Modify Existing Scanning Electron Microscope (SEM) SEM FE Probe Surface Science Study L. Laurent, S. Tantawi, R. Kirby *This research is funded by the.

Slides:



Advertisements
Similar presentations
Single-Cell Standing Wave Structures: Design
Advertisements

CLIC08 workshop Structure production: CERN activities and Master Schedule G. Riddone, W. Wuensch, R. Zennaro, Contributions from C. Achard, S. Atieh, V.
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
February 17-18, 2010 R&D ERL Andrew Burrill R&D ERL SRF Electron Gun Andrew Burrill February 17-18, 2010 SRF Electron Gun.
Lecture 11. Microscopy. Optical or light microscopy involves passing visible light transmitted through or reflected from the sample through a single or.
Henrik Loos LCLS FAC Meeting 27 October RF Gun Status LCLS Facility Advisory Committee Meeting October 26, 2005 Mechanical.
SEM FE Probe Surface Science Study L. Laurent, S. Tantawi, R. Kirby *This research is funded by the SLAC LDRD Program Modify Existing Scanning Electron.
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
Stefan Moeller XES FAC Review – April 16, 2006 X-Ray Endstation Systems (XES) Status Stefan Moeller.
Scanning Electron Microscope Jamie Goings. Theory Conventional microscopes use light and glass lenses SEM uses electrons and magnetic lenses to create.
David H. Dowell Injector RF Design November 3, LCLS Injector RF Gun: Design, Fabrication & Tuning Plans D. H. Dowell,
R·I·T Kate Gleason College of Engineering Design of a Tensile Load Frame for a Scanning Electron Microscope Senior Design Project Project Manager.
John Arthur Photon October 27, Photon Systems Overview John Arthur SLAC.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
David H. Dowell Injector April 29-30, 2004 LCLS Injector Overview D. H. Dowell, SLAC FAC Review April 29-30, 2004 Injector.
SPSU Progress on coatings and grooves M.Taborelli -Progress on C based coatings -Progress on rough coatings -Progress on SEY instrument -Grooves.
Question 27: Outline the key steps for industrialization of machine components and the likely remaining vulnerabilities in achieving them. Achieving industrialization.
X-rays are electromagnetic waves (like light) and have a wavelength about the size of atoms. From
Status of X-band program at RadiaBeam
CERN DC Spark System Capabilities Anders Korsbäck, BE-RF-LRF University of Helsinki.
Metal photocathodes for NCRF electron guns Sonal Mistry Loughborough University Supervisor: Michael Cropper (Loughborough University) Industrial Supervisor:
SEM (SCANNING ELECTRON MICROSCOPE) Özgen Buğdaycı Elif Topçuoğlu Yavuz Duran Hacettepe University
201 MHz NC RF Cavity R&D for Muon Cooling Channels
Dan Cheng 1/13/2015 LARP Copper Plated Trace Development Update.
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
BPMs and HOM-BPMs for the XFEL Linac N. Baboi for the BPM and the HOM teams (DESY, CEA-Saclay, SLAC, FNAL, Cockroft/Daresbury) XFEL Linac Review Meeting,
Advanced FE-SEM : from Nano-imaging to Chemical and Structural Analyses Chi Ma Division Analytical Facility Division of Geological and Planetary Sciences,
THE COCKCROFT INSTITUTE of ACCELERATOR SCIENCE and TECHNOLOGY UKNF RF: Status Cockcroft Institute (Dept. Engineering, Lancaster University, UK) January.
Other modes associated with SEM: EBIC
F.E.T.S. RFQ Mechanical Design by Peter Savage 7 th January 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
Update on Laser Beam Lines Christoph Hessler, Mikhail Martyanov, Valentin Fedosseev (CERN laser team)‎ Thanks to M. Battistin, N. Chritin, F. Galleazzi,
Status of GEM T2 assembly Outline Status of the GEM components Summary Tests TOTEM Collaboration meeting CERN / Risto Orava for Kari Kurvinen.
February 21-21, 2008JINR Scientific Council 103-d session IREN project status.
CLARA Gun Cavity Optimisation NVEC 05/06/2014 P. Goudket G. Burt, L. Cowie, J. McKenzie, B. Militsyn.
1 TPC R&D proposal from the WIS group I. Ravinovich WIS I. Ravinovich12/15/2015.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
Status of the Photocathode R&D for ATF RFgun N.Terunuma (KEK)
Measurements of the X-ray/pump laser pulse timing Valery Dolgashev, David Fritz, Yiping Feng, Gordon Bowden SLAC 48th ICFA Advanced Beam Dynamics Workshop.
1 Status of Vacuum Process Facilities at SSL 16 October 2009 Sharon R Jelinsky Space Sciences Laboratory, UC Berkeley.
MICE RF Cavity Measurements Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory July 8, 2010 Rutherford Appleton Laboratory, UK.
PASI OsC meeting 12th July 2012
CLAS12 Drift Chamber Prototyping
1 Vacuum chambers for LHC LSS TS Workshop 2004 Pedro Costa Pinto TS department, MME group Surface Characterization & Coatings Section.
PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand WP 4 of the JRA2 PHIN 1.Status of the construction of RF guns.
El-Mul Technologies Ltd – Confidential & Proprietary El-Mul Technologies El-Mul Technologies Ltd – Confidential & Proprietary Prof. Eli Cheifetz, Chairman.
1 Stellarator Core Metrology issues NCSX WBS-1 Meeting April 2, 2003 What are we measuring? When? How do we take the measurements? How do we correlate.
BPM for Spectromety development status A. Lyapin.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
COPPER PHOTOCATHODES DEVELOPMENTS AT ASTEC R. Valizadeh Accelerator Science and Technology Centre Science & Technology Facility Council, UK.
Nanotechnology Research Leo Lau Materials Science & Technology Research Centre The Chinese University of Hong Kong.
MICE RF Coupler Modifications Update 4/30/2015 Allan DeMello.
Clive Field, Reggie Rogers, Venkat Srinivasan Undulator Week: BFW Card Status Update 01/23/ BFW Card - Physics Requirements.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
Clive Field, Venkat Srinivasan Undulator Week: BFW Card Status Update 04/30/ BFW Card Status on behalf of: Keith Caban.
RFCC Engineering Status and Plans Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Meeting March 6, 2012 March 6, 2012.
Progress on Beryllium Cavity Design R. Fernow, D. Li, R. Palmer, D. Stratakis, S. Virostek as told to Michael S. Zisman Center for Beam Physics Accelerator.
Presentation on SEM (Scanning of Electron Microscope) Represented by:-Ravi Kumar Roll:- (BT/ME/1601/006)
News and Introduction from CERN June 15th, 2005
METALLURGICAL MICROSCOPE
Scintillation Material Encapsulation Fixture
Teleconference ACS – FREIA 10th May 2017
A Metallurgical Comparison of Mack T-12 Rod Bearings. Lots U, V & W
SEM In-situ Experiments for Breakdown Study
Uppsala University, WP 9.2 In-situ discharge experiments inside an Electron-microscope Field emission probe Simple scanning Cut and Slice, voids Upgrade.
X-ray Pump-Probe Instrument
SLAC Production Status
MICROSCOPES.
Field-Emission mapping measurement on Copper Surface
Presentation transcript:

Modify Existing Scanning Electron Microscope (SEM) SEM FE Probe Surface Science Study L. Laurent, S. Tantawi, R. Kirby *This research is funded by the SLAC LDRD Program *Laboratory Directed Research and Development

SEM FE Probe Surface Science Study Overview  Field emission probe will detect features that exhibit premature field emission. The surface imaging capability of the SEM and elemental x-ray analysis can then be used to obtain topographical and material information about these emission sites.  In both cathode and high gradient research we are faced with challenging physics that will likely only be overcome by understanding the physics and chemistry that is taking place at the surface.  One of the strongest benefits of this system will be the ability to analyze not only test materials but actual components before and after they have been installed into systems.

SSRL Dispenser Cathode Cathode Research The performance of cathodes is highly dependent by the physics and chemistry taking place on the surface. The FE SEM system will be used to identify possible causes of non-uniform cathode emission.

LCLS Photocathode Inside SLAC SEM vacuum Chamber The current probe will provide diagnostic support to help understand emission physics and in advancing next generation photocathode high brightness beams. We will use the current probe system to find features that may be responsible for breakdown. Laser Cleaning Breakdown Cathode Research

Moly Plated Cu - Frascatti CuZr-SLAC CuCr CuZr-CERN HIP Cu - KEK TiN Coated Cu - KEK CuZr-SLAC W Iris Insert - CERN High Gradient Research -- Materials --

High Gradient Research -- Surface Finish -- Pre-RF Post-RF Etch Pits Electro- polished

Two Year Plan Year 1: 1.Design and develop an electron microscope-based high-electric-field current- emission probe to study topographic material features and their impact on cathodes and high gradient structures. 2.Evaluate planar test samples in order to calibrate and optimize the system. Year 2: 3.Work with non-planar geometries using existing components. 4.Perform iterative analysis on pre and post tested components (e.g. cathodes and high gradient structures).

LDRD SEM FE Probe Current Status and Program Overview -pg1  Design Stage: Assembly drawings are completed. Field emission probe assembly and auxiliary components have been specified. Software control program outlined.  Ordering and Fabrication of Parts: Fixturing for the probe assembly has been designed and fabricated. A data control and acquisition computer has been ordered has arrived (but still waiting on GPIB/USB control cable). Keithley pico-ammeter has been received. Waiting Delivery: Field Emission Probe (Capital equipment purchase order) has been delayed by the manufacturer and is now expected to arrive on May 27 th.  Installation The installation phase should be quick. We still need to drill a hole into the SEM vacuum chamber for a feedthrough flange. We will not do this until FT flange arrives. No room for costly dimensional errors.

LDRD SEM FE Probe Current Status and Program Overview-pg2  Initial Testing and Calibration of the System on Planar Test Samples (e.g. Copper Coupons): Software development phase. Begin test sample measurements and calibration by 6/30/11.  Analyze Existing (already tested) Cross Sectioned Accelerator Structures and Cathodes. Evaluate working with non planar geometries.  Surface Science Study to Include Iterative Process (before and after rf testing and/or beam operation): Cathode Research: Demountable Cathodes High Gradient Program: Clamped structures

New Higher Resolution SLAC SEM in 2011…?? SLAC SEM is reaching end of life status. The goal is to optimize the system in SLAC’s current SEM and than move the system to a new SEM in the future when funding is available. New SEM was approved in 2010 but purchase requisition was halted days before order was placed due to budget being on continuing resolution. New RFP is being submitted within the month and we are hopeful that this one will go through and to have the new SEM before the end of this fiscal year (September 2011). Present day SEM’s have significantly better capabilities and resolution than SLAC’s current SEM.

Summary  In high gradient structures and cathode development we are faced with challenging physics that will likely only be overcome by increasing our surface science capabilities.  The current probe coupled with SEM imaging and EDX spectrometry will provide additional diagnostic support to help understand surface and emission physics.  The SEM field emission probe will be available for a wide variety of applications.  We hope to increase the field emission probe system capabilities by installing it into a new higher resolution SEM as soon as funding is available.