US CMS DOE/NSF Review: April 11-13, 20001 Trig. - Estimate to Complete.

Slides:



Advertisements
Similar presentations
LHC CMS Detector Upgrade Project US CMS Trigger Upgrade Introduction to Cost & Schedule Wesley Smith, U. Wisconsin Fermilab Directors Review 16 July 2013.
Advertisements

US CMS DOE/NSF Review: May 8-10, US CMS Cost & Schedule Mark Reichanadter US CMS Project Engineer DOE/NSF Review 8 May 2001.
CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
CSC Muon Trigger September 16, 2003 CMS Annual Review 1 CSC Muon Trigger - Annual Review Jay Hauser, with many slides from Darin Acosta and Stan Durkin.
CSC Muon Trigger September 16, 2003 CMS Annual Review 1 Current Status of CSC Trigger Elements – Quick Summary Jay Hauser, with many slides from Darin.
Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 1 CSC Trigger Primitives Test Beam Studies Main Test Beam 2003 Goals: Verify the peripheral crate.
Jay Hauser, Fermilab Director’s Review, Apr. 30, CSC Muon Trigger Jay Hauser Director’s Review Fermilab, Apr 30, 2002 Outline The CSC muon trigger.
Jay Hauser, Emu meeting at Florida, 9 January CSC Trigger Meeting Summary Cast of many.
US CMS DOE/NSF Review: June 2002, Darin Acosta, University of Florida1 Muon Track-Finder Trigger Darin Acosta University of Florida June, 2002.
CSC Trigger Report: Results from June 25 ns beam test Production plans Software Darin Acosta University of Florida.
CHEP March, B. Scurlock, University of Florida1 D. Acosta, V. Golovtsov, M. Kan, A. Madorsky, B. Scurlock, H. Stoeck, L. Uvarov, S.M. Wang University.
The Track-Finding Processor for the Level-1 Trigger of the CMS Endcap Muon System D.Acosta, A.Madorsky, B.Scurlock, S.M.Wang University of Florida A.Atamanchuk,
Printed by Topical Workshop on Electronics for Particle Physics TWEPP-08, Naxos, Greece / September 2008 MEZZANINE CARDS FOR.
US LHC Detector M&O Evaluation Group, February 5-6, 2004: Trigger1 US CMS Trigger DOE-NSF Review Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager.
US CMS DOE/NSF Review, May Trigger C&S Parallel - W. Smith1 Trigger Cost, Schedule Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager.
Status of the CSC Track-Finder Darin Acosta University of Florida.
Wesley SmithAug. 18, 2010 Trigger Budget Review: Labor & M&S - 1 US CMS FY 2011 Budget Review Trigger Labor & M&S Wesley Smith Aug. 18, 2010 Outline Overview.
DOE/NSF Review May 8-10, US CMS US CMS Detector Project Overview Dan Green US CMS Project Manager DOE/NSF Lehman Review, May 8-10, 2001.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
Track-Finder Trigger at the Beam Test Results and Features Darin Acosta, Rick Cavanaugh, Victor Golovtsov, Lindsey Gray, Khristian Kotov, Alex Madorsky,
CSC EMU Muon Sorter (MS) Status Plans M.Matveev Rice University August 27, 2004.
CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
W. Smith, U. Wisconsin, US CMS Collaboration Meeting, May 10, 2002: TriDAS 1 US CMS TriDAS US CMS Meeting Wesley H. Smith, U. Wisconsin CMS Trigger Project.
W. Smith, US LHC Detector M&O Evaluation Group, January 18, 2006CMS Trigger - 1 US CMS Trigger DOE-NSF Review Wesley H. Smith, U. Wisconsin CMS Trigger.
Muon Port Card, Optical Link, Muon Sorter Upgrade Status M.Matveev Rice University December 17, 2009.
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF Mikhail Matveev Rice University 17 August 2012.
Upgrade of the CSC Endcap Muon Port Card Mikhail Matveev Rice University 1 November 2011.
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
CSC Endcap Muon Port Card and Muon Sorter Status Mikhail Matveev Rice University.
Claudia-Elisabeth Wulz Anton Taurok Institute for High Energy Physics, Vienna Hannes Sakulin CERN Annual Review CERN, 24 Sep Global Trigger Global.
T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
W. Smith, LPC Meeting, February 17, 2006 CMS Trigger - 1 US CMS Trigger 2006 LPC Meeting Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager February.
US CMS DOE/NSF Review, May Cal. Trig. 4 Gbaud Copper Link Cards & Serial Link Test Card - U. Wisconsin Compact Mezzanine Cards for each Receiver.
CMS Latency Review, 13th March 2007CSC Trigger 1 Latency and Synchronization update.
US CMS DOE/NSF Review: June 2002, B.Paul Padley, Rice University1 CSC Muon Trigger On Detector Components B. Paul Padley Rice University June, 2002.
Track-Finder Test Beam Results Darin Acosta. Darin Acosta, University of Florida 30 July 2004 Trigger Meeting CSC Beam Test (Muon Slice Test) ME.
Tridas Week, November 2000Darin Acosta1 Status of the CSC Track-Finder D.Acosta, A.Madorsky, S.M.Wang University of Florida B.Cousins, J.Hauser, J.Mumford,
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, September 2004 Trigger Report - 1 CSC Trigger Muon Port Card & Sector Processor in production Mezzanine.
US CMS DOE/NSF Review, 20 November Trigger - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status.
Electronics Review, May 2001Darin Acosta1 OPTICAL SP 1 Muon Sorter 3  / port card 3  / sector ME1 ME2-ME3 ME4 SR DT TF SP From CSC Port Cards MS MB1.
Upgrade of the CSC Endcap Muon Port Card with Spartan-6 FPGA Mikhail Matveev Rice University 30 April 2012.
US CMS DOE/NSF Review, May Trigger Plenary - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF.
M.Matveev Rice University March 20, 2002 EMU Muon Port Card Project.
W. Smith, US LHC Detector M&O Evaluation Group, January 28, 2005CMS Trigger - 1 US CMS Trigger DOE-NSF Review Wesley H. Smith, U. Wisconsin CMS Trigger.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
CMS Week, 3-7 November CSC Trigger Test Beam Report Cast of many.
Update on CSC Endcap Muon Port Card
CSC EMU Muon Port Card (MPC)
Combined SR/SP UF Fits all of previous SP board logic! Main FPGA
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF
Muon Track-Finder Trigger
US CMS Detector Project Overview DOE/NSF Lehman Review, May 8-10, 2001
CMS EMU TRIGGER ELECTRONICS
Regional Cal. Trigger Milestone: Major Production Complete
Current Status of CSC Trigger Elements – Quick Summary
CSC Muon Trigger - Annual Review
CSC Trigger Update Specific issues:
Darin Acosta University of Florida
Regional Cal. Trigger Milestone: Production & Testing Complete
CSC Trigger Primitives Test Beam Studies
CSC Trigger Muon Port Card & Sector Processor in production
New Calorimeter Trigger Receiver Card (U. Wisconsin)
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
Regional Cal. Trigger Milestone: Production Complete - U. Wisconsin
CSC Trigger Meeting Summary
Sector Processor Status Report
CSC Muon Sorter Status Tests Plans M.Matveev August 21, 2003.
Plans for the 2004 CSC Beam Test
Presentation transcript:

