrictions consistent with the design, such as the magnitude and frequency of excursions into this range apply) ( The allowed operating range provides the normal margins operators use without violating setpoints ) ( This is a prohibited range of operation and represents the additional conservative margin to account for uncertainties in design and construction )

2007 CMBG Conference A Brief History of CM in the Nuclear Industry INPO (November 2003) “Performance Objectives and Criteria” Configuration Management CM.1Maintaining Margins Consistent with Design Requirements CM.2Operational Configuration Control CM.3Design Change Processes CM.4Conduct of Engineering CM.5Reactor Engineering and Fuel Management

2007 CMBG Conference A Brief History of CM in the Nuclear Industry INPO (May 2005) “Performance Objectives and Criteria” Configuration Management CM.1Maintaining Margins Consistent with Design Requirements CM.2Operational Configuration Control CM.3Design Change Processes CM.4Reactor Engineering and Fuel Management

2007 CMBG Conference CMBG Contributions to Industry CM Guidance Documents INPO AP-929, Rev 1 (2005) “Configuration Management Process Description” “Three-Ball model became “CM Equilibrium Model” Return to CM Equilibrium (new) Margin Model (new)

2007 CMBG Conference CMBG Contributions to Industry CM Guidance Documents IAEA Draft Safety Report. “Application of Configuration Management in Nuclear Power Plants” (to be issued in 2007) Elements of AP-929 (Rev 1)

2007 CMBG Conference CMBG Contributions to Industry CM Guidance Documents ANSI/NIRMA Standard-CM-1.0, Rev 1 “Configuration Management of Nuclear Facilities” (to be issued in 2007) Input by several CMBG participants

2007 CMBG Conference CMBG Contributions to Industry What’s next?