CLEARLY WE KNOW HOW TO BURY LARGE STRUCTURES. DRILLING AND BURYNG ALONG THE SAME ROUTE AS THE “POLES” SHOWS IT CAN BE DONE !!

Slides:



Advertisements
Similar presentations
Florida Public Service Commission 2007 Hurricane Preparedness Briefing May 23, 2007 Kissimmee Utility Authority Ken Davis Vice President Engineering &
Advertisements

Progress Energy Florida 2007 Hurricane Preparedness Florida PSC Hurricane Preparedness Meeting May 23, 2007.
Cooperative Continuity Management
Global Internet Infrastructure (that stability thing….)
Energy Management Trees Work for. 1. Why do we plant trees? Add Beauty – Spring flowers, fall foliage color, interesting bark, fragrance – Screen unwanted.
Tree-trimming Standards and Practices City Council Work Session November 19, 2007.
Storm Hardening Initiatives Robert Schimmenti VP Engineering and Planning Consolidated Edison Company of New York, Inc. June 12, 2013.
Feeder Maintenance Program. The purpose of the Cooperative is to provide safe, reliable, low-cost energy services in fiscally responsible partnership.
Meter/Service Line Inspection s FECA Engineers Conference June 11, 2013 R. Corey Parr, CLCP
> >
1 March 1, 2007 Report An Overview October 30, 2006 – Staff Workshop.
Siting Considerations for Utility Scale Photovoltaic Power Generation Systems. Tim Green, Brookhaven National Laboratory NE FWS Biologists Conference February.
Building the Ultimate IT Portfolio from Scratch Peter Grant Advisor, IBRS
Dayton Power and Light Patrick Slone EMS Safety Coordinator.
Forest cutting and reproducing techniques
LAND LIQUEFACTION HOW DID EARTHQUAKES AFFECT THE LAND RECLAMATIONS?
DEFORESTATION Deforestation is clearing Earth's forests on a massive scale, often resulting in damage to the quality of the land. Forests still cover about.
Experience you can trust. Hurricane Hardening Commission Staff Workshop on Electric Utility Infrastructure Richard E. Brown, PhD, PE Tallahassee,
Electric Infrastructure Workshop Gulf Power Company January 23, 2006.
Electrical & High Temperature Utility Distribution Upgrade.
Why Make NJ Energy Strong? Sandy, Hurricane Irene and the October 2011 snow storm represent extreme weather patterns that may become commonplace. For.
Introduction & Opening Remarks l Hurricanes of 2004 & 2005 highlight the need for a fresh look at these issues l We support this effort and will be active.
Copyright © 2014 Oracle and/or its affiliates. All rights reserved. | Smart Utility Operations Breaking down the barriers in your organization Mike Ballard.
River and Canal Maintenance Activities Allowed Under RIDEM Wetlands and Water Quality Regulations Russ Chateauneuf Chief Groundwater & Wetlands Protection.
Tree Pruning Horticultural pruning for your trees By Paul Rios.
SAFE PRACTICES IN POWER DISTRIBUTION SYSTEM UNDER NESCO.
Frankfurt (Germany), 6-9 June 2011 Nuno Ferreira– Portugal – Session 3 – Paper ID:561 UTILITIES RESPONSE TO EXTREME CONDITION EVENTS EDP DISTRIBUIÇÃO CASE.
Electric Utility Infrastructure Commission Staff Workshop January 23, 2006.
Behaviour Change to achieve Greener Homes through Market Transformation Stephen Garland The Scottish Government.
UNDERGROUND CABLE.
Florida Municipal Electric Utilities May 6, 2009 Paul Kalv, Director City of Leesburg Electric Department Florida Public Service Commission Docket No.
Tampa Electric Company 2009 Hurricane Season Preparation Regan Haines Director, Energy Delivery May 6, 2009.
2014 Hurricane Season Preparation Informal Meeting for Electric Utilities with Florida Public Service Commission Staff March 26, 2014.
2006 Hurricane Preparedness June 5, 2006 Sumter Electric Cooperative, Inc R. Ben Brickhouse: Director of Engineering & IT John J. LaSelva: Director of.
Understand how human influences impact the lithosphere.
© 2015 Universal Service Administrative Company. All rights reserved E-rate Program Applicant Trainings I Fiber Options1 Fiber Options Deep Dive:
Tampaelectric.com Presented to the Florida Public Service Commission May 1, 2008 Tampa Electric Company 2008 Hurricane Season Preparation Regan Haines.
2008 Hurricane Season Preparedness Briefing Gulf Power Company Presented by Andy McQuagge Power Delivery Services Manager May 1, 2008.
2015 Storm Readiness Report Kurt Miller, Director of Engineering Suwannee Valley Electric Cooperative, Inc.
Cooperative Continuity Management Bill Willingham Florida Electric Cooperatives Association, Inc. Tallahassee, FL.
Informal Meeting with FPSC Staff 2015 Hurricane Season Preparation March 18, 2015.
FOR OVER 100 YEARS…LIFE. POWERED BY EDISON. Southern California Edison Presentation to City of Palos Verdes Estates December 13, 2011 Marvin Jackmon, Regional.
Florida Keys Electric Cooperative Association, Inc. Storm Hardening Florida Public Service Commission May 1, 2008 Scott Newberry, CEO John Stuart, COO.
City of Sarasota Franchise Agreement Rae Dowling, Buck Martinez and Ken Rubin June 16, 2010.
How to Maintain Solar PV Kits and Increase Their Performance?
OLD TOWN COMMUNITY WORKSHOP
Mobile workforce management solution
Best Professional Gutter Cleaning Services in Essex
Progress Energy Florida 2008 Hurricane Preparedness Florida PSC Hurricane Preparedness Meeting May 1, 2008.
5.08 ASSET MANAGEMENT AND DECISION SUPPORT IN A COST-CUTTING REGIME
Factors to Consider when Designing a Reliable Power Grid
Electricity Demand Response and Advanced Metering for Integrated Utilities Arkansas Public Service Commission Lonni Dieck AEP May 24, 2007.
Florida PSC 2014 Hurricane Season Preparation
Florida PSC Hurricane Preparedness Meeting May 6, 2009
Factors to Consider when Designing a Reliable Power Grid
2007 Hurricane Season Preparedness Briefing

