Friday 2 nd November 08:45 Stable beams Fill 3253 Initial luminosity ~7.3e33 cm-2s-1 09:45 Increase RF voltage from 10 MV to 12 MV 12:00 ADT to wideband.

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Wednesday 12 th September Pumping, removal of vacuum equipment from tunnel in the morning TOTEM & ALFA, RP movement tests: OK 11:50 pre-cycle started,
5/11/2012LHC 8:30 meeting Summary of Week 44 Coordination: Mike Lamont & Jan Uythoven.
LHC Wed 16 Sept 2015 Struggling with cryo o-night Tuesday - Wednesday 07:11 Injecting again 09:00 Dump on injection of train of 144 bunches, losses IP7.
Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
17/09/2012LHC 8:30 meeting LHC Summary Week 37 Coordination: Jorg Wenninger & Jan Uythoven.
Plan for start-up with beam Friday  19:00 Machine closed. Ramp for powering tests & pre-cycle  22:00 Pilots through nominal cycle up to collisions. Measure.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
LHC 8:30 meetingEBH 1  Cryogenics recovery in point 8  Meanwhile a couple of accesses:  MKI investigation on noise in IP2  Insulation Vacuum.
LHC 8:30 meetingEBH 11 Thursday 24 November 2011.
Saturday 7ish – refill for RP set-up 9:15 Going for Roman pot alignment. Stefano is coming. 12:10 TOTEM: Alignment of horizontal RPs B2 finished, short.
LHC status Wednesday 15 th July 2015 Coordination: Wolfgang Hofle, Mike Lamont.
08h15: Injection.  Correction injection oscillations.  Transfer line steering.  Losses at 30% of dump threshold, limited by SPS scraping. 12h35: Start.
Monday 12 th November 04:50 Beam dump, trip of RF line 4B, integrated L ~120 pb-1. Access for RF. 07:00 Injecting. FBCT phasing. Line steering. 09:59 Beam.
04:01 Injection kicker timing problems B2  Injection pre-pulse shifted, causing BETS to inhibit beam injection. 144 bunches on TDI.  Run without ROF.A81B2.
:00 meetingEBH 11 Saturday :00 meetingEBH 2  7:58 Fill 2483 (264 bunches) dumped by reference orbit set to zero in.
:00 meetingEBH 1  6:39 beam dump by BLM 655ms RS on BLMEI.05L4.B2E10_MBRB (which is downstream of BSRT B2).  The losses increased during.
Thursday 27 th October 00:57 fill 2257 dumped during squeeze (RQTF.A67B1) 03:52 stable beams fill #2258 4:33 Dumped, problem of LBDS dilution kicker power.
Tuesday 3 rd October STABLE BEAMS until 12:25 when we switched to ADJUST for a EOF test for Tobias  dump B2 first and then B1.  Dump at EOF test because.
LHC Status Sat Morning 30-June Bernhard Holzer, Jan Uythoven Status Friday Late: preparing restart some issues... LHCb dipole tripped / router problem.
Wednesday 5 th December until this morning 06:59 Stable beams fill #3375, L ~ 6.8e33 cm-2s-1. 10:40 Beam dump, trip of RD2.R5. Integrated L 72 pb-1 in.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Last 24 hours RQ4.L1 Lost going into collision Test ramp Storm
Friday 15th June 01:11 Injection.
Friday 18/03 07:15 Test ramp with pilot after the test of dynamic FIDEL correction. Ramp was OK, but fill was stopped due to the trip of several RQTFs.
Monday fill with 1092 bunches (6 h stable beams)
Tue :25 Beams dumped due to RF vacuum interlock
Tuesday 22nd January - morning
LHC Morning Meeting - G. Arduini
Fri 29/7 – Sat 30/7 09:00 End of fill 1990, PC trip RCBXV3.R1 (likely SEU on QPS). Integrated Luminosity: 41 pb-1. Access for MKI2 main switch replacement.
LHC Morning Meeting - G. Arduini
Wednesday 31 October: Morning
Bernhard Holzer, Joerg Wenninger
LHC Morning Meeting - G. Arduini
Friday 31st August & night
Wednesday 8th August & night
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
Friday :00 machine setup for luminosity run. Better b-to-b stability from injectors. 01:58 stable run with 228 bunches 11:00 luminosity leveling.
Wire almost entirely through beam before BLM triggers dump
Friday Morning 7:30 injection for fill 2908
Sunday
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Thursday morning 7:20 – 12:30 faults of BLM sanity check, RQX.L8 QPS trip and iris scanner in UJ47. Access: Pt 8 for ELQA on RQX.L8 (The voltage.
Monday – Morning Fill 3265 stable beams since 1:31
LHC Morning Meeting - G. Arduini
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Saturday 3rd November - morning
IP8 aperture measurements (07:30-10:30)
LHC Morning Meeting - G. Arduini
Thursday 26th July 13:21 Fill 2880 beam dumped
Thursday – Morning Energy matching at injection with H CODs
Cold compressor speed S45
Thursday 22 September 2011.
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Tuesday 20 September 2011.
Wednesday h18: 228b fill lost just before start of ramp.
Wednesday 26 October 2011.
Thu :00 Dumped beams, refill for Pb-Pb physics. No more protons in 2011… Some changes: Increase of flat top total voltage to 14 MV. Feed-forward.
Monday 14th May 00:03UFO at BLMQI.06R8.B2E10_MQML. Beam dump Re-steering required for TI2 03:28 STABLE BEAMS # e11 ppb, 4.11e33 cm-2s-1 13:36.
Friday :47 stable beams fill 3273
Friday During the night from Thursday to Friday: by mistake, SPS longitudinal blow-up was not active  Smaller transverse emittance from the.
Wednesday 6.10 Morning: Quench test at 450 GeV
Sunday 12th 00:29 Stable beam fill #1864. Initial lumi 1.1e33
Wednesday 8th (I) 09:22 Fill #1855. Beams dumped by Alice dipole trip Stable beams for 10.5 hours; int. lumi 31 pb-1 After investigation EPC could not.
Wednesday Following the struggle with the vacuum in IR2 over the night, drop intensity to 1.2E11/bunch. Fill first B1 – pretty quiet – then B2 – quite.
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Friday 2 nd November 08:45 Stable beams Fill 3253 Initial luminosity ~7.3e33 cm-2s-1 09:45 Increase RF voltage from 10 MV to 12 MV 12:00 ADT to wideband settings 12:38 Beams dumped, lost BLM crate L8. 79 pb-1 in 3h53m BLM card change and BLM CPU change. Access BBQ and ATLAS. 17:48 Start pre-cycle 19:30 Transfer line steering 20:29 Beams dumped on last injection B2, LHCb BCM 22:09 Filling for physics 23:39 Fill #3259. Stable Beams. Initial lumi 6.5e33 cm-2s-1 09:04 Beams dumped: Sector 67 trip, RB.A67 ST_ABORT_PIC. Integrated lumi 143 pb-1. LHC 8:30 meeting 3/11/2012

