US CMS DOE/NSF Review, 20 November 2003 - Trigger - W. Smith1 WBS 3.1 - Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status.

Slides:



Advertisements
Similar presentations
CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
Advertisements

Sector Processor – to – Muon Sorter tests M.Matveev Rice University January 8, 2004.
CSC Muon Trigger September 16, 2003 CMS Annual Review 1 Current Status of CSC Trigger Elements – Quick Summary Jay Hauser, with many slides from Darin.
P. Chumney, U. Wisconsin, CHEP, March 2003 CMS Regional Calorimeter Trigger - 1 Level-1 Regional Calorimeter System for CMS P. Chumney, S. Dasu, M. Jaworski,
US CMS DOE/NSF Review: June 2002, Darin Acosta, University of Florida1 Muon Track-Finder Trigger Darin Acosta University of Florida June, 2002.
CSC Trigger Report: Results from June 25 ns beam test Production plans Software Darin Acosta University of Florida.
The Track-Finding Processor for the Level-1 Trigger of the CMS Endcap Muon System D.Acosta, A.Madorsky, B.Scurlock, S.M.Wang University of Florida A.Atamanchuk,
Global Trigger H. Bergauer, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J. Strauss,
US CMS DOE/NSF Review, May Trigger C&S Parallel - W. Smith1 Trigger Cost, Schedule Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager.
Status of the CSC Track-Finder Darin Acosta University of Florida.
Wesley SmithAug. 18, 2010 Trigger Budget Review: Labor & M&S - 1 US CMS FY 2011 Budget Review Trigger Labor & M&S Wesley Smith Aug. 18, 2010 Outline Overview.
S. Dasu, University of Wisconsin September Regional Calorimeter Trigger Outline: Status of Prototypes Plans for Production Testing Plans for Integration,
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
Track-Finder Trigger at the Beam Test Results and Features Darin Acosta, Rick Cavanaugh, Victor Golovtsov, Lindsey Gray, Khristian Kotov, Alex Madorsky,
CSC EMU Muon Sorter (MS) Status Plans M.Matveev Rice University August 27, 2004.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
W. Smith, U. Wisconsin, US CMS Collaboration Meeting, May 10, 2002: TriDAS 1 US CMS TriDAS US CMS Meeting Wesley H. Smith, U. Wisconsin CMS Trigger Project.
W. Smith, US LHC Detector M&O Evaluation Group, January 18, 2006CMS Trigger - 1 US CMS Trigger DOE-NSF Review Wesley H. Smith, U. Wisconsin CMS Trigger.
Global Trigger H. Bergauer, Ch. Deldicque, J. Erö, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H.
Muon Port Card, Optical Link, Muon Sorter Upgrade Status M.Matveev Rice University December 17, 2009.
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF Mikhail Matveev Rice University 17 August 2012.
CSC EMU/Track Finder Clock and Control Board (CCB’2004) Status Plans M.Matveev Rice University August 27, 2004.
Annual Review Cern -June 13th, 2006 F. Loddo I.N.F.N. Bari RPC Electronics: Technical Trigger Flavio Loddo I.N.F.N. Bari On behalf of the RPC-Trigger group.
Upgrade of the CSC Endcap Muon Port Card Mikhail Matveev Rice University 1 November 2011.
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
CSC Endcap Muon Port Card and Muon Sorter Status Mikhail Matveev Rice University.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
W. Smith, August 2002 U. Wisconsin Task T - 1 Task T - CMS at LHC Personnel: Professors. D. Carlsmith, S. Dasu*, D. Reeder, W. Smith* Senior Scientist.
Tests of the Fully Loaded CSC Track Finder Backplane M.Matveev S.-J. Lee Rice University Alex Madorsky University of Florida 2 May 2005.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
March 2005, USCMS Trigger video meetingD. Acosta1 Revised Schedule for SP Pre-Production Continued testing of first two pre-production boards over next.
SP04 Production Lev Uvarov RICE Muon Trigger Meeting August 27, 2004.
W. Smith, LPC Meeting, February 17, 2006 CMS Trigger - 1 US CMS Trigger 2006 LPC Meeting Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager February.
US CMS DOE/NSF Review, May Cal. Trig. 4 Gbaud Copper Link Cards & Serial Link Test Card - U. Wisconsin Compact Mezzanine Cards for each Receiver.
P. Klabbers, U. Wisconsin, LECC September 2006 CMS Regional Calorimeter Trigger - 1 Integration of the CMS Regional Calorimeter Trigger into the Level-1.
W. Smith, U. Wisconsin, IEEE, November 1, 2006 CMS Regional Calorimeter Trigger - 1 The CMS Regional Calorimeter Trigger Electronics Integration W. H.
CMS Latency Review, 13th March 2007CSC Trigger 1 Latency and Synchronization update.
CSC Muon Sorter M. Matveev Rice University January 7, 2003.
US CMS DOE/NSF Review: June 2002, B.Paul Padley, Rice University1 CSC Muon Trigger On Detector Components B. Paul Padley Rice University June, 2002.
Tridas Week, November 2000Darin Acosta1 Status of the CSC Track-Finder D.Acosta, A.Madorsky, S.M.Wang University of Florida B.Cousins, J.Hauser, J.Mumford,
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, September 2004 Trigger Report - 1 CSC Trigger Muon Port Card & Sector Processor in production Mezzanine.
US CMS DOE/NSF Review: April 11-13, Trig. - Estimate to Complete.
W. Smith, U. Wisconsin, LHC Electronics Conference, October 1, 2003 CMS Calorimeter Regional Trigger - 1 Full Crate Test of the CMS Regional Calorimeter.
Electronics Review, May 2001Darin Acosta1 OPTICAL SP 1 Muon Sorter 3  / port card 3  / sector ME1 ME2-ME3 ME4 SR DT TF SP From CSC Port Cards MS MB1.
Upgrade of the CSC Endcap Muon Port Card with Spartan-6 FPGA Mikhail Matveev Rice University 30 April 2012.
US CMS DOE/NSF Review, May Trigger Plenary - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF.
M.Matveev Rice University March 20, 2002 EMU Muon Port Card Project.
W. Smith, US LHC Detector M&O Evaluation Group, January 28, 2005CMS Trigger - 1 US CMS Trigger DOE-NSF Review Wesley H. Smith, U. Wisconsin CMS Trigger.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
CMS Week, 3-7 November CSC Trigger Test Beam Report Cast of many.
Update on CSC Endcap Muon Port Card
CSC EMU Muon Port Card (MPC)
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF
Muon Track-Finder Trigger
CMS EMU TRIGGER ELECTRONICS
Regional Cal. Trigger Milestone: Major Production Complete
Current Status of CSC Trigger Elements – Quick Summary
CSC Muon Trigger - Annual Review
CSC Trigger Update Specific issues:
Darin Acosta University of Florida
September CSC Beam Test Report
Regional Cal. Trigger Milestone: Production & Testing Complete
CSC Trigger Muon Port Card & Sector Processor in production
New Calorimeter Trigger Receiver Card (U. Wisconsin)
Preliminary CSC Trigger Results from September Testbeam
Regional Cal. Trigger Milestone: Production Complete - U. Wisconsin
Sector Processor Status Report
CSC Muon Sorter Status Tests Plans M.Matveev August 21, 2003.
Plans for the 2004 CSC Beam Test
Presentation transcript:

US CMS DOE/NSF Review, 20 November Trigger - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status Review November 20, 2003 This talk is available on:

US CMS DOE/NSF Review, 20 November Trigger - W. Smith2 Pre-Production Clock & Control Card Fans out 160 MHz clock & adjusts phase to all boards Design validated - with small changes, layout and routing of production version completed. Manufacture Begun - All PCBs delivered by November 26 DC-DC Converters Clock delay adjust Wisconsin

US CMS DOE/NSF Review, 20 November Trigger - W. Smith3 Receiver Cards Top side with 1 of 8 mezzanine cards & 2 of 3 Adder ASICs DC-DC Adder mezz link cards BSCAN ASICs PHASE ASICs MLUs Bottom side with all Phase & Boundary Scan ASICs Pre-Production full feature RC and all ASICS fully validated. Full quantity of mezzanine link cards produced and under test at UW. RC production started, PCBs Nov. 21, 6 assembled for eval.: Dec.13 Wisconsin

US CMS DOE/NSF Review, 20 November Trigger - W. Smith4 Pre-Production Electron Isolation Card Full featured final prototype board is fully validated and production underway, first bare boards expected. 6 evaluation boards expected 5 Jan 04 Electron ID & Sort ASICs validated and production complete All PCBs expected by Nov. 26 Wisc.