Line Clearance Tree Trimming Operations
Time to Get Blocked Drains Cleared with Mark Meersman
Agenda 1. welcome and introductions 2. introducing the CAMS project
½ of 6 = 3.
Pole of EDF Breaker © ABB Group May 2, 2019 | Slide 1.

Advanced Metering Infrastructure Smart Meters
Predictive Analytics Can Boost the Bottom Line
Outsourcing web development services is a part of your business functions that can significantly improve productivity and efficiency, as well as reduce.
SCE’s 2019 Wildfire Mitigation Plan
Pole Position Student Points Time
A B C D.
Presentation transcript:

CLEARLY WE KNOW HOW TO BURY LARGE STRUCTURES. DRILLING AND BURYNG ALONG THE SAME ROUTE AS THE “POLES” SHOWS IT CAN BE DONE !!

DPS: “It should be noted that undergrounding offers lower storm damage costs and lower preventative maintenance cost when compared with overhead construction”.

CONTINUED INVESTMENT IN THE SAME OVERHEAD TRANSMISTION LINES WILL GIVE THE SAME RESULTS SUCH AS CUTTING TREES DOWN – MASSIVE OUTAGES – AND LOTS OF $$$$ REPAIR BILLS.

SEE WHAT OTHER STATES ARE DOING. UTILITIES WORK TOGEAHTER TO BURY DPS: “It should be noted that undergrounding offers lower storm damage costs and lower preventative maintenance cost when compared with overhead construction”.

Enhance the tree trimming and vegetation management process. PSEG Long Island will continue work to improve grid resiliency by implementing vegetation work specification and technology changes to achieve an industry best-practice program.

WE CAN BE GREAT ONCE AGAIN AND BE A DESIRABLE PLACE TO LIVE AND WORK

WE CAN BE GREAT ONCE AGAIN AND BE A DESIRABLE PLACE TO LIVE AND WORK MAKE OUR NATION PROUD BURY THE LINES.