MCD Status Report Trevor Watson4 February 2008. 4 Feb 2008 MCD Status Report Some facts and figures about the main MCD processes : loading of new documents.

Slides:



Advertisements
Similar presentations
IPC reform - how will commercial products be affected? Rob Willows VP Patent Office Relationships, Thomson Scientific and Chairman, PatCom Technical Working.
Advertisements

Antonios Farassopoulos Head of International Classifications and WIPO Standards Service Global IP Infrastructure Department Combined CPC/FI Introduction.
IPC REFORM Objectives and principal Features Antonios Farassopoulos World Intellectual Property Organization IPC Forum 2006 Geneva.
Revision Policy and Procedure of the reformed IPC Limitations and Perspectives Antonios Farassopoulos - WIPO February 2008.
Title slide European Patent Office The Master Classification Database Jürgen Rampelmann IPC Forum, Geneva 13 February 2006.
Third IPC Workshop (WIPO)
IPCRECLASS training Reclassification in the IPC Geneva February 26, 2013 Patrick Fiévet Head of IT Systems Section.
4 th DataGRID Project Conference, Paris, 5 March 2002 Testbed Software Test Plan I. Mandjavidze on behalf of L. Bobelin – CS SI; F.Etienne, E. Fede – CPPM;
ICIS-NPDES Plugin Design Preview Webinar ICIS-NPDES Full Batch OpenNode2 Plugin Project Presented by Bill Rensmith Windsor Solutions, Inc. 3/15/2012.
Sept 2001Adele Hoskin Patents, continued US International Patents.
Patent Information: Open Patent Services 3rd Annual Forum for SMEs Information Workshop on European Bioinformatics Resources Nigel S. Clarke Manager.
Payer User Group Webinar – 7/31/2014. Agenda Welcome (5 minutes) ◦Opening Comments/ Review ◦Meeting Goals Chapter 243 Changes (25 minutes) ◦Clarification.
1 QUESTEL ORBIT.COM. 2 QUESTEL French company Producer and provider of online and internet services Collection of patents, trademarks, designs, scientific-technical.
AAM & Your Media Brand November 7, 2013 Diane Szubrych Senior Manager, Publisher Relations.
United Nations Economic Commission for Europe Statistical Division Seasonal Adjustment Process with Demetra+ Anu Peltola Economic Statistics Section, UNECE.
The IPC development plan for the next five years IPC Workshop February 2013 Geneva Antonios Farassopoulos Director, International Classifications and Standards.
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
Report on IPC-related IT systems IPC Committee of Experts 46 Geneva February 26, 2014 Patrick Fiévet Head of IT Systems Section.
Implementation of the reformed IPC: Slovenia Janez Kukec Mezek Head of Information and Promotion Department Slovenian Intellectual Property Office.
IPC Working Group 30 - Updates on IT support for the IPC Geneva November 6, 2013 Patrick Fiévet Head of IT Systems Section.
Processing and circulation of notifications: the experience of the Secretariat Special Meeting on Procedures for Information Exchange Geneva, 2 November.
 Advanced Metering Working Group (AMWG) Update to RMS 1 August 5, 2014.
Developing Policy and Procedure Management System إعداد برنامج سياسات وإجراءات العمل 8 Safar February 2007 HERA GENERAL HOSPITAL.
Plans to Accelerate Revision and Publication Procedure of the IPC IPC Workshop February 2013 Geneva Ning XU IPC Section - WIPO.
IPC Revision in Practice EPO8 February MCD revision life-cycle 3-6 months before entry into force Load Revision Concordance List (RCL) and Valid.
Citibank Travel Card Program Update July Citibank Travel Card Status Merchant Category Codes (MCC) MCC templates have received approval by the State.
A Centralized Service for Reclassification? Anders Bruun, Swedish Patent & Registration Office IPC Workshop February 4th, 2008.
IPC Reform- Database Implementation Brian Barrington PCT Information Services World Intellectual Property Organization.
Outstanding Issues with Reporting and Data Submissions.
UNCLASSIFIED – For Official Use Only 4 Electronic Document Access (EDA) PDS Conformance Overview.
IPC reform 2006: WIPO Products and Services for the new IPC Special seminar for patent information vendors World Intellectual Property Organization WIPO.
1 Geant4 Documentation Dennis Wright Geant4 Delta Review 9 October 2002 Internal documentation review Documentation improvements Plans for future improvements.
Introducing EPO PATSTAT EPO Worldwide Patent Statistical Database James Rollinson.
Handover of the working Lists management from the EPO to WIPO IPC Committee of Experts 48 Geneva February 25, 2016 Patrick Fiévet Head of IT Systems Section.
Data Comparison Setup.
WIPO Fourth IPC WORKSHOP
Use Cases Discuss the what and how of use cases: Basics Benefits
Head, IT Systems Section
IPCRECLASS training Reclassification in the IPC
Urban Audit 3 State of play
Presented by EPO and USPTO
Time to Reach New Heights
Report on IPC-related IT systems IPC Committee of Experts 46
February 2018 JAPAN PATENT OFFICE
Head of IT Systems Section
Head, IT Systems Section
LAMAS Working Group January 2016
Car Hire Data Exchange (CHDX) Edits Project Update
بسمه تعالی کارگاه ارزشیابی پیشرفت تحصیلی
Current Conflicts and Complications
Head, IT Systems Section
Head of IT Systems Section
LAU and SIRE Agenda: 5.3; Document 11
Agenda Item 2.1 SES 2014: follow-up
PUBLICATION OF IPC NEW FEATURES IN IPC-2009
LAMAS October 2016 Agenda Item 2.1
Report on IPC-related IT systems IPC Revision Working Group 39
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
2a. Status of WFD reporting
SBS Quality reporting item 4 of the agenda
Report on IPC-related IT systems IPC Committee of Experts 49
Report on IPC-related IT systems IPC Revision Working Group 40
Head, IT Systems Section
WFD River Basin Management Plans :
Item 4.2 – Towards the 2016 AES Philippe Lombardo Eurostat-F5
February 2019 JAPAN PATENT OFFICE
Head of IT Systems Section
Draft implementing act on Monthly Unemployment Rate (MUR) Item 3
Item 5 Modernisation of the EU-SILC Production
Wide World of Espacenet
Presentation transcript:

