SC Project Review of NCSX, April 8-10, 2008 Plant Design Integration, General Arrangement Drawings E. D. Perry.

Slides:



Advertisements
Similar presentations
Page 1 Strategy & Technology Strategy & Technology Joe Gomez BEng (Hons), MSc, MBA, CEng, MEI, MInstR Joe Gomez BEng (Hons), MSc, MBA, CEng, MEI, MInstR.
Advertisements

BIM: Beyond Clash Detection BIM: BEYOND CLASH DETECTIO N A Jobsite Level Perspective THE BIG PICTURE DESIGN & DETAILING INSTALLATION PLANNING TRACKING.
eQuest Quick Energy Simulation Tool
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District October 2008 EDUCATE  ENGAGE  EMPOWER 1.
Constellation Heating and Cooling Building Automation Systems.
NCSX Machine Platform FDR June 15, 2005 Erik D. Perry.
CIVL202 Construction Engineering I Tutorial 8 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
SANITARY DESIGN PRINCIPLES FOR FACILITIES. ZONES OF CONTROL.
9/17/07 ILC Detectors 1 Conventional Utilities Tom Lackowski.
Plans for Diagnostic Removals, Storage, and Re-installations during NSTX Upgrade Outage B. Stratton NSTX Team Meeting 9/13/2011.
Energy Rating Index Performance Path Speaker Name Speaker Affiliation.
1 Institutional Support Services Capital Project Process.
1st Quarter Contractor Business Meeting March 13 th, 2015 Yesika L. Kain/Ben Mulherin Plant Engineering Facilities Session.
INDUSTRIAL & SYSTEMS ENGINEERING
1 David Saenz 1 Hutch Construction in FEH June 08, 2009 Hutch Construction in Far Experimental Hall David Saenz – Project Manager.
Health and Safety Manual Section F9 Working at Height.
David Saenz FAC November 11, 2008 SLAC National Accelerator Laboratory 1 Far Experimental Hutches David Saenz Project Manager.
Unified Nuclear Industry Catalogue of Equipment and Materials Used for Designing, Construction and Operation of NPPs NIZHNY NOVGOROD ENGINEERING COMPANY.
Utilities Drawing Project U N I V E R S I T Y OF K E N T U C K Y.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
A New Paradigm for Utility Coordination Kenny Franklin INDOT Director of Utilities and Railroads.
They also develop power- using machines such as refrigeration and air- conditioning equipment, machine tools, material handling systems, elevators and.
Performance Metrics for EMS Self Assessment & Management Review 30 th Environmental and Energy Symposium & Exhibition April 5 – 8, 2004.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
NCSX NCSX Preliminary Design Review ‒ October 7-9, 2003 G. Oliaro 1 G. Oliaro - WBS 5 Central Instrumentation/Data Acquisition and Controls Princeton Plasma.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Martin Fallier Director, Conventional Facilities Conventional Facilities Value and Risk Management May 8, 2008.
Long-Baseline Neutrino Facility LBNF Summary of FSCF Final Design Parameters Meeting at SURF, 10 Aug 2015 Elaine McCluskey, LBNF Project Manager EFIG 19.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
Update on new alignment kit update 20/3/ Complete table based on a standard table (2400 x 1200 x 150) and a half table (2400 x 600 x 150).
Telescope Integration and Tests Tuesday Afternoon.
SC Project Review of NCSX, April 8-10, 2008 Central Controls and Computing WBS51 & 52 P. Sichta WBS5 Work Package Manager.
NCSX NCSX Design Review Guide May 27, 2005 Wayne Reiersen NCSX.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Method of Accomplishment Marty Fallier Director for Conventional Facilities.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
SC Project Review of NCSX, April 8-10, 2008 NCSX Coil Services P.L. Goranson Work Package 161.
ORKA Preservation Task Force ORKA Preservation Task Force first meeting Wednesday, February 8, Notes by Peter H. Garbincius Notes from meeting are.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62)
SC Project Review of NCSX, April 8-10, 2008 NCSX Fueling and Vacuum Pumping Systems W. Blanchard WBS 21 and 22 Manager.
1 NSTX Outage - Plan 1. 2 NSTX Outage – Diagnostic considerations 2 1.Erik Perry will be the manager of the construction activities in the Test Cell.
Science Complex Renovation Science, SR I, and Fleming Board of Regents Administration & Strategic Planning Committee April 28, 2008.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
Conventional Construction Working Group Meeting Tom Lackowski L2 Conventional Facilities Mu2e Working Group.
1 BROOKHAVEN SCIENCE ASSOCIATES EFAC Review Conventional Facilities Update Marty Fallier Director for Conventional Facilities May 10, 2007.
XLIX Engineering Design Firm © 2010 ENGR/ETGR Definition of Project 1 A project is “…a combination of human and non-human resources pulled together.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
1 PDS MC Requirements Process March 29, 2007 (v2).
NSTX Upgrade Test Cell Initial Schedule Vent vacuum vessel by 9/19 No vessel entry at this time Period of removals prior to start of outage: 9/19 – 10/14.
SC Project Review of NCSX, April 8-10, 2008 NCSX Machine Assembly E. D. Perry.
How the NCSX Project Does Business
FACILITIES PLANNING INTRODUCTION Form Follows Function Form and function should be one, joined in a spiritual union.
Integration and Installation Status for Collaboration Meeting Ans Pardons, 29/9/2015.
Vault Reconfiguration IT DMM January 23 rd 2002 Tony Cass —
Template for DUSEL Meeting with Potential Experiments.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Overview Scope & Schedule Marty Fallier Director for Conventional Facilities.
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
Estimating and Scheduling CEE 492
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
Accelerator Tunnel Layout (G01) Nick Gazis Senior Mechanical Engineer Review of ESS Accelerator Conventional Facility Design.
WBS Experiment Infrastructure: Design Status Discussion Dixon Bogert Prepared for the MicroBooNE Collaboration Meeting 6/17/11.
Operations WBS Dictionary Integrated Control Systems Henrik Carling ESS/ICS Date:
The Design Team Carl James.
Safety in the Neutrino Platform Hall
Process Layout Chapter #6.
CLIC Civil Engineering Update
Engineering Technology Division
Case Study #3 Existing Building Refinance/Rehab MAP 221 D4 SR
DOE Review of the LCLS Project October 2006
Presentation transcript:

SC Project Review of NCSX, April 8-10, 2008 Plant Design Integration, General Arrangement Drawings E. D. Perry

SC Project Review of NCSX, April 8-10, 2008 E. D. Perry - page 2 Plant Design Integration Requirements Allocate space within NCSX Facility - Includes test cell and adjacent areas Maintain 3D model and use it to extract general arrangement drawings Update general arrangement drawings Distribute to all NCSX WBS Managers monthly Interfaces Include input from All WBS elements which have items to install Safety personnel Operations personnel Maintenance/upgrade personnel

SC Project Review of NCSX, April 8-10, 2008 E. D. Perry - page 3 Plant Design Integration Design status 3D plant model developed over the past 8 years Updated general arrangement drawings extracted from the 3D model are being ed to WBS managers and posted on website Brainstorming meetings being held for complex interfaces Cost and schedule estimates To update models during April/May 2008: 10 MD designer 5 MD engineer To maintain model/drawings until CD4 (based on cost of general arrangement drawings for NSTX) 1.5 MD per month engineer 1 MD per month designer

SC Project Review of NCSX, April 8-10, 2008 E. D. Perry - page 4 General Arrangement Drawings NCSX Test Cell Model

SC Project Review of NCSX, April 8-10, 2008 E. D. Perry - page 5 General Arrangement Drawings General Arrangement drawing of NCSX Test Cell above platform

SC Project Review of NCSX, April 8-10, 2008 E. D. Perry - page 6 General Arrangement Drawings General Arrangement drawing of NCSX Test Cell below platform

SC Project Review of NCSX, April 8-10, 2008 E. D. Perry - page 7 General Arrangement Drawings General Arrangement drawing of NCSX Test Cell elevation Basement / first floor / platform / catwalk around top of machine

SC Project Review of NCSX, April 8-10, 2008 E. D. Perry - page 8 3D Model of NCSX Platform Reviewing Life Safety Code requirements Reviewing potential equipment interferences with platform legs Reviewing placement of each item on/under platform to assure that all items can be installed, maintained and de-installed

SC Project Review of NCSX, April 8-10, 2008 E. D. Perry - page 9 Integrated Plant Design Related Items Review installation plans from all WBS Managers to assure that each piece does not interfere with other installations / maintenance / operations Review crane coverage and roll-up door sizes with respect to items which need to be moved into the NCSX Test Cell (NCTC) Also review equipment to be used to move material into NCTC Establish staging areas for items waiting to be installed Coordinate installation of plant services (electric, air, lighting, HVAC etc) with Facilities Division