US CMS DOE/NSF Review: April 11-13, Trig. - Estimate to Complete

US CMS DOE/NSF Review: April 11-13, OPTICAL SP 1 Muon Sorter 3  / port card 3  / sector ME1 ME2-ME3 ME4 SR DT TF SP From CSC Port Cards MS MB1 PC From DT Track-Finder 36 Sector Receivers 12 Sector Processors To Global Muon Trigger GMT RPC 44 44 88 CSC Trigger Overview 12 sectors (UCLA) (Florida)(Rice) (Vienna) From DT Track-Finder (Rice)

US CMS DOE/NSF Review: April 11-13, Prototype Crate Layout One sector is half of Track- Finder crate SPSR CCB Six crates for entire system

US CMS DOE/NSF Review: April 11-13, Sector Receiver Status Schematics near complete, Long lead-time parts ordered

US CMS DOE/NSF Review: April 11-13, Trigger - BCWS and BCWP

US CMS DOE/NSF Review: April 11-13, SlidesSlides (Slides before here are extras not to be shown)

US CMS DOE/NSF Review: April 11-13, Strip FE cards Wire FE cards Port Card WBS PC Sector Receiver WBS OPTICAL SRSP CSC Track-Finder CSC Muon Sorter Global  Trigger DTRPC FE Global L1 2  / chamber 3  / port card 3  / sector 44 44 44 44 LCT Strip LCT + Motherboard card Wire LCT card On chamber In peripheral crate In counting house TMB LCT RPC Interface Module RIM CSC Front End &Trigger EMU System Trigger System (UCLA) (Florida) (Rice) (Vienna) (UCLA) (Rice) (UCLA) (CMU) (OSU) Sector Processor WBS ,