US CMS DOE/NSF Review, 20 November Trigger - W. Smith5 Jet/Summary Card Full function prototype manufactured and under final tests Uses SORT ASICs to find top four e/ , threshold for muon bits, both to GCT Region energies to GCT Absorbs HF functionality with Rec. Mezz. Card, HF sent to GCT Full crate test - all output paths verified, electron sort, jet output all OK Integration test with GCT Done - Change in termination - Production to start shortly Receiver Mezz. Card Sort ASICs Cables To GCT (2 on Mezz. Card - Proto Assem.) Backplane: Two e/  per region. Region E T Sums BSCAN ASICs BSCAN ASICs Phase ASIC Wisconsin

US CMS DOE/NSF Review, 20 November Trigger - W. Smith6 Cal. Trig. 4 Gbaud Copper Link Cards & Serial Test Card Compact Mezzanine Cards for each Receiver Card accept 4 x 20 m 1.2-Gbaud copper pairs transmitting 2 cal. tower energies every 25 ns with low cost & power. Uses Vitesse Link Chips ( ). Serial Link Test Card Status: Already commissioned, cables, cards, 48V PS, and support software, delivered to CERN in March, operating in ECAL Electronics lab stably with no errors for months. Delivered to Princeton for HCAL tests in June and operating stably with no errors since. Two pairs in UW for testing receiver mezzanine cards, >900 cards of 1422 fully tested. Wisc.

US CMS DOE/NSF Review, 20 November Trigger - W. Smith7 First Full RCT Crate 18 Such Crates make up the full RCT System covering |  |<5 & 0 <  < 2 . Rear: Receiver CardsFront: Electron, Jet, Clock Cards Wisconsin

US CMS DOE/NSF Review, 20 November Trigger - W. Smith8 Calorimeter Trigger Status/Plans Pre-Production full function prototype tests CCC, EISO, RC, all ASICs Validated JSC nearly validated Production Underway All Receiver Mezzanine Cards in hand (1422) and >900 tested successfully All ASICs made Production Begun for RC, EIC, CCC, Backplane, Crate Activities Full production tests underway Software in use and more being readied Testing plan being refined Boards being made Integration and surface test beginning 2004 STC’s at CERN and Princeton Integrated JSC output with GCT last August Ship full crate to CERN for participation in HCAL surface test (2004) Calorimeter trigger project is on track.

US CMS DOE/NSF Review, 20 November Trigger - W. Smith9 Mezzanine card TLK2501 serializers Optomodules GTLP Receivers VME Interface (glue logic) Muon Port Card Rice 6 boards were fabricated and assembled in summer 2002 Tested MPC standalone (sorter logic) and with one and two Trigger Motherboards and full-size custom backplane

US CMS DOE/NSF Review, 20 November Trigger - W. Smith10 CSC Track-Finder Crate Sector Processor, receives optical data CCB with TTCRx MPC, for in-crate tests Second generation prototypes tested at beam test Florida

US CMS DOE/NSF Review, 20 November Trigger - W. Smith11 CSC Track-Finder (SP) Trigger Test 3 x 1.6 Gb/s optical link connections from CSC electronics Uses TLK2501 chipset from TI Requires very stable reference clock for error- free operation Errors during May tests without PLL Home-built VCXO & PLL clock patch added to clean incoming TTC clock for links, but TTC QPLL also tested Florida

US CMS DOE/NSF Review, 20 November Trigger - W. Smith12 Structured Beam Tests Correlated LCT Efficiency The efficiency to identify a correlated LCT (ALCT+CLCT) in one csc in a straight-line path from an LCT found in the other csc (within a  5 strip and  3 WG tolerance) is: 97.9% in one BX 98.9% in two BX (correct BX or one after) 99.1% in three BX (correct BX  1) as determined from logged Track-Finder data abs(wg3-wg8) abs(strip3-strip8)

US CMS DOE/NSF Review, 20 November Trigger - W. Smith13 VME/JTAGINTERFACE GTLPBACKPLANEINTERFACE MEZZANINECARD LVDSDRIVERS AND SCSI-3 CONNECTORS Muon Sorter Have 4 boards in hand, all stuffed (except front panel connectors to GMT) Have dedicated Wiener 9U crate with VME J1 backplane and custom Track Finder backplane installed Sector Processor – to – MS interface test currently underway Rice

US CMS DOE/NSF Review, 20 November Trigger - W. Smith14 CSC Trigger Status/Plans Muon Port Card, Clock Control Board, Sorter mostly validated Waiting for further integration tests before production CCB design revision to incorporate new CERN Clocking CSC beam test with Track-Finder was a success! Complete electronic chain test of synchronous data transmission from CSC front-end electronics to the Track- Finder Latest Clocking System from CERN tested and works Initial tests show that DT and CSC Track-Finders can exchange data Minor interface problems are trivial to address. Remaining CSC Trigger tests underway Some delay, but production should complete in early 2005