RF voltage up from 10 to 12 MV in fill LHC 8:30 meeting 3/11/2012 BSRT, no significant effect ALFA, sees an effect

Lumi after Vrf and ADT bandwitdth LHC 8:30 meeting 3/11/2012 Good for the lumi to increase to RF voltage ADT wideband settings still a (small) negative effect on lumi lifetime

BLM point 8 (Christos) The FEC on crate SR8.L has become unreachable twice with one hour difference in between. During the investigation it was noticed that one card has shown unreal temperature values in the last hours (see attached plot of the temperature of all the cards reported). The card was decided to be exchanged as a precautionary measure. It is not sure if the crate crashes are related. The CPU of SR8.L became unresponsive for a third time (after the exchange of the card in suspision) and therefore decided to also replace it. LHC 8:30 meeting 3/11/2012

Transfer line steering B2 horizontal oscillations Injection looked quite good for these days Last injection: Dump triggered by LHCb BCM upon injection of 144 bunches  In the past this was related to large satellite population... Injected the following fill without further steering LHC 8:30 meeting 3/11/2012

Fill # :39 Stable Beams. Initial lumi 6.5e33 cm-2s-1  Also indicates we don’t have perfect beam in the machine  Might be related to injection problems LDM in physics – satellites at +/- 25 ns larger B2: OK. ALICE lumi max about 8 – not that large. B1 B2 Called Anna for missing BSRT image: got it back Vertical tune B1 trimmed down by 3e-3 at the end of the squeeze thereby introducing a tune split. Presently produced about 140 pb-1 in 9 hours LHC 8:30 meeting 3/11/2012  0.7 %

Outstanding Urgent access ALICE, 4h Improve on injection oscillations and losses, especially B2 Move in TOTEM and/or ALFA at end of fill  ALFA: Saturday or Sunday daytime, with TCLs in or out.  TOTEM: possible time slot Sunday afternoon, only with TCLs out LHC 8:30 meeting 3/11/2012