US CMS DOE/NSF Review: April 11-13, Muon Port Card Design & Optical Link Tests Muon Proto. Port Card passed design review in Oct. Will be produced for summer pilot test (Rice) Optical component test board based on HP G-Link demonstrated synchronous 1 Gbit/sec using 40 MHz clock with bit error rate < for connection from Muon Port Card in peripheral crates on detector to Sector Receiver in counting Room track finder crate (Rice)

US CMS DOE/NSF Review: April 11-13, Sector Processor Prototype Bunch Crossing Analyzer Extrapolation Units Track Assembler Units Final Selection Unit Assignment Units VME/JTAG interface (under development) XCV50BG256 XCV400BG560XCV150BG352 XCV50BG256 SRAM Custom ChannelLink backplane Standard VME Layout complete 12 layers Tests set for 6/1/00

US CMS DOE/NSF Review: April 11-13, Trigger - BCWS and BCWP Cumulative BCWP/BCWS = 85% indicating little schedule slippage. Trigger subsystem has completed BCWP/EAC = 22% of the project. Corrected for DAQ attribution to Trigger Obligation of ASICs under contract, not invoiced Schedule slip for ASIC development corrected by securing vendor contract Schedule slip for Muon Trigger boards corrected this year by new personnel

US CMS DOE/NSF Review: April 11-13, Trigger Resource Usage Engineering and Technical resources are compared to the people called out in the annual SOW. This tracking ensures that the needed labor is deployed.

US CMS DOE/NSF Review: April 11-13, TRIDAS - Contingency Use Schedule advanced for ASIC purchases, reducing escalation Obligation of ASICs under contract at small increase over original estimate No significant contingency use thus far (note scale)

US CMS DOE/NSF Review: April 11-13, Trig. - Estimate to Complete M&S 35% Trigger Cost to Complete: $5.7 M 65% EDIA

US CMS DOE/NSF Review: April 11-13, Trigger - Yearly BCWS Costs ramp up until production, the bulk of which happens in FY02. M&S costs dominate at 65% of the ETC.

US CMS DOE/NSF Review: April 11-13, Status: first draft exists. Trigger - Milestones Critical Level 1 Milestone is TDR, planned for year end. TDR will have schedule for trigger project with tie points to CMS subsystems approved by CMS management & LHCC.

US CMS DOE/NSF Review: April 11-13, Last Review Concerns Increase Physicist Effort Calorimeter Trigger: Wisconsin: Faculty Search involving CMS Trigger Effort Muon Trigger Florida & UCLA: support for postdoc continuing UCLA: Prof. Bob Cousins joins Increase Engineering Effort Wisconsin: add engineer (now 4 FTE available) Florida: add engineer + 3 PNPI visitors (3.5 FTE*) Rice: add 1/2 engineer (2.5 FTE*) (*shared w/EMU) UCLA: add engineer + FPGA consultant (1 FTE)

US CMS DOE/NSF Review: April 11-13, Issues from Last Review Calorimeter Trigger: Serial link from E/HCAL readout Test results provide proof of principle Vendor Support for ASICs Contract signed with Vitesse for all ASICs Final Algorithms & Tower Geometry Agreed and being written up in TDR Muon Trigger Peripheral Crates: Plan developed: crate electronics & mounting Overlap Region btw. CSC & Drift Tube Agreement with Vienna on design

US CMS DOE/NSF Review: April 11-13, Plans for this year Muon Trigger: Construct & test prototype port card, sector receiver, sector processor, clock card, backplane Integration test of above components with each other and EMU prototypes Calorimeter Trigger Complete & test prototype Phase, Boundary Scan, Sort, Electron ID ASIC’s w/Vitesse Produce and test 2nd prototype Receiver Card, Backplane, Electron ID Cards w/ ASICs Trigger Group Write TDR

US CMS DOE/NSF Review: April 11-13, Conclusions - Trigger Calorimeter Trigger Prototype Program Adder ASIC tested and in production Phase, Bscan ASIC passed design review Prototype Receiver Card, Electron ID Card, Backplane tested Muon Trigger Prototype Program Ready by June: Port Card, Sector Receiver, Sector Processor, Backplane, Clock Board Track-finder integration test this summer Project Management: Good cost experience thus far Effective action taken to recover schedule