Bioscience Research Laboratories University of Arizona + DPR Construction Date: 2015 – 12-14 Construction Work Starting Today for the BSRL Project !! Expansion.

Slides:



Advertisements
Similar presentations
Kingdom Hall Construction Burundi. Facts on Burundi No. of Congregations:51 Kingdom Halls Needed:35 Kingdom Halls completed since start of program:29.
Advertisements

Building for Learning Project Photo Progress Report October 2009 Project commencement 21 st September 2009.
Don Heard and J.J. arrive to excavate for the addition.
Forest Lake EDA Meeting June 27, CR 2 and I-35 Bridge/Interchange First Ave NW (Backage Road) CR 2/Broadway Avenue Roadway Utilities Hardwood Creek.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County June 25, 2013.
Herndon Station - North Pavilion Construction Town of Herndon – Town Council August 6, 2014.
Welcome Learn more about upcoming construction activities on Cedarvale Avenue and Oak Park Avenue View display boards and speak one-on-one with staff Building.
Route 50 Widening Design/Build Project. 2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties.
Wilson School Construction 2014 Tearing out the old courtyard to put in the new sewer line.
Alliant Energy Field Renovation. September 2005 Work area blocked off Pitching mound is flattened.
DUBAI STAR WORK PROGRESS DATE 23 JULY Material At Site.
1 BROOKHAVEN SCIENCE ASSOCIATES Central Chilled Water Facility – Phase II Alan Raphael MPO Project Manager CFAC Committee Review November 9, 2009 Sub-basement/Pipe.
A127 Ardleigh Green Bridge replacement - update EPAGRA Meeting 2 July 2015 Ardleigh Green Bridge replacement – update.
Your mother-in-law is moving in with your family. You need some more room, FAST. Time to finish that basement. In this task you need to decide how to insulate.
2011 Raze & Removal Pilot The WisDOT Northeast Region embarked on a new raze and removal process on a project in Sheboygan & Fond du Lac. It’s purpose.
CONSTRUCTION UPDATE The Gramercy Residences at Century City Century Properties - July 2009.
THE GRAMERCY RESIDENCES CONSTRUCTION UPDATES Century Properties May 2009.
Transportation Center Rolling Forward Into Phase 2 October, 2008.
Introduction to a pit installation
Building for Learning Project Photo Progress Report 3 October 2009 – November 2009 Project commencement 21 st September 2009.
Green Recycling Network Toward a Greener Tomorrow... Today!
Elevator Installation, Window Replacement, HVAC, Sprinklers, Block wall skimcoating (resident rooms & 1 st through 4 th floor resident corridors). New.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE: 01/20/14.
Eric Tweit Spring 2014 Mercer Corridor Project: West Phase Project update.
1. 2 Civil Engineering Practice Introduction Instructor: Dr. Attaullah Shah Lecture # 1 Department of Civil Engineering Swedish College of Engineering.
Winchester Medical Center Campus Expansion June 21, 2011.
BCM 210 Foundation Issues- Fall 2000 refer to Allen Text
Chapter 16 Site Preparation. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify tasks required.
Infrastructure that Supports the Construction Industry In order for the construction industry to function effectively there is a large amount of infrastructure.
F ACILITIES, P LANNING, AND C ONSTRUCTION December 14, 2015 – Monthly Construction Report.
Campus Plan Roosevelt Island campus > Laboratory of innovation > Open and inviting to the public > Sustainable and energy-efficient.
POOL CONSTRUCTION THE 5 MAJOR STEPS 1. Plan2. Dig3. Build4. Finish 5. Swim!
October 19, 2011 Construction Progress Report. Construction Progress Report – October 19, 2011 Contract sum to date:$ 162,736,722* Total completed to.
I-80 San Pablo Dam Road Interchange Project – Phase 1.
Second Street Closure for Construction of B21 1/16/16 – 1/31/16.
Delete this slide before you present! Follow these directions to add your own photo background into the presentation: Click the slide that you want to.
Green Labs Symposium | March 15, 2016 Travis Wanat, Senior project manager Department of Facilities Efficient building design and operation Fueling high.
I-225 Rail Line Chuck Culig, Project Manager Tuesday, April 2, 2013 RTD Board of Directors Update.
Best 20 jobs jobs sites.
Museum of Islamic Art Project Package # 3 Site Logistics and Progress Presentation.
A REPORT ON PRACTICAL TRAINING CONDUCTED AT PUBLIC WORK DEPARTMENT(PWD),KOTA FROM 15/6/2011 TO 14/7/2011 Submitted to: Mr. Rajneesh Sharma HOD {Civil Dep.}
Planning the Project Unit 1 – Lesson 12.
Click here for the LIVE WEBCAM
Facilities Services Department Meeting June 2016.
Click here for the LIVE WEBCAM
UW Medicine Lake Union Phase 2
Multiplication Facts.
Upcoming Activities Fun Fact Click here to view the live WEBCAM
NORTH TRUNK SEWER REPLACEMENT PROJECT
LSST PROJECT PHASE #2 BASE FACILITY AND DATA CENTER CONSTRUCTION
September 30th 2017 Click here for the LIVE WEBCAM
Prince Frederic Hall Tech One Lauren Kandt PSU AE Construction Sowers
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
Hopewell Valley Regional School District
Value of contract: Length of contract: Contract start date:
Concrete A structural material made by combining cement, sand, aggregate, and water.
Lincoln Common Redevelopment Construction Update.
Hornaday Weekend Conservation Project
416 UA College of Pharmacy Skaggs Building Addition and Renovation
Math Facts: 10s You will have 3 seconds to complete each problem.
Math Facts: 6s You will have 3 seconds to complete each problem.
The Anschutz Health Sciences Building Construction Update 8 April 2019.
Math Facts: 5s You will have 3 seconds to complete each problem.
Math Facts: 10s You will have 3 seconds to complete each problem.
Math Facts: 3s You will have 3 seconds to complete each problem.
Math Facts: 9s You will have 3 seconds to complete each problem.
Math Facts: 2s You will have 3 seconds to complete each problem.
Math Facts: 8s You will have 3 seconds to complete each problem.
Math Facts: 7-12 Subtraction
Phase 1 Statement of Work Preconstruction “Plan The Work”
Presentation transcript:

Bioscience Research Laboratories University of Arizona + DPR Construction Date: 2015 – Construction Work Starting Today for the BSRL Project !! Expansion of construction fencing. Removal of existing of asphalt and concrete, block walls and landscaping. Arrival of construction office trailers and hookup of utilities.

CURRENT ACTIVITIESFUN FACTS During this week, the construction fencing will expand to include the entire construction area for BSRL. During this week, demolition activities will create some noise near the Keating loading dock and the stair at the southwest corner of the Medical Research Building. During this week, landscape and hardscape demolition will begin. Existing boulders, rip-rap, and gravel is being salvaged and re-used for the new landscape design- this is a part of the University’s efforts to support sustainability. It takes 30’ deep concrete caissons to shore up the existing buildings so we can dig and build the BSRL basement. Bioscience Research Labs (BSRL) General Information: BSRL Construction Haul Routes UPCOMING ACTIVITIES Utilities for BSRL construction trailers will be installed during the week of the 21 st. Flaggers will guide traffic through the area during the move in.

Bioscience Research Laboratories University of Arizona + DPR Construction Weekly Progress Photos Southwest Gas is Complete! Southwest Gas has done a great job! They are complete and the site is ready for general construction What you will see when you get back from the closure The entire site will be fenced. 2. Construction trailers will be in place. 3. All on-site demolition will be complete. 4. Excavation will begin- 100 trucks a day are possible. 5. Two-way traffic on N. Cherry Ave. will be back in place.