MCD Status Report Trevor Watson4 February 2008

4 Feb 2008 MCD Status Report Some facts and figures about the main MCD processes : loading of new documents from 2006 (IPC8 Frontfile) loading of IPC data for pre-2006 documents (IPC8 Backfile) IPC Revision

4 Feb 2008 How much IPC data is there in the MCD ? LocationLevel No. of IPC Symbols Family (37m) Subclass Core Advanced 760, Publication (60m) (5m) Subclass Core Advanced ,300, Pre-2006 (55m) Subclass Core Advanced

4 Feb 2008 % documents loaded in MCD with valid IPC8 (by pub date)

4 Feb 2008 Frontfile errors and warnings for documents published in November 2007 Total number of documents Advanced level symbols stored EInvalid symbols not stored371 WVersion Indicator incorrect, value from Validity File taken % WClassification value defaulted to 'N' or 'I'540 WIndexing code not allowed as invention information, changed to 'N'233 WAction date empty, or invalid, set to publication date % WOriginal/Reclass indicator not 'B', 'R', 'V', or 'D', defaulted to 'B' % WReclassified IPC provided as new pub data in front file1.600 WSource indicator not 'H', 'M', or 'G', defaulted to 'H' % WAdditional information delivered as 'F', changed to 'L'36 WMore than one 'F' provided, defaulted to 'L'35

4 Feb 2008 MCD backfile history (pre-2006 documents) IPC8 derived from ECLA, IPC 1-7 (and incrementally in 2006, 2007) AU, DE, JP, EAPO, LT, PT, SI, US DE, MD, RO, RU BR, CZ, (KR), UA

4 Feb 2008 Sources of backfile data Sources of advanced family-level symbols - January 2008 ECLA24.4m(35%) IPC1-79.6m(14%) Backfiles from NOs35.1m(51%) Total69.1m Overall level of completeness (by document) around 91%

4 Feb 2008 Backfile completeness overall figure of 91% can only be a rough guide aspects of completeness –date –kind codes –technical area –quality (the difficult one !) suggestion : –each NO to produce a standard 'Statement of MCD Completeness' for their own collection

4 Feb 2008 MCD revision life-cycle Load RCL and VSF Distribute working lists Store results (with auto deactivation) Automatic reclassificationxx Distribute residual working lists Exchange results Deactivate remaining symbols (?)

4 Feb 2008 Revision periods Families on original working lists Families on residual working lists ( ) docs that arrived after first WLS - docs where new symbols not added

4 Feb 2008 Revision in practice revision periods overlap more than expected –MCD solution : weekly / monthly procedures termination of revision period not clearly defined

4 Feb 2008 Sources of IPC8 data EPOQUE and regular DocDB bibliographic data products quarterly IPC8 incremental DVDs revision results files (yet to be released)

4 Feb 2008 Thank you for your attention !