DESIGN-BUILD Design Perspective DESIGN MANAGER RESPONSIBILITES/ATTRIBUTES Manage the Design Single Point of Communication Adaptable to changes.

Slides:



Advertisements
Similar presentations
DESIGN BUILD NATIONAL PERSPECTIVE by Dwight Horne FHWA.
Advertisements

Effectively Structuring and Managing Design- Build Projects Timothy John Murphy and Jason J. Annibale Wednesday November 25, 2009.
Potential Second Access Currently we are working on approval access to 2 nd Avenue under CP tracks as shown in top left photo. Our entrance would be across.
LOS ANGELES UNIFIED SCHOOL DISTRICT JOB ORDER CONTRACTING Copyright © 2004 The Gordian Group, Inc. all rights reserved.
Stanislav Roth Preliminary Agreements in Tendering.
CMGC Contracting at UDOT Program, Projects & Lessons Learned
TH 55 Mill and Overlay Design-Build Project S.P
Integrated Project Delivery at Autodesk, Inc. (A) Team 2: Yusuf Akkoca Tom Bloom Karen Delton Shweta Hire Eric Johnson David Mahzonni.
Your Presenters Lisa Dal Gallo Dave Kirn Regional Executive/Justice Market Leader Partner, LEED AP
Energy Performance Contracting November 3, 2009 Performance Contracting December 11, 2009.
Subcontracting Construction Engineering 380. Subcontracts Owner doesn’t “recognize” subcontractors They are representatives of the contractor Prime usually.
1. A project delivery method describes the process of how a project will be designed and constructed. A project delivery method can be characterized in.
A Match made in Heaven? Connecting you with a builder.
Utah’s Use of CMGC & Project Delivery
Alternative Project Delivery Mechanisms The J. K. Spruce Experience Katherine Yates Assistant General Counsel.
Jeff Carpenter State Construction Engineer WSDOT Design-Build Contracting 2011 AASHTO Subcommittee on Construction Virginia Beach City, VI August 2, 2011.
EFFECTIVE COMMISSIONING PROPOSALS Presented To: High Performance Buildings 2006 Las Vegas, April 7, 2006 Presented By: Rebecca T. Ellis, PE LEED® AP, CCP,
CTC-470 Construction Administration Project Management Concepts.
Facilities Institute July , 2012 Houston, Texas Click to edit Master title style
Legal Perspective on NDOT Alternative Procurements Geoffrey S. Petrov, Nossaman LLP.
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
“BRIDGING” DESIGN-BUILD Residential Suites/Residential Dining Complex 694 Beds in 8 Student Suites / 2-6 Story Buildings 732-Seat Dining in 2-Story Building.
Construction What is “construction” defined as or include?  Building?  Altering ?  Repairing?  Demolishing?  Public Improvements?
Managing Risk to Reduce Construction Claims (And Improve Project Success) Presented by Laurie Dennis, PE, CVS-Life, FSAVE.
DESIGN-BUILD CM Perspective Owner’s Expectation – DB is Master Builder Stakeholder’s Expectation – DB must satisfy their requirements DB’s Expectation.
Office of Traffic, Safety and Technology Module 6 Specifications and Special Provisions Traffic Control Plan Development Course.
Design–Build Contracts G. Hardy Acree Director of Airports Sacramento County Airport System Advantages of of During Turbulent Times.
Value Based Contracting
OPA Office Professionals Assist, LLP Contracts, Proposals and Estimating.
Overview Based on Indiana’s first A+B+C Contract. Why Warranty? What is in it for the Contractor? Lessons Learned?
INNOVATION IN MEGAPROJECTS Systems Integration at London Heathrow Terminal 5.
Ohio River Bridges Project
Objectives 4 Understand the importance of communication in projects 4 Understand the need and importance of project management.
YOUR PROPOSAL CAN LEAD TO CONTRACT AWARDS
The Owner’s Perspective
Option #1 - Award Current Contract Fastest route to begin and complete project and achieve seismic safety Award requires funding  Option #2 - Re-bid SAS.
Ongoing Initiatives & Contracting Impacts 17 September 2009 Ms. Joy White Director of Contracting Space and Missile Systems Center.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
Do you have what it takes to win the next P3 or D-B Project? Steven Kramer, PE Vice President Jacobs.
Project Delivery Methods Part I. What is A Project Delivery Method? The owner’s selection of the organizational structure of the project. Three popular.
Contracting in a Changing Environment Leslie Deneault Defense Acquisition University
Elevating the Quality of Life in the District Contracting and Procurement Division Information Session 2 Request for Proposal November 5, 2015.
Alpha Contracting Sole Source Negotiations between Government and Industry (13 CFR (c)(2))
LACCD Building the Future THOMAS HALL Director Facilities Planning and Development.
Joint Meeting February 7, 2012 Paul Bosco Senior Procurement Executive.
Phase One – Project Initiation and Set Up Project Name Your Area Health Service.
Design-Build Process from All Sides
BCN 4708 Fall 2008 Chapter 1 The Construction Industry.
Design-Build in Minnesota Minnesota Department of Transportation.
CIP2 DESIGN-BUILD PROJECT PRE-PROPOSAL CONFERENCE June 28, 2007.
CONSTRUCTION MANAGEMENT AT RISK Prepared by: Nancy Fouad Carey Attorney AGC Alabama Birmingham Section Meeting November 5, 2012.
Tenders Mary Phelan. EU tenders website  oseLanguage.do oseLanguage.do  All contracts.
Building the Opportunity Analysis Canvas PART 3 OF 3
What Small and Emerging Contractors Need to Know Introduction to Project Delivery Methods © Copyright 2017 NASBP.
AWWA IMS Leadership Forum Project Delivery Systems
Lease-Leaseback Project Delivery Method
Bond Oversight Committee
…. the Angel Perspective
Memorandum of Understanding with GE Osmonics, Inc
BUS 505 Innovative Education-- snaptutorial.com
Green Line Extension Project
Partnering Chase Wells, P.E..
Design-Bid-Build (Ch. 149) vs. Construction Manager at Risk (Ch. 149A)
PROJECT DELIVERY METHODS
Lecture 10 PROCUREMENT Ferdinand FASSA.
Definitions EPC EPCM Design/Build Contract Lump Sum
Presentation on <Proposed Solution/Concept Name>
Project Timeline Pre-proposal Conference July 18, 2016
Delivering Successful Outcomes
These processes can be used to implement F.I.R.E.
Presentation transcript:

DESIGN-BUILD Design Perspective DESIGN MANAGER RESPONSIBILITES/ATTRIBUTES Manage the Design Single Point of Communication Adaptable to changes

DESIGN-BUILD Design Perspective PRE AWARD Project Selection Team Formation Lead development of Technical Approach Proposal Preparation Design Costs

DESIGN-BUILD Design Perspective PROJECT SELECTION Size Type Location Owner Potential for Innovation

DESIGN-BUILD Design Perspective TEAM FORMATION Team early Team Smart Contractor Sub-consultants Contract Terms and Conditions

DESIGN-BUILD Design Perspective DEVELOP PROJECT APPROACH Weekly cycle of meetings Proposal writing Construction costs Risk Mitigation

DESIGN-BUILD Design Perspective POST AWARD Execute technical approach from proposal Develop Credibility Manage Changes Partnering Schedule

DESIGN-BUILD Design Perspective WHAT DOES IT TAKE TO WIN? Better Mousetrap Team with competitive advantage

DESIGN-BUILD Design Perspective Motivating the team Contract Incentives Organized approach Effective communication Stay ahead of the curve

DESIGN-BUILD Design Perspective